Loading...
HomeMy WebLinkAboutDAQ-2024-0045601 DAQC-CI114360001-23 Site ID 11436 (B1) MEMORANDUM TO: FILE – WESTROC INCORPORATED – Highland Pit THROUGH: Chad Gilgen, Minor Source Compliance Section Manager FROM: Daniel Riddle, Environmental Scientist DATE: November 20, 2023 SUBJECT: FULL COMPLIANCE EVALUATION, Minor, Utah County INSPECTION DATE: May 10, 2023 SOURCE LOCATION: 4600 West 11200 North Highland City, UT 84060 SOURCE CONTACTS: Lee Ware, Environmental Director 801-831-7402 lee.ware@kilgorecompanies.com OPERATING STATUS: Operating normally at the time of inspection. PROCESS DESCRIPTION: Aggregate Pit: Bank run is hauled or bull dozed to an underground feeder dropped onto a conveyor system which transfers the raw material to the processing plant. The material is dropped into a triple deck screen with material being conveyed to a 1/8" minus and %" aggregate piles and the oversize being fed to a cone crusher. The crushed material is conveyed to a double deck screen where road base or sand is separated and the oversized is routed back to the crusher. Sand is processed through the wash plant consisting of a wet screen, two sand screws, a sand screen and a dewatering bucket screw. Washed sand and V" aggregate are transported to the concrete batch plant via front-end loader. The concrete batch plant has been removed and no longer operates. APPLICABLE REGULATIONS: Approval Order (AO) DAQE-AN114360002-16, dated March 7, 2016. Temporary Relocation Permit DAQC-617-23, dated June 30, 2023. NSPS (Part 60) - OOO : Standards of Performance for Nonmetallic Mineral Processing Plants. 2 SOURCE EVALUATION: Name of Permittee: Permitted Location: Westroc Incorporated - Highland Pit 7057 2100 South 4600 West 11200 North Salt Lake City, UT 84128 Highland City, UT 84060 SIC Code: 1442: (Construction Sand and Gravel) Section I: GENERAL PROVISIONS I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-101] I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-1] I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the director or director's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8] I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-401-4] I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. [R307-107] I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307-150] Status: Out of Compliance. Unpermitted equipment was observed on site. See section II for more information. The equipment appeared to be properly operated and maintained according to manufacturer recommendations. Records are kept as required and were made available after the inspection. No breakdowns have been reported since the previous inspection. An emissions inventory was submitted for 2020 and emissions data are reported below. Section II: SPECIAL PROVISIONS II.A The approved installations shall consist of the following equipment: II.A.1 Highland Aggregate Pit and Concrete Batch Plant II.A.2 One (1) Triple-Deck Wet Screen Size: 6' x 16' Manufacturer: JCI 3 II.A.3 One(1) Twin Sand Screw Size: 44" x 32' Manufacturer: Eagle II.A.4 Two (2) Double Screens Size: 5' x 16' each Manufacturer: JCI II.A.5 One (1) Double-Deck Screen Size: 4' x 10' Manufacturer: Simplicity II.A.6 One (1) Cone Crusher - new equipment One (1) cone crusher Capacity: 300 tph Model Number: MVP-450X Serial Number: TRXRX450EOKFEO762 Manufacture Date: May 2015 II.A.7 Various Conveyors and Stackers II.A.8 One (1) Track-Mounted Jaw Crusher Capacity: 200 tph II.A.9 One (1) Crusher Engine Rating: 300 hp Fuel: Diesel Fuel Emission Standard: Tier IV Transitional (Manufactured after 2011) II.A.10 One (1) Truck-Mix Concrete Batch Plant Capacity: 150 cubic yards Manufacturer: Con-E-Co II.A.11 Three (3) Cement and Supplement Silos Capacity: 3,000 barrels II.A.12 One (1) Water Heater Rating: 7.0 MMBtu/hr Fuel: Propane Manufacturer: Kemco II.A.13 One (1) Diesel Storage Tank Capacity: 12,000 gallons II.A.14 Various Water and Admixture Storage Tanks - listed for informational purposes only - 4 II.A.15 Various Mobile Equipment Includes: Bulldozers, Track Hoes, Back Hoes, Loaders, Water Trucks, Haul Trucks, etc. - listed for informational purposes only - Status: Out of Compliance. A Caterpillar diesel generator rated at 545 kW has been on site since September 2022. The generator is being used to operate an unpermitted Astec jaw crusher that has been on site since April 2022. A Compliance Advisory was issued for this unpermitted equipment on May 31, 2023 (see DAQC-547-23). The company submitted a formal response on June 13, 2023. A Warning letter was issued on June 30, 2023 (see DAQC-660-23). No further action is recommended at this time. The equipment in Condition II.A.5 and Conditions II.A.8 – II.A.12 are no longer on site. II.B Requirements and Limitations II.B.1 The Highland Aggregate Pit shall be subject to the following: II.B.1.a The owner/operator shall