1
DAQC-167-24
Site ID 10327 (B5)
MEMORANDUM
TO: FILE – INTERMOUNTAIN POWER SERVICE
THROUGH: Harold Burge, Major Source Compliance Section Manager
FROM: Rob Leishman, Environmental Scientist
DATE: February 23, 2024
SUBJECT: Intermountain Power Service (IPP), Major, NSPS, Title V, Acid Rain,
Millard County, FRS # UT00000049002700010
INSPECTION TYPE: State Electronic Data Report (SEDR) Review
REVIEW DATE: February 23, 2024
SOURCE LOCATION: 850 West Brush Wellman Road/Millard County
SOURCE CONTACT: Mike Ferrell – 435-864-6487
APPLICABLE
REGULATIONS: Title V Operating Permit 2700010006
Date of Permit: November 21, 2023
Date of Last Revision: November 21, 2023
SOURCE INSPECTION
EVALUATION: This review will only address the findings of the quarterly report.
Approval Order and Title V permit conditions addressing continuous
emission monitoring requirements will be addressed in IPP’s relative
accuracy performance specification test review memorandum.
SEDR Review
Fourth Quarter 2023
% Monitor Availability (MA) Performance Test Dates
(N/A to Opacity)
Summary of Excess Emissions During
Point Source Operation
Point
Source
Op.
hrs. Channel MA CGA Lin RATA Point
Source Channel Hrs. Limitation
Unit 1 2208 SO2 100% 10/19/23 10/19/23 07/12/23 Unit 1 Opacity 0.00 20 % - 6
min.
Unit 1 2208 CO2 100% 10/19/23 10/19/23 07/12/23 Unit 1 SO2 0.00
0.138
lb/mmbtu -
30 DRA
1 8 2
2
Fourth Quarter 2023
% Monitor Availability (MA) Performance Test Dates
(N/A to Opacity)
Summary of Excess Emissions During
Point Source Operation
Point
Source
Op.
hrs. Channel MA CGA Lin RATA Point
Source Channel Hrs. Limitation
Unit 1 2208 Opacity 99% Unit 1 NOx 0.00
0.461
lb/mmbtu -
30 DRA
Unit 1 2208 SO2 100% 10/19/23 10/19/23 07/12/23 Unit 2 Opacity 0.00 20 % - 6
min.
Unit 1 2208 NOx 100% 10/19/23 10/19/23 07/10/23 Unit 2 SO2 0.00
0.138
lb/mmbtu -
30 DRA
Unit 1 2208 CO2 100% 10/19/23 10/19/23 07/12/23 Unit 2 NOx 0.00
0.461
lb/mmbtu -
30 DRA
Unit 2 746 SO2 100% 10/19/23 10/19/23 07/13/23
Unit 2 746 CO2 100% 10/19/23 10/19/23 07/13/23
Unit 2 746 Opacity 99%
Unit 2 746 SO2 100% 10/19/23 10/19/23 07/13/23
Unit 2 746 NOx 100% 10/19/23 10/19/23 07/11/23
Unit 2 746 CO2 100% 10/19/23 10/19/23 07/13/23
Summary of SO2 Emission Reduction
Percent Removal Required
% Reduction
Point
Source Channel Min Max Days in violation Status
Unit 1 SO2 95% 98% 90% 0 In compliance
Unit 2 SO2 95% 97% 90% 0 In compliance
Excess Emission Report - Hourly Summary
Point
Source Channel
Startup
&
Shutdown
Control
Equipment
Problems
Process
Problems
Other
Known
Causes
Unknown
Causes
Emission
Limit
Unit 1 Opacity 0 0 0 0 0 20 % - 6 min.
Unit 1 SO2 0 0 0 0 0 0.138 lb/mmbtu - 30 DRA
Unit 1 NOx 0 0 0 0 0 0.461 lb/mmbtu - 30 DRA
Unit 2 Opacity 0 0 0 0 0 20 % - 6 min.
Unit 2 SO2 0 0 0 0 0 0.138 lb/mmbtu - 30 DRA
Unit 2 NOx 0 0 0 0 0 0.461 lb/mmbtu - 30 DRA
3
CMS Performance Summary - Hourly Summary
Point
Source Channel Monitor
Malfunction
Non-monitor
Malfunction
QA
Calibrations
Other
Known
Causes
Unknown
Causes
Unit 1 SO2 0 0 0 0 0
Unit 1 CO2 0 0 0 0 0
Unit 1 Opacity 0 0 13 0 0
Unit 1 SO2 0 0 0 1 0
Unit 1 NOx 0 0 0 1 0
Unit 1 CO2 0 0 0 1 0
Unit 2 SO2 0 0 0 0 0
Unit 2 CO2 0 0 0 0 0
Unit 2 Opacity 0 0 7 0 0
Unit 2 SO2 0 0 1 0 0
Unit 2 NOx 0 0 1 0 0
Unit 2 CO2 0 0 1 0 0
Type Code 280 (COMS Attenuator Filters) Procedure 3
Point Source &
Location
Attenuator
I.D.
