Loading...
HomeMy WebLinkAboutDAQ-2024-007971 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-442-24 Site ID 10407 (B1) Quinten Glen Bingham Granite Construction Company 1000 North Warm Springs Road Salt Lake City, Utah 84116 Dear Mr. Bingham: Re: Granite Construction Company – Temporary Relocation/Operation, Notice of Intent – Salt Lake County Your Notice of Intent dated May 7, 2024, to relocate portable aggregate equipment to the temporary project for Granite Construction Company’s Cottonwood facility, located at 6901 South Wasatch Boulevard, Cottonwood Heights, Utah was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has been approved for operation for this temporary project: Astec FT200CC screen with track mounted diesel fired generator Astec GT205 MF cone crusher with track mounted diesel fired generator The State of Utah has permitted portable aggregate equipment for Granite Construction Company for operation in the State of Utah on the Approval Order (AO) DAQE-AN127270014-19 dated February 27, 2019. The above relocation address is a permitted aggregate facility with established production limits. All equipment operating at this site must be in accordance with the current AO for this site DAQE-AN104070026-22 dated December 12, 2022. The production of aggregate from this temporary project when combined with the permanent equipment’s production cannot exceed the 12-month rolling limits as per Condition II.B.1.a.B of this AO. The track mounted engines shall be compliant with Conditions II.B.1.c and II.B.1.c.1. Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. The operational days per site cannot be extended beyond the stipulated 365 consecutive day period. 6 Ú Þ Û Ù Û Ý DAQC-442-24 Page 2 The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all applicable portable crushers, screens, and attached conveyors. Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted Temporary Relocation Form cc: Salt Lake County Health Department 4 * - - $ . — 4 @ C v A ? A C @ B w A E ˜ Susan Weisenberg <sweisenberg@utah.gov> Portable/Temporary Relocation Form 1 message noreply@qemailserver.com <noreply@qemailserver.com>Tue, May 7, 2024 at 1:17 PM Reply-To: trigger@qemailserver.com To: sweisenberg@utah.gov Susan/Chad: Site # -- Granite Construction Company has requested a Temporary Relocation. Please see the information below. Any attachments can be access by clicking on the links. Recipient Data: Time Finished: 2024-05-07 13:17:04 MDT IP: 161.69.114.49 ResponseID: R_21jOjbcj36sJr2J Link to View Results: Click Here URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/ ZTxPyubuIcO64v7mPVMSxyQB63v4ldQN4mPJ-%2EJ0B1mTjkqSC-b128lItzcomq49XF01IIofuS-dJciicKq6m6PT8Vk- zVjQbVuxM2zAShqkIkicO0GWe7cmlFReGVE5sKh5UegFPbtz3Je-XVNV0UJsyihJ3qllSWvypyATbgQj7E nPClwvDlMp6GWQxYcwYQUHpIGy92s5Ymw8HjTaPaJrwxUP9%2E7QuXlkwrdhZ2Xfkl3zFbBnf9A7qw bCeVu6NutWidH4ZP617SPGlzyD7NZsxxOeY33eiBg7exi1ac7%2EuiDtsfBB9lSZ-e6RDhwVBmJc%2EXuwndxuptV5V3LnAQ Response Summary: Please fill out the information below: Contact Person: Quin Bingham Company Name: Granite Construction Company Mailing Address: 1000 N Warm Springs Road City: Salt Lake City Zip: 84116 Phone Number: 4357704319 Email: quin.bingham@gcinc.com Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea... Yes All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo... 321cf8a7-9d25-4408-b799-26f3295f0f1f Briefly give directions to the site and/or physical address: 1000 N Warm Springs Road Proposed Relocation Information: Closest City Cottonwood Heights County Salt Lake UTM X Coordinates 40.622720 UTM Y Coordinates -111.790988 Approximate distance to the nearest house/business 0.27 UTM X Coordinates to nearest house/business 40.618775 UTM Y Coordinates to nearest house/business -111.789838 Does this site currently have a permit with DAQ? Yes If yes, what is the Permit (DAQ-AN) # ? DAQE-AN104070026-22 5/7/24, 4:51 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1798422591184688648%7Cmsg-f:1798422591184688648&…1/2 If yes, what is the Permit Holder's Name? Granite Construction Company Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX) DAQE-AN127270014-19 Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine... 1 Equipment Type trackmounteded screen Make/Model Astec FT200CC Design Capacity 200 TPH 2 Equipment Type trackmounted cone Make/Model Astec GT205 MF Design Capacity 200 TPH Please attach a site diagram showing the equipment layout and general site dimensions for this re... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_CleiE7chvqSq57H Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for... No Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re... Total Hours of operation per 24 hr period 16 Starting time of operation (am/pm) 0600 Ending time of operation (am/pm) 2200 Maximum hourly production rate for project 16 Expected startup date 05/20/2024 Expected completion date 05/20/2025 What type of application is this for? New Application In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1mCa3yNOtUeeVeT Owner/Operator Representative: https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_3kB1gXgMUux3SdP 5/7/24, 4:51 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1798422591184688648%7Cmsg-f:1798422591184688648&…2/2