notify the director in writing when the new equipment listed in this AO has been installed and is operational. To ensure proper credit when notifying the director, send your correspondence to the director, attn: Compliance Section. If the owner/operator has not notified the director in writing within 18 months from the date of this AO on the status of the construction and/or installation, the director shall require documentation of the continuous construction and/or installation of the operation. If a continuous program of construction and/or installation is not proceeding, the director may revoke the AO. [R307-401-18] Status: In Compliance. According to DAQC-1593-17, the notification of equipment installation was received on November 17, 2017. II.B.1.b Unless otherwise specified in this AO, the owner/operator shall not allow visible emissions from any source on site to exceed 20 percent opacity. [R307-305-3] II.B.1.b.1 Unless otherwise specified in this AO, opacity observations of emissions from stationary sources shall be conducted according to 40 CFR 60, Appendix A, Method 9. [R307-305-3] Status: In Compliance. Emissions observed at the time of inspection were beneath the opacity limit over an average of 6 minutes. Method 9 was utilized to verify opacity limits. See attached VEO form. II.B.2 The Aggregate Processing Equipment shall be subject to the following: II.B.2.a The owner/operator shall not produce more than 1,650,000 tons of aggregate per rolling 12- month period and 600 tons of aggregate per hour. [R307-401-8] II.B.2.a.1 To determine compliance with a rolling 12-month total the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records of production shall be kept for all periods when the plant is in operation. Production shall be determined by scale house records. The records of production shall be kept on a daily basis. [R307-401-8] II.B.2.a.2 The owner/operator shall weigh and account for all aggregate material prior to the aggregate material leaving the site or being used in another process on site. [R307-401-8] Status: In Compliance. For the rolling 12-month period from July 2022 - June 2023, a total of 632,849 tons of aggregate were produced. Tonnage per hour had an average maximum of 485 in December 2022, and it never exceeded 600 tons of aggregate per hour. See the attachment for the monthly averages from each month. 5 II.B.2.b The owner/operator shall not operate the aggregate processing plant and associated equipment more than 4,000 hours per rolling 12-month period and 16 hours per day. [R307-401-8] II.B.2.b.1 To determine compliance with a rolling 12-month total the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Hours of operation shall be determined by supervisor monitoring and maintaining of an operations log. [R307-401-8] Status: In Compliance. For the rolling 12-month period from July 2022 – June 2023, plant equipment was used for 1,755 hours. The only day that the equipment usage exceeded 16 hours was on December 6, 2022, when it ran for 17 hours. However, no aggregate was produced and this was only for maintenance II.B.2.c The owner/operator shall install and operate a feeder and conveyor transfer system in the mining area. The feeder shall be loaded with aggregate material with a bulldozer, and the conveyor transfer system shall transport all aggregate material to be processed, to the aggregate processing plant. [R307-401-8] Status: In Compliance. The feeder and conveyor are operating as required. II.B.2.d The owner/operator shall not allow visible emissions from any crusher on site to exceed 12 percent opacity on site and 10 percent opacity at property boundary. [R307-312] Status: In Compliance. Emissions did not exceed these limits over a six-minute average. See the attached VEO form. II.B.2.e The owner/operator shall not allow visible emissions from any screen on site to exceed 7 percent opacity. [R307-312] Status: In Compliance. Emissions did not exceed these limits over a six-minute average. See the attached VEO form. II.B.2.f The owner/operator shall not allow visible emissions from any conveyor transfer point on site to exceed 7 percent opacity. [R307-312] II.B.2.f.1 Opacity shall be measured from each conveyor transfer point that relies on water carryover at least once per week. Records shall include the date and time of each measurement and the result of each observation. [R307-401-8] Status: In Compliance. Opacity is measured as required from these points. See the attached record. II.B.2.g The owner/operator shall not allow visible emissions from any conveyor drop point to exceed 20 percent opacity on site and 10 percent opacity at property boundary. [R307-309-5] Status: In Compliance. Emissions did not exceed these limits over a six-minute average. See the attached VEO form. II.B.2.h The owner/operator shall install water