Attenuator
Certification
Date
Certified
Attenuator
Opacity
OPLR,
SECR,
or
PLCF,
Corrected
Opacity
Value
Range
Low,
Mid,
&
High
Certification
1-year or
5-year
Unit 1 -
Scrubber Duct S10404 12/23/22 26.81 0.56 16.04 Low 1
Unit 1 -
Scrubber Duct S10348 12/23/22 37.20 0.56 22.93 Mid 1
Unit 1 -
Scrubber Duct S10246 12/23/22 57.86 0.56 38.36 High 1
Unit 2 -
Scrubber Duct S10405 12/23/22 26.71 0.56 15.97 Low 1
Unit 2 -
Scrubber Duct S10349 12/23/22 37.44 0.56 23.1 Mid 1
Unit 2 -
Scrubber Duct S10425 12/23/22 58.58 0.56 38.96 High 1
4
Type Code 281 (Procedure 3 - COMS Filter Audit Calibration Error)
Point
Source Location Audit Date
Opacity Monitor Response
(Average of 5) Mean Difference Calibration
Error (≤ 3%) Low Mid High
Unit 1 Scrubber Duct 10/18/23 16 0.350 0.362
Unit 1 Scrubber Duct 10/18/23 23 0.260 0.268
Unit 1 Scrubber Duct 10/18/23 38 0.540 0.560
Unit 2 Scrubber Duct 10/20/23 16 -0.300 0.002
Unit 2 Scrubber Duct 10/20/23 23 -0.290 -0.027
Unit 2 Scrubber Duct 10/20/23 39 0.020 0.279
Type Code 282 (Annual Zero Alignment Audit) Procedure 3
Point
Source Location Audit
Date
Alternative
Zero
Alignment
(Yes or No)
COM Clear
Condition
Zero
Response
(CCZR)
COM
Simulated
Zero
Response
(CSZR)
Zero
Alignment
Error
Difference
(CCZR)-
(CSZR)
Adjustment to
COM
Simulated Zero
Response
(CSZR)
(Yes or No)
Unit 1 Scrubber Duct 10/11/22 No 0.00 0 0 Yes
Unit 2 Scrubber Duct 10/11/22 No 0.00 0.002 0 Yes
Summary of SO2 Emission Reduction
Percent Removal Required Percent
Reduction
Point
Source Channel Min Max Days in violation
Unit 1 SO2 95% 98% 90% 0
Unit 2 SO2 95% 97% 90% 0
Pollutant Concentration
Exceeded Span of CEM
Monitor Outage During
Point Source Operation
Alternate
Sampling CEM Modifications
0 Hours 26 Hours 0 Hours 0 Events
5
SOURCE INSPECTION
SUMMARY EVALUATION: IPP maintains its CEMS as required in R307-170 and 40 CFR 60.13.
CURRENT
RECOMMENDATIONS: All deviations appear to be a result of breakdown or process related
problems that do not warrant issuing a violation. Periods of excess
emissions that were recorded by the CMS in service on each point source
during this reporting period are summarized in the SEDR and described
in Pivot Table 400 “Excess Emissions Review.”
IPP was in compliance during this reporting period. No further
enforcement action is recommended.
IPP’s NSPS monitoring system meets the performance standards of 40
CFR 60, Appendix B Performance Specifications.
IPP’s acid rain monitoring system meets the performance standards of 40
CFR 75 Acid Rain Performance Specifications.
HPV: No
RECOMMENDATION
FOR NEXT INSPECTION: Check DAS for daily zero and span drift.
Check the QC program to ensure that monitor drift is being tracked and
that the source can identify excessive drift.
ATTACHMENTS: Excel spreadsheet review
Intermountain Power Service Corporation
850 West Brush Wellman Road, Delta, Utah, 84624 / Telephone: (435) 864-4414 / FAX: (435) 864-6670 / Fed. I.D. #87-0388573
January 29, 2024
Mr. Bryce Bird, Director
Utah Division of Air Quality
195 North 1950 West
P.O. Box 144820
Salt Lake City, Utah 84114-4820
Dear Director Bird:
Units 1 and 2 Fourth Quarter 2023 Emissions Report
Operating Permit #2700010006
As part of Intermountain Power Service Corporation's reporting requirements for the Intermountain
Generating Station, we are submitting Units 1 and 2 Fourth Quarter, 2023, Emissions Report in ASCII
electronic format for your review. The report has been electronically transmitted to Mr. Rob Leishman
of the UDAQ.
If you have any questions or comments, please contact Mr. Michael Ferrell, Lead Technical Analyst of
Technical Services, at (435) 864-6487 or michael.ferrell@ipsc.com.
Sincerely,
Jon A. Finlinson
President and Chief Operations Officer and Responsible Official
MAF/HBI:he
cc: Gregory S. Huynh
Tamer Ellyahky
Mike Utley
Intermountain Power Service Corporation
850 West Brush Wellman Road, Delta, Utah, 84624 / Telephone: (435) 864-4414 / FAX: (435) 864-6670 / Fed. I.D. #87-0388573
January 29, 2024
Mr. Bryce Bird, Director
Utah Division of Air Quality
195 North 1950 West
P.O. Box 144820
Salt Lake City, Utah 84114-4820
Dear Director Bird:
Signed Statement Deviation Report
Units 1 and 2 Fourth Quarter 2023
As required by R307-415-5d, this signed statement is being submitted for Units 1 and 2 for the Fourth
Quarter 2023, Quarterly Report.
1. For any periods for which opacity, sulfur dioxide, or nitrogen oxide emission data are
not available, changes were not made in the operation of the emission control system.
2. The required continuous monitoring system calibration, span and drift checks, and other
periodic audits have been performed as specified.
3. The data used to show compliance was obtained in accordance with approved methods
and procedures of Subpart Da and is representative of plant performance.
4. The minimum data requirements have been met.
5. Compliance with the standards has been achieved during the reporting period.
Under penalty of law, all information contained in the report is truthful, accurate, and is a complete
record of all monitoring related events which occurred during the reporting period.
