Loading...
HomeMy WebLinkAboutDAQ-2024-008004Phillips 66 trTAH DEPARTiT'IENT OF EHVI NOHUCT'ITAL OUALITY Pipeline LLC OF AIB QUALITY Certified Mail: 7020 0090 0000 37tt 6022 Return Receipt Requested DIVISION March L9,2024 Utah Depaftment of Environmental Quality Air Quality Division - Compliance Section P.O. Box t44820 Salt Lake City, Utah 84tt4 Re: Annual Seal Gap Inspections REYIEWED t,r,^,@r^r, ,tf,(f{q Pioneer Investments Corporation - Phillips 65 Pipeline LLC, North Salt lake Products Terminal DAQE - AN101330019-14 Tanks zOL,zLL,2L4t 22\ 224 To Whom It May Concern: Please accept this letter as 30-day advanced notice of scheduled inspections of the external floating roof of Tanks 20L,2L1,2L4, and 22L at the above referenced facility. The inspections are currently scheduled to take place after April 18, 2024 and will include visual examination of the floating roof secondary seals and physical measurement of any seal gaps identified during the visual examination. This letter meets the requirements of 40 CFR 60.113b(bx5). Please contact me at morgan.n.bosch@p66.com or (406) 850-5969 if you have any questions. Sincerely,\4Y10'M Morgan Bosch Morgan Bosch Environmental Coordinator Phillips 66 Company 2626 Lillian Ave Billings, MT 59101 Phone 406.850.5969 E-mail: morgan.n.bosch@p66.com Compliance Status: f'i3-c,re r\,rcc(- Fr,.# t o lZ3 Phillips 66 Pipeline LLC- File Env.040.1400