sprays or chemical dust suppression sprays on crushers, screens, and conveyor transfer points as needed to control fugitive emissions. Sprays shall operate as needed when the temperature is above freezing to maintain the opacity limits listed in this AO. [R307-401-8] Status: In Compliance. Water sprays are installed as required, and they operate as needed. II.B.2.i The moisture content of the aggregate material being processed in the aggregate processing plant shall not be less than 4.0%. [R307-401-8] 6 II.B.2.i.1 The owner/operator shall measure the moisture content of the aggregate material from each crusher and from each screen that does not have water sprays installed at least once per month. Moisture content shall be determined by ASTM Method D2216, D4643, D4959, or approved equivalent. Records shall include the location of each sample, the date and time when each sample was taken, and the moisture content of each sample. [R307-401-8] Status: Compliance Not Determined. The only crusher that is not equipped with a water spray is the initial jaw crusher. The source explained that the material that enters this initial crusher is always moist and does not need any wetting to meet opacity requirements. All other crushers and screens are equipped with water sprays. The source has not been testing the moisture content from material at the initial jaw crusher, but has been doing daily checks of moisture content from other stockpiles. See the attached email correspondence for more information. II.B.2.j The owner/operator shall inspect the upstream water sprays of conveyor transfer points that rely on water carryover to control fugitive emissions at least once per month to check that water is flowing to the spray nozzles. [R307-401-8] II.B.2.j.1 Records shall include the date and time of each inspection, the status of the water sprays, and any corrective action taken. [R307-401-8] Status: In Compliance. Nozzles are inspected monthly as required. See the attached record. II.B.3 The Track-Mounted Jaw Crusher and the Crusher Engine shall be subject to the following: II.B.3.a The Track-Mounted Jaw Crusher shall not produce more than 40,000 tons of aggregate per rolling 12-month period. [R307-401-8] II.B.3.a.1 To determine compliance with a rolling 12-month total the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records of production shall be kept for all periods when the plant is in operation. Production shall be determined by belt scale and/or bucket scale records. The records of production shall be kept on a daily basis. [R307-401-8] Status: In Compliance. For the rolling 12-month period from July 2022 – June 2023, a total of 25,937 tons of aggregate were produced with the Astec CS3055 jaw crusher from Temporary Relocation Permit DAQC-617-23, dated June 30, 2023. II.B.3.b The Crusher Engine shall not consume more than 2,400 gallons of diesel fuel per rolling 12- month period. [R307-401-8] II.B.3.b.1 To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total for each day of the previous month by the twentieth day of each month using data from the previous 12 months. Amount of fuel consumed shall be determined by supervisor monitoring and maintaining of an operations log. Records fuel consumption shall include the amount of fuel used in the engine each day. [R307-401-8] Status: Out of Compliance. For the rolling 12-month period from July 2022 – June 2023, a total of 2,593 gallons of diesel fuel were used to run the CAT 3412 500 kW generator from the Temporary Relocation Permit DAQC-617-23, dated June 30, 2023. A Compliance advisory was issued on November 1, 2023, see DAQC-1196-23. The company submitted a formal response on November 15, 2023. See the attached response and the response from the DAQ in the attachments below. An Early Settlement Agreement will be issued to complete this compliance action. II.B.3.c The owner/operator shall not allow visible emissions from any diesel engine on site to exceed 20 percent opacity. [R307-305-3] Status: Not Applicable. The diesel engine is not on site at this time. 7 II.B.3.d The sulfur content of any diesel fuel burned in any diesel engine on site shall not exceed 15 ppm by weight. [40 CFR 60 Subpart IIII] II.B.3.d.1 The sulfur content shall be determined by ASTM Method D2880-71, D4294-89, or approved equivalent. Certification of diesel fuel shall be either by the owner/operator's own testing or by test reports from the diesel fuel marketer. [R307-203-1] Status: In Compliance. Only ULSD fuel is kept on site. See the attached certification from Parkland. II.B.4 The Concrete Batch Plant shall be subject to the following: II.B.4.a The owner/operator shall not produce more than 210,000 cubic yards of concrete per rolling 12- month period and 150 cubic yards of concrete per hour. [R307-401-8] II.B.4.a.1 To determine compliance with a rolling 