This letter provides notice that this report constitutes a deviation report as required under Section
I.S.2.c and Section II.B.2.e.3 of our Title V Operating Permit #2700010006. This report is considered
prompt notification as stated in Section II.B.2.e.3.d of our Operating Permit.
Mr. Bryce Bird
January 29, 2024
Page 2
I certify, based on information and belief formed after reasonable inquiry, the statements and
information in the document is true, accurate, and complete.
Sincerely,
Jon A. Finlinson
President and Chief Operations Officer and Responsible Official
MAF/HBI:he
cc: Gregory S. Huynh
Tamer Ellyahky
Mike Utley
IPP EER 4Q2023
Point Source Information Late Expired Cal. Gas Valid Cal. Gas Days Yes No
1 Type Code 100
(Company Information)Type Code Company Manager Company Name AIRS # Phone Number
Environmental
Contact
1 100 Jon A. Finlinson 02700010 435-864-4414 Michael Ferrell
1 100 0 0 0 0
1 Type Code 110
(Point Source Identification)Type Code Point Source
Quarter
1 - 4 Year
Point Source
Operating Hrs. in
Quarter
1 110 4 2023 2208
1 110 4 2023 746
1 110 0 0 0
1 Type Code 200
(Monitor Identification)Type Code Point Source Channel Manufacturer Model No. Monitor SN Low Span High Span Installation Date
Monitor
Location
1 200 CO2 TECO 410i 834333319 20 0 4/15/2009 Stack
1 200 CO2 TECO 410i 834333318 20 0 4/8/2009 Scrubber Inlet
1 200 SO2 TECO 43i 534613720 500 1000 11/27/2005 Scrubber Inlet
1 200 NOx TECO 42i 534613722 500 1000 11/28/2005 Stack
1 200 Opacity Teledyne Monitor Labs Lighthawk 560 5602579 100 0 3/24/2014 Scrubber Inlet
1 200 SO2 TECO 43i 534613714 50 1000 11/28/2005 Stack
1 200 CO2 TECO 410i 834333320 20 0 4/15/2009 Stack
1 200 CO2 TECO 410i 834333317 20 0 4/15/2009 Scrubber Inlet
1 200 SO2 TECO 43i 534613725 500 1000 11/27/2005 Scrubber Inlet
1 200 NOx TECO 42i 534613723 500 1000 11/28/2005 Stack
1 200 Opacity Teledyne Monitor Labs Lighthawk 560 5602580 100 0 4/1/2014 Scrubber Inlet
1 200 SO2 TECO 43i 534613718 50 1000 11/28/2005 Stack
1 200 0 0 0 0 0 0 1/0/1900 0
1
Type Code310
(Excess Emissions)
SUMMARY REPORT
Type Code Channel
Total Hours of Excess
Emissions
Excess Emissions -
% of Total
Operating Hours
RC 701 Hours -
start
up/Shutdown
RC 702 Hours-
Control Equipment
Problems
RC 703 Hours -
Process Problems
RC 704, 706, 707
Hours -Other Known
Causes
RC 705 Hours -
Unknown
Causes
Emission
Limitation
Emission
Limitation
Units
Emission
Limitation
Averaging
Period
1 TRUE 310 Opacity 0 0.00% 0 0 0 0 0 20 % 6 min.
1 TRUE 310 SO2 0 0.00% 0 0 0 0 0 0.138 lb/mmbtu 30 DRA
1 TRUE 310 NOx 0 0.00% 0 0 0 0 0 0.461 lb/mmbtu 30 DRA
1 TRUE 310 Opacity 0 0.00% 0 0 0 0 0 20 % 6 min.
1 TRUE 310 SO2 0 0.00% 0 0 0 0 0 0.138 lb/mmbtu 30 DRA
1 TRUE 310 NOx 0 0.00% 0 0 0 0 0 0.461 lb/mmbtu 30 DRA
1 310 0 0 0 0 0 0 0 0 0
1 Type Code 300 (CMS
Performance Summary) Type Code Channel
Point Source Operating
Hours
Downtime - % of
Total Operating
Hours
Total CMS
Downtime
RC 721 Hours -
Monitor
Malfunction
RC 722 Hours -
Non-monitor
Malfunction
RC 723 Hours -
QA Calibrations
RC 724 Hours -
Other Known
Causes
RC 725
Hours -
Unknown
Causes
1 TRUE 300 SO2 2208 0.00% 0 0 0 0 0 0
1 TRUE 300 CO2 2208 0.00% 0 0 0 0 0 0
1 TRUE 300 Opacity 2208 0.59% 13 0 0 13 0 0
1 TRUE 300 SO2 2208 0.05% 1 0 0 0 1 0
1 TRUE 300 NOx 2208 0.05% 1 0 0 0 1 0
1 TRUE 300 CO2 2208 0.05% 1 0 0 0 1 0
1 TRUE 300 SO2 746 0.00% 0 0 0 0 0 0
1 TRUE 300 CO2 746 0.00% 0 0 0 0 0 0
1 TRUE 300 Opacity 746 0.92% 6.9 0 0 6.9 0 0
1 TRUE 300 SO2 746 0.13% 1 0 0 1 0 0
1 TRUE 300 NOx 746 0.13% 1 0 0 1 0 0
1 TRUE 300 CO2 746 0.13% 1 0 0 1 0 0
1 300 0 0 0 0 0 0
1
Type Code 250
(Performance Specification
RATA Results)
Type Code Channel
Date of Most Current
RATA
