HomeMy WebLinkAboutDAQ-2024-0051921
DAQC-216-24
Site ID 10264 (B4)
MEMORANDUM
TO: STACK TEST FILE – MID-AMERICA PIPELINE COMPANY, LLC – Moab
Pump Station
THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager
FROM: Paul Bushman, Environmental Scientist
DATE: March 5, 2024
SUBJECT: Source: One (1) Solar Saturn 10-T1302 Unit ID: T1 SN: 21114
Location: Remote location 8 miles south of Moab, Grand County, Utah
Contact: Patrick Abbott – 970-263-3016
Tester: Oasis Emissions Consultants, Inc.
Site ID #: 10264
Permit/AO #: DAQE-AN102640004-07, dated January 5, 2007
Subject: Review of Pretest Protocol dated March 4, 2024
On March 4, 2024, Utah Division of Air Quality (DAQ) received a test notification for the testing of the
above listed unit located at Moab Pump Station in Grand County, Utah. Testing will be performed during
the April 2-4, 2024, test campaign to determine compliance with the emission limits found in conditions
10 and 11 of Approval Order DAQE-AN102640004-07 and 40 CFR Part 60, Subpart GG.
PROTOCOL CONDITIONS:
1. RM 1 used to determine sample velocity traverses; OK
2. RM 2 used to determine stack gas velocity and volumetric flow rate; OK
3. RM 3A used to determine dry molecular weight of the gas stream; OK
4. RM 4 used to determine moisture content; OK
5. RM 7E used to determine NOx emissions; OK
6. RM 10 used to determine CO emissions; OK
DEVIATIONS: No deviations stated in the protocol.
CONCLUSION: The protocol appears to be acceptable.
RECOMMENDATION: Send protocol review and test date confirmation notice.
ATTACHMENTS: Mid-America Pipeline Company, LLC test notification and protocol.
2
3
4
5
6
7