12-month total the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records of production shall be kept for all periods when the plant is in operation. Production shall be determined by scale house records or vendor receipts. The records of production shall be kept on a daily basis. [R307-401-8] Status: Not Applicable. The concrete batch plant has been removed from this site. II.B.4.b The owner/operator shall use a baghouse to control emissions from the weigh hopper loading of the concrete batch plant. [R307-401-8] Status: Not Applicable. The concrete batch plant has been removed from this site. II.B.4.c The owner/operator shall install a fabric filter device on all material storage silos associated with the concrete batch plant. Displaced air from the silos shall pass through the fabric filter devices before being vented to the atmosphere. [R307-401-8] Status: Not Applicable. The concrete batch plant has been removed from this site. II.B.4.d The owner/operator shall not allow visible emissions from the concrete batch plant baghouse or fabric filters on site to exceed 7 percent opacity. [R307-312] Status: Not Applicable. The concrete batch plant has been removed from this site. II.B.5 The Water Heater shall be subject to the following: II.B.5.a The owner/operator shall not combust more than 38,210 gallons of propane in the water heater per rolling 12-month period. [R307-401-8] II.B.5.a.1 To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records of propane combustion shall be kept for all periods when the plant is in operation. The amount of propane combusted shall be determined by purchasing receipts. The records of propane combustion shall be kept on a monthly basis. [R307-401-8] Status: Not Applicable. The water heater was associated with the concrete batch plant and is no longer on site. II.B.5.b The owner/operator shall not allow visible emissions from the water heater on site to exceed 10 percent opacity. [R307-401-8] Status: Not Applicable. The water heater was associated with the concrete batch plant and is no longer on site. 8 II.B.6 The Bulldozing Operations on site shall be subject to the following: II.B.6.a All bulldozers on site shall not exceed 4,000 hours of operation combined per rolling 12-month period. [R307-401-8] II.B.6.a.1 To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Hours of operation shall be determined by supervisor monitoring and maintaining of an operations log. The records of operation shall be kept on a daily basis. Records shall include the following: A. The number of hours each bulldozer operated each day B. The total hours of operation for all bulldozers each day C. The rolling 12-month total hours of operation for all bulldozers [R307-401-8] Status: In Compliance. For the rolling 12-month period from July 2022 - June 2023, bulldozers were used for 919 hours. II.B.7 All Haul Roads and Fugitive Dust Sources on site shall be subject to the following: II.B.7.a The owner/operator shall apply chemical dust suppressants on all unpaved haul roads and operational areas and shall use water application on all haul roads to maintain opacity limits listed in this AO. The owner/operator may stop applying water to the haul roads, loader routes, and wheeled-vehicle operational areas when the temperature is below freezing but shall still maintain the opacity limits listed in this AO. [R307-401-8] II.B.7.a.1 Records of chemical application and water application shall be kept for all periods when the plant is in operation. The records shall include the following items: A. Date and time treatments were made B. Number of treatments made and quantity of water applied C. Rainfall amount received, if any D. Records of temperature, if the temperature is below freezing [R307-401-8] Status: In Compliance. Watering is completed as required. Roads appeared to have been recently watered at the time of inspection. See the attached watering records. II.B.7.b The owner/operator shall not allow visible emissions from haul roads and fugitive dust sources to exceed 20% opacity on site and 10% opacity at the property boundary. [R307-309-5] II.B.7.b.1 Visible emission determinations for fugitive dust emissions from haul-road traffic and mobile equipment in operational areas shall use procedures similar to Method 9. The normal requirement for observations to be made at 15-second intervals over a six-minute period, however, shall not apply. Visible emissions shall be measured at the densest point of the plume but at a point not less than 1/2 vehicle length behind the vehicle and not less than 1/2 the height of the vehicle. [R307-309-5] Status: In Compliance. No fugitive dust was observed at the time of inspection. The roads appeared to have recently been watered. See the attached VEO form. 9 II.B.7.c The haul road to the aggregate processing plant shall not