Date of Preceding
RATA
Months Between
RATA's
Units of
Measurement CEM Value Reference Method
Value
Relative
accuracy Pass/ Fail
1 352 Days 250 SO2 07/12/23 07/25/22 12 lbs/mmbtu 0.0934 0.96 3.90% Pass
1 352 Days 250 CO2 07/12/23 07/25/22 12 CO2 12.554 12.367 2.74% Pass
1 354 Days 250 SO2 07/10/23 07/21/22 12 lbs/mmbtu 0.041 0.042 6.88% Pass
1 354 Days 250 NOx 07/10/23 07/21/22 12 lbs/mmbtu 0.327 0.318 3.96% Pass
1 354 Days 250 CO2 07/10/23 07/21/22 12 CO2 11.778 11.622 2.78% Pass
1 352 Days 250 SO2 07/13/23 07/26/22 12 lbs/mmbtu 1.054 1.096 4.46% Pass
1 352 Days 250 CO2 07/13/23 07/26/22 12 CO2 11.171 10.922 2.82% Pass
1 354 Days 250 SO2 07/11/23 07/22/22 12 lbs/mmbtu 0.056 0.055 8.74% Pass
1 354 Days 250 NOx 07/11/23 07/22/22 12 lbs/mmbtu 0.285 0.275 4.76% Pass
1 354 Days 250 CO2 07/11/23 07/22/22 12 CO2 11.433 11.333 2.54% Pass
1 0 Days 250 0 01/00/00 01/00/00 0 0 0 0 0.00% 0
Point Source
Point Source
Point Source
Unit 1
Unit 2
0
Unit 2
Unit 2
Unit 2
Unit 2
0
Unit 1
Unit 2
Unit 2
Unit 1
Unit 1
Unit 1
Unit 2
Unit 2
Unit 1
Unit 1
Unit 1
Unit 2
0
IPP
0
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
0
Unit 1
Unit 1
0
Unit 2
Unit 2
Unit 2
Unit 2
Unit 1
Unit 1
Unit 1
Unit 1
Unit 2
Unit 1
IPP EER 4Q2023
1 Type Code 260
(CGA Results)Type Code Channel Date Audit Point No. Cylinder ID
Cylinder Expiration
Date
Type of
Certification
Units of
Measurement CEM Value Cylinder
Value
Precision
%Pass/ Fail Range - High or
Low
1 Valid Cal. Gas 260 CO2 10/19/23 1 CC435440 03/25/24 P1 PERCENT 4.76 4.87 -2.28% P LOW
1 Valid Cal. Gas 260 CO2 10/19/23 2 DT0036279 01/28/25 P1 PERCENT 11.03 11.06 -0.31% P LOW
1 Valid Cal. Gas 260 CO2 10/19/23 1 SA14046 03/26/29 P1 PERCENT 5.1 5.09 0.16% P LOW
1 Valid Cal. Gas 260 CO2 10/19/23 2 DT0036279 01/28/25 P1 PERCENT 11.07 11.06 0.10% P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 1 SA14046 03/26/29 P1 PPM 122.94 121.3 1.35% P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 1 CC506716 01/31/26 P1 PPM 274.59 278 -1.22% P HIGH
1 Valid Cal. Gas 260 SO2 10/19/23 2 CC506716 01/31/26 P1 PPM 273.82 278 -1.51% P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 2 EB0058219 07/17/27 P1 PPM 544.95 551 -1.10% P HIGH
1 Valid Cal. Gas 260 NOx 10/19/23 1 CC435440 03/25/24 P1 PPM 125.18 124.5 0.55% P LOW
1 Valid Cal. Gas 260 NOx 10/19/23 2 DT0036279 01/28/25 P1 PPM 276.55 279 -0.88% P LOW
1 Valid Cal. Gas 260 NOx 10/19/23 1 CC506716 01/31/26 P1 PPM 274.46 280 -1.98% P HIGH
1 Valid Cal. Gas 260 NOx 10/19/23 2 EB0058216 07/17/27 P1 PPM 537.49 559 -3.85% P HIGH
1 Valid Cal. Gas 260 SO2 10/19/23 1 CC435440 03/25/24 P1 PPM 12.54 12.51 0.26% P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 2 DT0036279 01/28/25 P1 PPM 26.71 26.8 -0.35% P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 1 CC506716 01/31/26 P1 PPM 277.67 278 -0.12% P HIGH
1 Valid Cal. Gas 260 SO2 10/19/23 2 EB0058216 7/17/27 P1 PPM 556 551 0 P HIGH
1 Valid Cal. Gas 260 CO2 10/19/23 1 CC435440 3/25/24 P1 PERCENT 5 5 0 P LOW
1 Valid Cal. Gas 260 CO2 10/19/23 2 DT0036279 1/28/25 P1 PERCENT 11 11 0 P LOW
1 Valid Cal. Gas 260 CO2 10/19/23 1 SA14046 3/26/29 P1 PERCENT 5 5 0 P LOW
1 Valid Cal. Gas 260 CO2 10/19/23 2 DT0036279 1/28/25 P1 PERCENT 11 11 0 P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 1 SA14046 3/26/29 P1 PPM 120 121 0 P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 1 CC506716 1/31/26 P1 PPM 278 278 0 P HIGH
1 Valid Cal. Gas 260 SO2 10/19/23 2 CC506716 1/31/26 P1 PPM 270 278 0 P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 2 EB0058219 7/17/27 P1 PPM 549 551 0 P HIGH
1 Valid Cal. Gas 260 NOx 10/19/23 1 CC435440 3/25/24 P1 PPM 124 125 0 P LOW
1 Valid Cal. Gas 260 NOx 10/19/23 2 DT0036279 1/28/25 P1 PPM 279 279 0 P LOW
