HomeMy WebLinkAboutDSHW-2024-006366CORRECTIVE ACTION SECTION – SITE VISIT REPORT
SITE NAME: _________________________________________ DATE: ______/_______/___________
EPA ID #: _________________________________________ UTCA ID#: ______________________
LOCATION: ___________________________________________________________________________
PROJECT MANAGER: ____________________________________________________________________
SITE STATUS
___ Active Investigation ___ Long-term Institutional Controls in-place
___ Long-term Groundwater Monitoring
___ Closed w/ No More Work Needed OTHER (describe):
PURPOSE OF SITE VISIT
___ Confirm Cleanup Completed
___ Confirm Integrity of Engineering Controls
___ Confirm SMP is Being Complied With
D2# for SMP: DSHW-________-_______________
___ Post-Closure Permit Verification
___ Document Change in Land Usage
___Drive-by (windshield survey)
___Sample Observation &/or Collection
___Site Investigation
___Cleanup Activities Inspection
___Confirm Current Land Usage
OTHER (describe):
FIELD OBSERVATIONS:
SAMPLE COLLECTION
Were Environmental Samples Collected per the approved Sampling & Analysis Plan?
YES ___ NO ___ N/A ___
COMMENTS:
Ongoing Cleanup Activities
Confirmation Sampling
Utah Test and Training Range - Landfill 5 05 16 2024
UT0570090001
Tooele and Box Elder Counties
Karen Wallner
4
4
Samplers Makenna Burr, Tyler Kloewer, and Jonathan Ortiz attached new tubing to the pump in
MW-Lb.
Samplers calibrated the equipment in the morning and logged the calibration results. Samplers
measured the groundwater elevation, purged MW-K using a bladder pump at low-flow until the
groundwater parameters stabilized, and collected the required samples at MW-K in order of
volatility. However, the sampler was observed filling a VOC vial only part way with the end of a
pump cycle and waiting for the next cycle to finish filling the vial. The inspector explained that the
VOC vials should be filled with a single cycle to minimize volatilization. Sampler filled the
remaining VOC vials with a single pump cycle.
Duplicates were collected at MW-K.
4
The required samples were collected at MW-K according to the Sampling and Analysis Plan in the
UTTR Permit.
Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)?
YES ___ NO ___ N/A ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
CURRENT LAND USAGE
___ Residential
___ Commercial
___ Industrial
___ Mixed Commercial w/ Residential
___ Under Construction &/or Development
___ Other: __________________________________
COMMENTS:
FUTURE LAND USAGE
___ Residential ___ Mixed Commercial w/ Residential
___ Commercial ___ Other: (describe below)
___ Industrial ___ Unknow at this time
COMMENTS:
POST-CLEANUP SITE VISITS
Is the Completed Cleanup Remedy Still Protective Based on Current Land Use?
YES ___ NO ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
LONG-TERM INSTITUTION CONTROL(S) VERIFICATION
Are Components or Restrictions of the SMP &/or EC Currently Being Complied with?
YES ___ NO ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
SITE VISIT CONCLUSIONS
RECOMMENDATIONS
ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES ___ NO ___
SIGNATURE:
4
4 Military
4
Site will continue to be used for military purposes.
4
Landfilled waste was removed at Landfill 5. Clean fill was imported for cover at the site.
N/A
Groundwater samples are being collected according to the Permit.
Continue to observe sampling practices at the groundwater sampling events to ensure samples
are being collected properly.
4
Utah Test and Training Range – Landfill 5 Groundwater Sampling
May16, 2024
Sampler measuring depth to groundwater and getting ready to purge the well.
Initial volatiles sampling practice – prior to discussion about minimizing sample volatilization by
filling each vial with a single pump cycle.
Continuing sampling.