exceed 0.59 miles in length (1.18 miles round-trip), and the haul road to the concrete batch plant shall not exceed 0.42 miles in length (0.84 miles round-trip). The vehicle speed along the haul road shall not exceed 12 miles per hour. The vehicle speed on the haul road shall be posted, at a minimum, on site at the beginning of the haul road so that it is clearly visible from the haul road. [R307-401-8] Status: In Compliance. There was a posted speed of 10 miles per hour, and the length of the haul roads do not appear to exceed the length limits. II.B.7.d The owner/operator shall apply water to the storage piles and disturbed or stripped areas on site to maintain the opacity limits listed in this AO. Control of disturbed or stripped areas is required at all times (24 hours per day, every day) for the duration of the project/operation until the area is reclaimed. Records of treatment and/or reclamation shall be kept for all periods when the plant is in operation. [R307-401-8] Status: In Compliance. Storage piles appeared wet during the inspection. Records were viewed at the time of inspection. II.B.7.e The moisture content of the material shall be maintained at a minimum of 4.0% by weight. The moisture content shall be tested if directed by the director using the appropriate American Society of Testing and Methods (ASTM) method. [R307-401-8] Status: In Compliance. Moisture content is sampled by the source on a daily basis. Fine material is all above 4% moisture. This condition only applies to fine material. This material is sampled from the stockpiles and has already been processed. See the attached email correspondence for more information. II.B.7.f The silt content of the haul roads shall not exceed 4.8% by weight. The silt content shall be determined if directed by the director using the appropriate ASTM method. The silt content is defined as all material passing a #200 U.S. Standard Sieve. [R307-401-8] Status: Compliance Not Determined. No silt content test of the haul roads has been requested from the director. II.B.7.g The owner/operator shall comply with all applicable requirements of R307-309 for Fugitive Emission and Fugitive Dust sources on site. [R307-309] Status: In Compliance. No fugitive dust was observed at the time of inspection. The roads appeared to have recently been watered. The source operates a FDCP, which is attached below. See the attached VEO form. Section III: APPLICABLE FEDERAL REQUIREMENTS In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. NSPS (Part 60) -OOO : Standards of Performance for Nonmetallic Mineral Processing Plants Status: In Compliance. According to DAQC-1593-17, the initial observations were received by DAQ on April 27, 2013, and are located in the Source Files. 10 AREA SOURCE RULES EVALUATION: The following Area Source Rules were evaluated during this inspection: Emission Standards: Sulfur Content of Fuels [R307-203] Status: In Compliance. Only ULSD fuel is used. See the attached letter. Nonattainment and Maintenance Areas for PM10: Emission Standards [R307-305] Status: In Compliance. Visible emissions were below 20% over a six-minute average. See the attached VEO form. Nonattainment and Maintenance Areas for PM10:Emissions and Fugitive Emissions and Fugitive Dust [R307-309] Status: In Compliance. No fugitive dust was observed at the time of inspection. The roads appeared to have recently been watered. The source operates a FDCP, which is attached below. See the attached VEO form. EMISSION INVENTORY: Listed before are the Actual Emissions Inventory provided from Westroc Incorporated - Highland Pit. A comparison of the estimated total potential emissions (PTE) on AO: Approval Order (AO) DAQE-AN114360002-16, dated March 7, 2016, is provided. PTE are supplied for supplemental purposes only. Criteria Pollutant PTE tons/yr Actuals tons/yr Carbon Monoxide 0.30 0.11 Nitrogen Oxides 0.98 0.5 Particulate Matter - PM10 28.43 20.06783 Particulate Matter - PM2.5 8.55 7.13252 Sulfur Dioxide 0.05 0.03 Volatile Organic Compounds 0.08 0.04 PREVIOUS ENFORCEMENT ACTIONS: No enforcement actions within the past five years. COMPLIANCE STATUS & RECOMMENDATIONS: In regards to Approval Order (AO) DAQE-AN114360002-16, dated March 7, 2016: Out of compliance at the time of inspection. A Compliance Advisory (CA) was issued on May 31, 2023, to address the unpermitted equipment, see DAQC-547-23. The company submitted a formal response on June 13, 2023. A Warning letter was sent on June 30, 2023, see DAQC-660-23. A second CA was issued due to excess diesel fuel consumption on November 1, 2023, see DAQC-1196-23. The company submitted a formal response on November 15, 2023. An Early Settlement Agreement will be issued to complete this compliance action. 