1 Valid Cal. Gas 260 NOx 10/19/23 1 CC506716 1/31/26 P1 PPM 280 280 0 P HIGH
1 Valid Cal. Gas 260 NOx 10/19/23 2 EB0058216 7/17/27 P1 PPM 544 559 0 P HIGH
1 Valid Cal. Gas 260 SO2 10/19/23 1 CC435440 3/25/24 P1 PPM 13 13 0 P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 2 DT0036279 1/28/25 P1 PPM 27 27 0 P LOW
1 Valid Cal. Gas 260 SO2 10/19/23 1 CC506716 1/31/26 P1 PPM 279 278 0 P HIGH
1 Valid Cal. Gas 260 SO2 10/19/23 2 EB0058216 7/17/27 P1 PPM 547 551 0 P HIGH
1 260 0 1/0/00 0 0 1/0/00 0 0 0 0 0 0 0
1 Type Code 270
(Linearity Test Results)Type Code Channel Date Audit Point No. Cylinder ID
Cylinder Expiration
Date
Type of
Certification
Units of
Measurement CEM Value Cylinder
Value
Precision
%Pass/ Fail Range - High or
Low
1 Valid Cal. Gas 270 CO2 10/19/23 Low CC435440 03/25/24 P1 PERCENT 4.76 4.87 228.00% P LOW
1 Valid Cal. Gas 270 CO2 10/19/23 Mid DT0036279 01/28/25 P1 PERCENT 11.03 11.06 31.00% P LOW
1 Valid Cal. Gas 270 CO2 10/19/23 High DT0013190 10/29/24 P1 PERCENT 18.45 18.84 209.00% P LOW
1 Valid Cal. Gas 270 NOx 10/19/23 Low CC435440 03/25/24 P1 PPM 125.18 124.5 55% P LOW
1 Valid Cal. Gas 270 NOx 10/19/23 Mid DT0036279 01/28/25 P1 PPM 276.55 279 88% P LOW
1 Valid Cal. Gas 270 NOx 10/19/23 Low CC506716 01/31/26 P1 PPM 274.46 280 198% P HIGH
1 Valid Cal. Gas 270 NOx 10/19/23 High DT0013190 10/29/24 P1 PPM 446.02 446 0.00% P LOW
1 Valid Cal. Gas 270 NOx 10/19/23 Mid EB0058216 07/17/27 P1 PPM 537.49 559 385.00% P HIGH
1 Valid Cal. Gas 270 NOx 10/19/23 High DT0008522 04/22/29 P1 PPM 865 892 303.00% P HIGH
1 Valid Cal. Gas 270 SO2 10/19/23 Low CC435440 03/25/24 P1 PPM 12.54 12.51 26.00% P LOW
1 Valid Cal. Gas 270 SO2 10/19/23 Mid DT0036279 01/28/25 P1 PPM 26.71 26.8 35.00% P LOW
1 Valid Cal. Gas 270 SO2 10/19/23 High DT0013190 10/29/24 P1 PPM 40.55 40.2 86.00% P LOW
1 Valid Cal. Gas 270 SO2 10/19/23 Low CC506716 01/31/26 P1 PPM 277.67 278 12.00% P HIGH
1 Valid Cal. Gas 270 SO2 10/19/23 Mid EB0058216 07/17/27 P1 PPM 555.59 551 83.00% P HIGH
1 Valid Cal. Gas 270 SO2 10/19/23 High DT0008522 04/22/29 P1 PPM 881.88 883 13.00% P HIGH
1 Valid Cal. Gas 270 CO2 10/19/23 Low CC435440 03/25/24 P1 PERCENT 4.85 4.87 38% P LOW
1 Valid Cal. Gas 270 CO2 10/19/23 Mid DT0036279 01/28/25 P1 PERCENT 11.03 11.06 29% P LOW
1 Valid Cal. Gas 270 CO2 10/19/23 High DT0013190 10/29/24 P1 PERCENT 18.81 18.84 16% P LOW
1 Valid Cal. Gas 270 NOx 10/19/23 Low CC435440 03/25/24 P1 PPM 123.94 124.5 45.00% P LOW
1 Valid Cal. Gas 270 NOx 10/19/23 Mid DT0036279 01/28/25 P1 PPM 278.61 279 14.00% P LOW
1 Valid Cal. Gas 270 NOx 10/19/23 Low CC506716 01/31/26 P1 PPM 279.52 280 17.00% P HIGH
1 Valid Cal. Gas 270 NOx 10/19/23 High DT0013190 10/29/24 P1 PPM 447.83 446 41.00% P LOW
1 Valid Cal. Gas 270 NOx 10/19/23 Mid EB0058216 07/17/27 P1 PPM 544.29 559 263.00% P HIGH
1 Valid Cal. Gas 270 NOx 10/19/23 High DT0008522 04/22/29 P1 PPM 876.37 892 175.00% P HIGH
1 Valid Cal. Gas 270 SO2 10/19/23 Low CC435440 03/25/24 P1 PPM 12.57 12.51 51.00% P LOW
1 Valid Cal. Gas 270 SO2 10/19/23 Mid DT0036279 01/28/25 P1 PPM 26.79 26.8 5.00% P LOW
1 Valid Cal. Gas 270 SO2 10/19/23 High DT0013190 10/29/24 P1 PPM 40.35 40.2 38.00% P LOW
1 Valid Cal. Gas 270 SO2 10/19/23 Low CC506716 01/31/26 P1 PPM 278.64 278 23.00% P HIGH
1 Valid Cal. Gas 270 SO2 10/19/23 Mid EB0058216 07/17/27 P1 PPM 547.27 551 68.00% P HIGH
1 Valid Cal. Gas 270 SO2 10/19/23 High DT0008522 04/22/29 P1 PPM 878.94 883 46.00% P HIGH
1 270 0 01/00/00 0 0 01/00/00 0 0 0 0 0.00% 0 0
1
Type Code 210
(Pollutant Concentration
Exceeded Span of CEM)
Type Code Channel Start Date Start Time End Date End Time Hours
1 0 0 0 1/0/00 0:00 1/0/00 0:00
1
1 None Reported
