Loading...
HomeMy WebLinkAboutDAQ-2024-0051921 DAQC-216-24 Site ID 10264 (B4) MEMORANDUM TO: STACK TEST FILE – MID-AMERICA PIPELINE COMPANY, LLC – Moab Pump Station THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager FROM: Paul Bushman, Environmental Scientist DATE: March 5, 2024 SUBJECT: Source: One (1) Solar Saturn 10-T1302 Unit ID: T1 SN: 21114 Location: Remote location 8 miles south of Moab, Grand County, Utah Contact: Patrick Abbott – 970-263-3016 Tester: Oasis Emissions Consultants, Inc. Site ID #: 10264 Permit/AO #: DAQE-AN102640004-07, dated January 5, 2007 Subject: Review of Pretest Protocol dated March 4, 2024 On March 4, 2024, Utah Division of Air Quality (DAQ) received a test notification for the testing of the above listed unit located at Moab Pump Station in Grand County, Utah. Testing will be performed during the April 2-4, 2024, test campaign to determine compliance with the emission limits found in conditions 10 and 11 of Approval Order DAQE-AN102640004-07 and 40 CFR Part 60, Subpart GG. PROTOCOL CONDITIONS: 1. RM 1 used to determine sample velocity traverses; OK 2. RM 2 used to determine stack gas velocity and volumetric flow rate; OK 3. RM 3A used to determine dry molecular weight of the gas stream; OK 4. RM 4 used to determine moisture content; OK 5. RM 7E used to determine NOx emissions; OK 6. RM 10 used to determine CO emissions; OK DEVIATIONS: No deviations stated in the protocol. CONCLUSION: The protocol appears to be acceptable. RECOMMENDATION: Send protocol review and test date confirmation notice. ATTACHMENTS: Mid-America Pipeline Company, LLC test notification and protocol. 2 3 4 5 6 7