11 HPV STATUS: Not Applicable. RECOMMENDATION FOR NEXT INSPECTION: Inspect again next year to ensure all equipment on site is permitted. Look for a new AO. NSR RECOMMENDATIONS: Much of the equipment on this permit is outdated. Conditions II.B.2.i and II.B.7.e do not seem consistent with other testing and records requirements with this type of source. The new track jaw crusher and its generator will need their own limits calculated on the new AO. ATTACHMENTS: VEO form, email correspondence, response from source to second CA, response from DAQ to second CA email regarding compliance action production records, inspection records, watering records, FDCP, jaw crusher hours, and generator fuel consumption 8/30/23, 9:51 AM State of Utah Mail - Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. https://mail.google.com/mail/u/0/?ik=3e54b7a6bd&view=pt&search=all&permthid=thread-f:1765542985431035168&simpl=msg-f:17655429854310351…1/8 Daniel Riddle <driddle@utah.gov> Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. 12 messages Hannah Todd <Hannah.Todd@kilgorecontracting.com>Wed, May 10, 2023 at 3:09 PM To: "Driddle@utah.gov" <Driddle@utah.gov> Here's a page that Hannah Todd wants you to see Monthly Air Quality Report - Highland Pit summitmat.sharepoint.com Get the SharePoint Mobile App Daniel Riddle <driddle@utah.gov>Tue, Jul 25, 2023 at 11:58 AM To: Lee Ware <lee.ware@kilgorecompanies.com> Lee, These are the records report for the Highland pit that I received when I did the inspection back in May, but I do not appear to have permission to access these records. Could you send them in an alternate format? AO DAQE-AN114360002-16 Condition II.B.2.a - aggregate tonnage (rolling 12-month) Condition II.b.2.b - aggregate pfo dxxinb hours (<16 hrs/day) (rolling 12-month) Condition II.B.2.f.1 weekly opacity measurements on transfer points Condition II.B.2.i - moisture of piles > 4% Condition II.B.2.j - inspection of watersprays once per month Condition II.B.3.a - aggregate tonnage on jaw crusher (rolling 12-month) Condition II. B.3.b - diesel fuel consumption (rolling 12-month) Condition II.b.3.d.1 - record of ULSD purchase Condition II.B.6.a - bulldozer operation hours(rolling 12-month) Condition II.B.7.a.1 - record of water treatment to roads Condition II.B.7.d - record of water to storage piles Thank you, Daniel [Quoted text hidden] Lee Ware <Lee.Ware@kilgorecompanies.com>Wed, Jul 26, 2023 at 9:32 AM To: Daniel Riddle <driddle@utah.gov> Daniel, 8/30/23, 9:51 AM State of Utah Mail - Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. https://mail.google.com/mail/u/0/?ik=3e54b7a6bd&view=pt&search=all&permthid=thread-f:1765542985431035168&simpl=msg-f:17655429854310351…2/8 I’d be happy to send you. I’m currently out of the office on vacation. If I get these to you at the top, will that be alright? Lee Ware Get Outlook for iOS From: Daniel Riddle <driddle@utah.gov> Sent: Tuesday, July 25, 2023 10:58:30 AM To: Lee Ware <Lee.Ware@kilgorecompanies.com> Subject: Fwd: Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. This message originated from outside your organization [Quoted text hidden] Daniel Riddle <driddle@utah.gov>Wed, Jul 26, 2023 at 9:57 AM To: Lee Ware <Lee.Ware@kilgorecompanies.com> Yes, enjoy your vacation. When you're back, please send them over. [Quoted text hidden] 10 attachments AttachedImage 169K AttachedImage 50K AttachedImage 2K AttachedImage 2K 8/30/23, 9:51 AM State of Utah Mail - Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. https://mail.google.com/mail/u/0/?ik=3e54b7a6bd&view=pt&search=all&permthid=thread-f:1765542985431035168&simpl=msg-f:17655429854310351…3/8 AttachedImage 2K AttachedImage 2K AttachedImage 169K AttachedImage 50K AttachedImage 2K AttachedImage 2K Daniel Riddle <driddle@utah.gov>Thu, Aug 10, 2023 at 8:38 AM To: Lee Ware <Lee.Ware@kilgorecompanies.com> Lee - could you send these records if you are back in the office? [Quoted text hidden] Lee Ware <Lee.Ware@kilgorecompanies.com>Wed, Aug 16, 2023 at 9:07 AM To: Daniel Riddle <driddle@utah.gov> Daniel, I’m sorry for the delay. I will send these to you. Thanks for the reminder. 8/30/23, 9:51 AM State of Utah Mail - Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. https://mail.google.com/mail/u/0/?ik=3e54b7a6bd&view=pt&search=all&permthid=thread-f:1765542985431035168&simpl=msg-f:17655429854310351…4/8 Cheers, Lee Ware Environmental Director – West Region M (801) 831-7402 O (801) 250-0132 E lee.ware@kilgorecompanies.com [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] Monthly Air Quality Report - Highland Pit summitmat.sharepoint.com Get the SharePoint Mobile App Lee Ware <Lee.Ware@kilgorecompanies.com>Fri, Aug 18, 2023 at 8:19 AM To: Daniel Riddle <driddle@utah.gov> Daniel, Please see attachment containing requested information and documentation related to our Highland Pit. Please contact me should you have any questions or need any additional information. Thanks! 