1 0 TC 220 Hours 25.90 TC 220 Hours 0.00 TC 230 Hours 0.00 Events 0.00 Hours 0.00 Events 0.00 0.00
1 25.90 TC 300 Hours 0.00 TRUE
None Reported None Reported Yes None Reported None Reported None Reported
Unit 1
Unit 1
Unit 1
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
0
Point Source
Point Source
Point Source
Yes
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 2
Unit 2
Unit 2
Unit 1
Unit 1
Type Code 550
(Changes in Operation in
Control Equipment When
CEM Data Not Available)
Type Code 500
(Boiler Operating Days
w/o 18 Hours of Data)
Type Code 450
(Data Excluded)
Type Code 210
(Pollutant Concentration
Exceeded Span of CEM)
Type Code 220
(Monitor Outage
During Point Source Operation)
Type Code 230
(Manual Sample - Alternate
Sampling During Monitor
Outage)
Type Code 240
(CEM Modifications)
Type Code 530
(Excess Emissions During
Emergency Conditions)
Unit 2
0
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
Unit 2
Unit 1
Unit 1
Unit 2
Unit 2
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 2
Unit 2
Unit 2
Unit 1
Unit 2
Unit 2
Unit 2
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 1
Unit 2
Unit 2
Unit 1
Unit 1
0
IPP EER 4Q2023
Relative Accuracy Overview
Point Source Channel
Date of Most
Current
RATA
Date of
Preceding
RATA
Months Between
RATA's
Units
Measured CEM Value Reference Method
Value
Relative
Accuracy Pass/ Fail 2023
Unit 1 SO2 07/12/23 07/25/22 12 lbs/mmbtu 0.0934 0.96 3.90% Pass
Unit 1 CO2 07/12/23 07/25/22 12 CO2 12.554 12.37 2.74% Pass
Unit 1 SO2 07/10/23 07/21/22 12 lbs/mmbtu 0.041 0.04 6.88% Pass
Unit 1 NOx 07/10/23 07/21/22 12 lbs/mmbtu 0.327 0.32 3.96% Pass
Unit 1 CO2 07/10/23 07/21/22 12 CO2 11.778 11.62 2.78% Pass
Unit 2 SO2 07/13/23 07/26/22 12 lbs/mmbtu 1.054 1.10 4.46% Pass
Unit 2 CO2 07/13/23 07/26/22 12 CO2 11.171 10.92 2.82% Pass
Unit 2 SO2 07/11/23 07/22/22 12 lbs/mmbtu 0.056 0.06 8.74% Pass
Unit 2 NOx 07/11/23 07/22/22 12 lbs/mmbtu 0.285 0.28 4.76% Pass
Unit 2 CO2 07/11/23 07/22/22 12 CO2 11.433 11.33 2.54% Pass
*
NSPS CGA Fourth 2023
Audit Gas Ranges Audit Gas Ranges
AP1 Low AP2 Low AP1 High AP2 High
Unit 1 CO2 10/19/23 20 4.87 5 to 8
Unit 1 CO2 10/19/23 20 11.06 10 to 14
Unit 1 CO2 10/19/23 20 5.09 5 to 8
Unit 1 CO2 10/19/23 20 11.06 10 to 14
Unit 1 SO2 10/19/23 500 121.3 100 to 150
Unit 1 SO2 10/19/23 1000 278 200 to 300
Unit 1 SO2 10/19/23 1000 278 200 to 300
Unit 1 SO2 10/19/23 1000 551 500 to 600
Unit 1 NOx 10/19/23 500 124.5 100 to 150
Unit 1 NOx 10/19/23 500 279 250 to 300
Unit 1 NOx 10/19/23 1000 280 200 to 300
Unit 1 NOx 10/19/23 1000 559 500 to 600
Unit 1 SO2 10/19/23 500 12.51 100 to 150
Unit 1 SO2 10/19/23 500 26.8 250 to 300
Unit 1 SO2 10/19/23 1000 278 200 to 300
Unit 1 SO2 10/19/23 1000 551 500 to 600
Unit 2 CO2 10/19/23 20 4.87 5 to 8
Unit 2 CO2 10/19/23 20 11.06 10 to 14
Unit 2 CO2 10/19/23 20 5.09 5 to 8
Unit 2 CO2 10/19/23 20 11.06 10 to 14
Unit 2 SO2 10/19/23 500 121.3 100 to 150
Unit 2 SO2 10/19/23 1000 278 200 to 300
Unit 2 SO2 10/19/23 1000 278 200 to 300
Unit 2 SO2 10/19/23 1000 551 500 to 600
Unit 2 NOx 10/19/23 500 124.5 100 to 150
Unit 2 NOx 10/19/23 500 279 250 to 300
Unit 2 NOx 10/19/23 1000 280 200 to 300
Unit 2 NOx 10/19/23 1000 559 500 to 600
Unit 2 SO2 10/19/23 500 12.51 100 to 150
Unit 2 SO2 10/19/23 500 26.8 250 to 300
Unit 2 SO2 10/19/23 1000 278 200 to 300
Unit 2 SO2 10/19/23 1000 551 500 to 600
*
Acid Rain Audit Linearity Fourth 2023
Low Span Gas Ranges High Span Gas Ranges
Low Mid High Low Mid High
Unit 1 CO2 10/19/23 20 4.87 4 to 6
Unit 1 CO2 10/19/23 20 11.06 10 to 12
Unit 1 CO2 10/19/23 20 18.84 16 to 20
Unit 1 NOx 10/19/23 500 124.5 100 to 150
Unit 1 NOx 10/19/23 500 279 250 to 300
Unit 1 NOx 10/19/23 1000 280 200 to 300
