HomeMy WebLinkAboutDDW-2024-006490System Name:
System Number:
Address:
City, State, Zip:
277
Name:
Title:
Address:
City, State, Zip:
Phone No.:
E-mail Address:
Name:
Company:
Address:
City, State, Zip:
Phone No.:
E-mail Address:
Name:
Company:
Address:
City, State, Zip:
E-mail Address:
Name:
Duration (hrs):2
Jun-24
jbrimhall@sunrise-eng.com
Richfield, UT 84701
635 North Main, Suite 675
801-669-3613Phone No.:
8b. If YES, specify rule reference below [R309-511-4(1)(a)(i)-(iv)]:
Phone No.:435-528-7070
Jed Hansen
9. State or Federal Agency Funding:
8a. Is the project exempt from the Hydraulic Model Report requirement? [see
R309-511-4(1)(a)(i) through (iv)]
[ERC = Equivalent Residential Connection; SRF = State Revolving Fund]
Aug-24
3. Professional Engineer (PE) Responsible for System Oversight (if
applicable)
4. Professional Engineer (PE) Responsible for Design of this Project
Begin Construction:
Complete Construction:
Sunrise Engineering
7. Anticipated Construction Schedule (if applicable):
Advertise for Bids:
5. Local Fire Code Official & Required Fire Flow for Proposed Project
May-24
Richfield, UT 84701
435-743-6151
jralphs@sunrise-eng.com
635 North Main, Suite 675
2. Name and Address for Official Correspondence (Mayor, Public Works
Director, Administrative Contact, etc.)
Submit (preferably by email) the completed PNF with plans and specifications to DDW.
Email completed form & documents to ddwpnf@utah.gov or mail to:Utah Division of Drinking Water
P.O. Box 144830, Salt Lake City, Utah 84114-4830, (801) 536-4200
Mayfield, UT 84643
PO Box 541
1. Public Water System (PWS) Information
Mayfield Water Department
20006
Req'd flow (gpm):1500
Loan #
City, State, Zip:Gunnison, UT 84634
E-mail Address:
PROJECT NOTIFICATION FORM (PNF)
Utah Division of Drinking Water (DDW)
Present No. of ERCs system is obligated to serve:
No. of ERCs this project will add:
565
24
Population Served:
6. Project Description (provide a unique facility name, location, and sufficient
details to specifically identify the project):
DDW - Plan Review File No.:
DDW - Date Received:
Please provide the following information for a proposed Public Drinking Water Project.
For a new public water system (PWS) also complete a New PWS Application Form (see DDW website).
Jun-24Sunrise Engineering Bid Opening:
https://deq.utah.gov/drinking-water/plan-review-program-tools
Checklists for use in preparing plans for review by DDW are available at:
Mayfield Estates Subdivision Phase IV includes the development of 24 residential
lots and supporting infrastructure including 2,000' of new 8" PVC waterline, 3 fire
hydrants, and service meters to each lot.
Jesse Ralphs
Jason Brimhall
Garrick Willden
Yes No
Drinking Water Board (SRF or FSRF)
Community Impact Board (CIB)
None
Other (Specify)
DDW- Eng-0004 Page 1 of 1 3/22/2018
March 7, 2024
Mr. John Chartier
Division of Drinking Water
Subject: Mayfield Estates Phase IV Subdivision
Dear Mr. Chartier,
We have prepared the plan set for the Mayfield Estates Phase IV Subdivision. The subdivision will
be located north of Mayfield Town along State Highway 137, Utah.
The Project has been analyzed for compliance with the Rules. The analysis was performed based on
a review of the existing system’s physical attributes and topography, along with the outputs from a
hydraulic model created in InfoWater Pro.
There are 5 pressure zones in the Town and the entire proposed development resides in the lowest
pressure zone. The current phase will connect to the phases of the project previously built. The
pressures for the proposed development are listed below:
Peak day demand: 71.7 psi
Peak instantaneous demand: 71.6 psi
Fire flow + peak day demand: 20 psi
Mayfield Town desires 1,500 gpm minimum available fire flow to residents. The fire flows available
in the proposed development range from 1,600 gpm to 1,700 gpm.
If you have any questions or concerns let us know.
Sincerely,
Jason Brimhall, P.E.
Project Engineer
635 North Main, Suite 675, Richfield, Utah 84701