HomeMy WebLinkAboutDAQ-2024-008004Phillips 66
trTAH DEPARTiT'IENT OF
EHVI NOHUCT'ITAL OUALITY
Pipeline LLC
OF AIB QUALITY
Certified Mail: 7020 0090 0000 37tt 6022
Return Receipt Requested
DIVISION
March L9,2024
Utah Depaftment of Environmental Quality
Air Quality Division - Compliance Section
P.O. Box t44820
Salt Lake City, Utah 84tt4
Re: Annual Seal Gap Inspections
REYIEWED
t,r,^,@r^r, ,tf,(f{q
Pioneer Investments Corporation - Phillips 65 Pipeline LLC,
North Salt lake Products Terminal
DAQE - AN101330019-14
Tanks zOL,zLL,2L4t 22\ 224
To Whom It May Concern:
Please accept this letter as 30-day advanced notice of scheduled inspections of the external floating
roof of Tanks 20L,2L1,2L4, and 22L at the above referenced facility.
The inspections are currently scheduled to take place after April 18, 2024 and will include visual
examination of the floating roof secondary seals and physical measurement of any seal gaps
identified during the visual examination. This letter meets the requirements of 40 CFR 60.113b(bx5).
Please contact me at morgan.n.bosch@p66.com or (406) 850-5969 if you have any questions.
Sincerely,\4Y10'M
Morgan Bosch
Morgan Bosch
Environmental Coordinator
Phillips 66 Company
2626 Lillian Ave
Billings, MT 59101
Phone 406.850.5969
E-mail: morgan.n.bosch@p66.com
Compliance Status: f'i3-c,re r\,rcc(-
Fr,.# t o lZ3
Phillips 66 Pipeline LLC- File Env.040.1400