Unit 1 NOx 10/19/23 500 446 400 to 500
Unit 1 NOx 10/19/23 1000 559 500 to 600
Unit 1 NOx 10/19/23 1000 892 800 to 1000
Unit 1 SO2 10/19/23 500 12.51 100 to 150
Unit 1 SO2 10/19/23 500 26.8 250 to 300
Unit 1 SO2 10/19/23 1000 40.2 800 to 1000
Unit 1 SO2 10/19/23 1000 278 200 to 300
Unit 1 SO2 10/19/23 1000 551 500 to 600
Unit 1 SO2 10/19/23 1000 883 800 to 1000
Unit 2 CO2 10/19/23 20 4.87 4 to 6
Unit 2 CO2 10/19/23 20 11.06 10 to 12
Unit 2 CO2 10/19/23 20 18.84 16 to 20
Unit 2 NOx 10/19/23 500 124.5 100 to 150
Unit 2 NOx 10/19/23 500 279 250 to 300
Unit 2 NOx 10/19/23 1000 280 200 to 300
Unit 2 NOx 10/19/23 500 446 400 to 500
Unit 2 NOx 10/19/23 1000 559 500 to 600
Unit 2 NOx 10/19/23 1000 892 800 to 1000
Unit 2 SO2 10/19/23 500 12.51 100 to 150
Unit 2 SO2 10/19/23 500 26.8 250 to 300
Unit 2 SO2 10/19/23 500 40.2 400 to 500
Unit 2 SO2 10/19/23 1000 278 200 to 300
Unit 2 SO2 10/19/23 1000 551 500 to 600
Unit 2 SO2 10/19/23 1000 883 800 to 1000
*
Audit Gas Used
Point Source Channel Audit Date Low Span
Point Source Channel Audit Date Low Span
Audit Gas Used High Span Audit Gas Used
High SpanAudit Gas Used
IPP EER 4Q2023
Type Code 280 (COMS Attenuator Filters) Procedure 3
Point Source Location
Attenuator
I.D.
Attenuator
Certification Date
Certified Attenuator
Opacity
OPLR,
SECR, or
PLCF,
Corrected Opacity
Value
Range
Low, Mid, & High
Certification
1-year or 5-year
Unit 1 Scrubber
Duct S10404 12/23/22 27 0.56 16.04
Low 1
Unit 1 Scrubber
Duct S10348 12/23/22 37 0.56 22.93
Mid 1
Unit 1 Scrubber
Duct S10246 12/23/22 58 0.56 38.36
High 1
Unit 2 Scrubber
Duct S10405 12/23/22 26.71 0.56 15.97
Low 1
Unit 2 Scrubber
Duct S10349 12/23/22 37.44 0.56 23.1
Mid 1
Unit 2 Scrubber
Duct S10425 12/23/22 58.58 0.56 38.96
High 1
*
Opacity Monitor Response (Average of 5)
Low Range Mid Range High Range
Unit 1 Scrubber
Duct 10/18/23 16 0.350 0.019 0.008 0.362
Unit 1 Scrubber
Duct 10/18/23 23 0.260 0.015 0.007 0.268
Unit 1 Scrubber
Duct 10/18/23 38 0.540 0.050 0.022 0.560
Unit 2 Scrubber
Duct 10/20/23 16 -0.300 0.009 0.004 0.002
Unit 2 Scrubber
Duct 10/20/23 23 -0.290 0.063 0.028 -0.027
Unit 2 Scrubber
Duct 10/20/23 39 0.020 0.046 0.020 0.279
*
Point Source Location Audit Date
Alternitive Zero
Alignment
(Yes or No)
COM Clear
Condition Zero
Response
(CCZR)
COM Simulated
Zero Response
(CSZR)
Zero Alignment
Error Difference
(CCZR)-(CSZR)
Adjustment to COM
Simulated Zero
Response
(CSZR)
(Yes or No)
Unit 1 Scrubber
Duct 10/11/22 No 0.000 0.000 0.000 Yes
Unit 2 Scrubber
Duct 10/11/22 No 0.002 0.002 0.000 Yes
Type Code 282 (Procedure 3 - Annual Zero Alignment Audit)
Point
Source Location Audit Date Mean Difference Standard Deviation
Confidence
Coefficient
Calibration
Error (≤ 3%)
Type Code 281 (Procedure 3 - COMS Filter Audit Calibration Error)
IPP EER 4Q2023
Monitoring Information TC 210, 230, & 240
Type Code 210
(Pollutant Concentration Exceeded Span of CEM) - 500 (All)
*
Sum of Hours Column Labels
Row Labels (blank) Grand Total
(blank)0 0
Grand Total 0 0
*
Type Code 230
(Manual Sample - Alternate Sampling During Monitor Outage) - 500 (All)
*
Sum of Hours Column Labels
Row Labels (blank) Grand Total
(blank)0 0
Grand Total 0 0
*
Type Code 240
(CEM Modifications) - 100 (All)
*
Count of Channel Column Labels
Row Labels (blank) Grand Total
(blank)
(blank)
Grand Total
IPP EER 4Q2023
Type Code 220
(Monitor Outage During Point Source Operation) - 600 (All)
*
Sum of Hours Column Labels
Row Labels 724 723 Grand Total
Unit 1
SO2
U1 Stack CEM zero air switch in wrong position after Linearity causing a
failed calibration, corrected and system calibrated.1.00 1.00
NOx
U1 Stack CEM zero air switch in wrong position after Linearity causing a
failed calibration, corrected and system calibrated.1.00 1.00
CO2
U1 Stack CEM zero air switch in wrong position after Linearity causing a
failed calibration, corrected and system calibrated.1.00 1.00
Opacity
Daily Opacity Calibration Check.9.20 9.20
Opacity Monitor Quarterly Procedure 3 Audit.3.70 3.70
System calibration.0.10 0.10
Unit 2
SO2
System calibration.1.00 1.00
NOx
System calibration.1.00 1.00
CO2
System calibration.1.00 1.00
Opacity
Daily Opacity Calibration Check.3.20 3.20
Opacity Monitor Quarterly Procedure 3 Audit.3.60 3.60
System calibration.0.10 0.10
Grand Total 3.00 22.90 25.90
IPP EER 4Q2023
Opy *
Opy Count of Magnitude of Emissions Column Labels
Opy Row Labels Grand Total
Opy Grand Total
SO2 *
SO2 Type Code 410 (SO2) - 6000 (All)
SO2 *
SO2 Count of Magnitude of Emissions Column Labels
SO2 Row Labels Grand Total
SO2 Grand Total
NOx *
NOx Type Code 420 (NOx) - 6000 (All)
NOx *
NOx Count of Magnitude of Emissions Column Labels
NOx Row Labels Grand Total
NOx Grand Total
NOx d *
NOx d Type Code 421 (Daily NOx Emissions) - 500 (All)
NOx d *
NOx d Count of Reason Code Column Labels
NOx d Row Labels Grand Total
NOx d Grand Total
CO *
CO Type Code 440
(CO) - 6000 (All)
CO *
CO Count of Magnitude of Emissions Column Labels
CO Row Labels Grand Total
CO Grand Total
Dat Ex *
Dat Ex Type Code 450
(Data Excluded) - 6000 (All)
Dat Ex *
Dat Ex Count of Channel Column Labels
Dat Ex Row Labels 724 Grand Total
Dat Ex Unit 2
Dat Ex InletSO2 1 1
Dat Ex
Emissions data excluded from the calculation of averaged
emissions due to a NBOD. Unit 2 offline from November 1 2023 to
March 15 2024 for coal conservation. Unit 1 offline April 1 to July 1
for coal conservation.
1 1
Dat Ex InletCO2 1 1
Dat Ex
Emissions data excluded from the calculation of averaged
emissions due to a NBOD. Unit 2 offline from November 1 2023 to
March 15 2024 for coal conservation. Unit 1 offline April 1 to July 1
for coal conservation.
1 1
Dat Ex SO2 1 1
Dat Ex
Emissions data excluded from the calculation of averaged
emissions due to a NBOD. Unit 2 offline from November 1 2023 to
March 15 2024 for coal conservation. Unit 1 offline April 1 to July 1
for coal conservation.
1 1
Dat Ex NOx 1 1
Dat Ex
Emissions data excluded from the calculation of averaged
emissions due to a NBOD. Unit 2 offline from November 1 2023 to
March 15 2024 for coal conservation. Unit 1 offline April 1 to July 1
for coal conservation.
1 1
Dat Ex CO2 1 1
Dat Ex
Emissions data excluded from the calculation of averaged
emissions due to a NBOD. Unit 2 offline from November 1 2023 to
March 15 2024 for coal conservation. Unit 1 offline April 1 to July 1
for coal conservation.
1 1
Dat Ex Grand Total 5 5
IPP EER 4Q2023
Type Code 500
Before February 28, 2005 (Boiler Operating Days w/o 18 Hours of
Data) After February 28, 2005 (90% Operating Hours For each 30 BOD)
- 500
(All)
*
Count of Channel Column Labels
Row Labels Grand Total
Grand Total
*
Type Code 510
(F-factor, Equations & Conversion Factors) - 500 (All)
Count of F-factor Column Labels
Row Labels SO2 NOx Grand Total
Unit 1
1800 3 1 4
Unit 2
1800 3 1 4
Grand Total 6 2 8
*
Type Code 520
(Minimum Data Not
Obtained <22/30 BODs) - 500
(All)
Count of Channel Column Labels
Row Labels Grand Total
Grand Total
*
Type Code 530
(Excess Emissions During Emergency Conditions) - 500 (All)
Count of Date Column Labels
Row Labels Grand Total
Grand Total
*
Type Code 540
(Fuel Pre-treatment Credit SO2) - 500 (All)
Count of Date Column Labels
Row Labels Grand Total
Grand Total
*
TypeCode 550
(Changes in Operation in Control Equipment When CEM Data Not
Available) - 500
(All)
Column Labels
Row Labels Grand Total
Grand Total