8/30/23, 9:51 AM State of Utah Mail - Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. https://mail.google.com/mail/u/0/?ik=3e54b7a6bd&view=pt&search=all&permthid=thread-f:1765542985431035168&simpl=msg-f:17655429854310351…5/8 Regards, Lee Ware Environmental Director – West Region M (801) 831-7402 O (801) 250-0132 E lee.ware@kilgorecompanies.com [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] Monthly Air Quality Report - Highland Pit summitmat.sharepoint.com Get the SharePoint Mobile App 06_Highland Pit_DAQ2023_R.pdf 2093K Daniel Riddle <driddle@utah.gov>Mon, Aug 21, 2023 at 10:31 AM To: Lee Ware <Lee.Ware@kilgorecompanies.com> This is perfect thank you! I didn't see explanations of attachments A, B, and C at the end of the document, after the summary, which I'm also looking for. I'm looking for the water pile moisture content, should be at a minimum 4.0% by 8/30/23, 9:51 AM State of Utah Mail - Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. https://mail.google.com/mail/u/0/?ik=3e54b7a6bd&view=pt&search=all&permthid=thread-f:1765542985431035168&simpl=msg-f:17655429854310351…6/8 weight. [Quoted text hidden] Lee Ware <Lee.Ware@kilgorecompanies.com>Mon, Aug 21, 2023 at 4:36 PM To: Daniel Riddle <driddle@utah.gov> Daniel, Please see attachments containing 2month overview of moisture sampling that is conducted by our laboratories on a daily basis. I have Highlighted moisture content for the products that are tested, primarily including ¾” washed rock and sand, all of which are from stockpiles. You will notice that all fine materials (sand) are high in moisture content above 4%. However, large gravel / rock (3/4” +) is low in moisture content, well below 4%, primarily because the material is large, and has porous gaps that drains and allows circulation of air. That said, the product is washed free of fine sediment. All of the sediment is washed and what is our waste material that is considered slime waste and reincorporated back into the pit as a fill material. If per your direction, we are open to taking additional samples of the naturally high moist material from the bank upon entering the first jaw crusher. This is the only equipment that is not incorporated with a spray, but rather a water hose as a fail safe / backup….This is due the naturally inherent high moisture content of the material that we extract. If this would be a better representation of what matches our permit condition, please let me know. Thanks! Cheers, [Quoted text hidden] 2 attachments 516505136_Highland_Hourly_QC_07282023.pdf 152K 516505136_Highland_Hourly_QC_08182023.pdf 147K Daniel Riddle <driddle@utah.gov>Wed, Aug 23, 2023 at 11:11 AM To: Chad Gilgen <cgilgen@utah.gov> Chad, These 2 paragraphs from Lee are in regards to conditions II.B.2.i and II.B.7.e of DAQE-AN11436002-16, respectively. I agree with Lee that these requirements are somewhat confusing, and I have never seen them specified in this way in other gravel mine permits. Based on this email explanation, I addressed them in my memo, which I am attaching below. In my opinion, what they are already doing at this site is compliant with the spirit of these conditions, even if they are not in technical compliance based on the exact wording. Please look through the memo and let me know what you think on these conditions, as well as whether you have any corrections for other portions of the memo before I send anything to Melissa. Thanks, [Quoted text hidden] 4 attachments 516505136_Highland_Hourly_QC_07282023.pdf 152K 516505136_Highland_Hourly_QC_08182023.pdf 147K 8/30/23, 9:51 AM State of Utah Mail - Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. https://mail.google.com/mail/u/0/?ik=3e54b7a6bd&view=pt&search=all&permthid=thread-f:1765542985431035168&simpl=msg-f:17655429854310351…7/8 11436 2023 Memo.rtf 213K 11436 2023 records.pdf 2886K Chad Gilgen <cgilgen@utah.gov>Mon, Aug 28, 2023 at 3:21 PM To: Daniel Riddle <driddle@utah.gov> Hi Daniel, These conditions were pulled forward from the BACT of their 1997 AO which originally stated: Fugitive emissions from aggregate crushing operations can be kept very low if the material being crushed has an adequate moisture content. The Engineering Section has found that maintaining a moisture content of about 4.0% in the fines of the material being processed provides excellent control. The Engineering Section recommends that maintaining a moisture content of 4 0% in the fines of the material being processed be accepted as BACT for controlling fugitive dust at the crushing operations. The Engineering Section also recommends that emissions from the crushing operations be kept below 15% opacity: I'm not sure why the 2016 AO dropped off the part about this applying only to fines. Per the information provided by Kilgore, the fines are above 4.8% moisture content so they are in compliance with the condition. With that being said, your inspection memo indicates the permitted jaw crusher (II.A.8) is no longer on-site. Did you mean to reference the cone crusher (II.A.6)? Otherwise, the only other jaw crusher I am seeing would be the one from their Temporary Relocation (see attached) which states: Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all applicable portable crushers, screens and attached conveyors. Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. This would require them to have water sprays on this jaw crusher. I also reviewed the draft memo and had a few comments. See attached. Thanks and let me know if you have any questions or would like to discuss anything further. Chad Chad Gilgen | Manager | Minor Source Compliance 385-306-6500 (cell) Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 2 attachments C-617-23.pdf 446K 11436 2023 Memo_cg.rtf 215K Daniel Riddle <driddle@utah.gov>Tue, Aug 29, 2023 at 11:41 AM To: Lee Ware <Lee.Ware@kilgorecompanies.com> 8/30/23, 9:51 AM State of Utah Mail - Hannah Todd shared "Monthly Air Quality Report - Highland Pit" with you. https://mail.google.com/mail/u/0/?ik=3e54b7a6bd&view=pt&search=all&permthid=thread-f:1765542985431035168&simpl=msg-f:17655429854310351…8/8 Lee, I talked to my manager about this. For the temporary relocation of the jaw crusher at this site, it should have water sprays. You don't have to be using them, but they are required as part of a temporary relocation permit. As for the moisture content, you are in compliance since the material that is processed is above 4% moisture. Nowadays, new permits are all based almost entirely on opacity, so if you do pursue a new permit, these requirements would probably be dropped. [Quoted text hidden] www.kilgorecompanies.com | o. 801-250-0132 | f. 801-250-0671 | 7057 W. 2100 S. Salt Lake City, UT 84128 | P.O. Box 869 Magna, UT 84044 November 13, 2023 Utah Department of Environmental Quality Division of Air Quality Att: Chad Gilgen 195 N 1950 W Salt Lake City, UT 84116 RE: DAQC-1196-23 (Site ID: 11436 (B1) – Compliance Advisory Response Mr. Gilgen, In response to the Compliance Advisory (DAQC-1196-23), pertaining to the Kilgore Contracting, LLC – Highland Aggregate Pit and Concrete Plant (Site ID 11436), Kilgore Companies acknowledges the exceedance of diesel fuel usage, as per condition II.B.3.b of AO DAQE- AN114360002-16, pending that the interpretation and applicability of that condition is correct. Kilgore aggregate operations brought in additional production equipment, (A separate jaw crusher and generator), by way of a temporary equipment relocation permit (DAQC-617-23). Kilgore’s intention was that the newly added equipment would be tied to the overall production conditions and limitations of the existing AO for the Highland Pit and not the specific conditions related to those of the “Portable Track Crusher and Track Crusher Generator Engine”. Apart from sharing a similar equipment type name, there are vast differences and capabilities between what was temporarily brought on and what is identified within the fixed AO. Simply stated, these are entirely different pieces of equipment. Kilgore Companies is of the opinion that the specific conditions associated with the “Portable Track Crusher and the Track Crusher Generator Engine should not have been tied and or linked to the equipment type that was brought on site by way of the temporary equipment relocation permit and that the interpretation of the temporary permit should be reviewed and revised to reflect the overall conditions of the Highland Pit AO, just as any other piece of additional equipment that could have been implemented and brought on site by way of the temporary equipment relocation process. Kilgore Companies has partnered with Trinity Consultants to complete a Notice of Intent (NOI) Applications Checklist to revise the current Approval Order to include the Jaw Crusher as a fixed piece of new equipment. www.kilgorecompanies.com | o. 801-250-0132 | f. 801-250-0671 | 7057 W. 2100 S. Salt Lake City, UT 84128 | P.O. Box 869 Magna, UT 84044 This application and supporting documentation are scheduled to be electronically submitted to the UDAQ NSR during the 3rd week of November for review and approval. Please let me know should there be any questions or if additional information is needed. Kindest Regards, Lee Ware Kilgore Companies P O Box 869 Magna, UT 84044 lee.ware@kilgorecompanies.com o: 801-250-0132 11/20/23, 2:00 PM State of Utah Mail - Kilgore Companies - Highland Pit - Compliance Advisory Response - (DAQC-1196-23) https://mail.google.com/mail/u/0/?ik=3e54b7a6bd&view=pt&search=all&permmsgid=msg-a:r-4074370558615656600&simpl=msg-a:r-4074370558615…1/1 Daniel Riddle <driddle@utah.gov> Kilgore Companies - Highland Pit - Compliance Advisory Response - (DAQC-1196- 23) Daniel Riddle <driddle@utah.gov>Thu, Nov 16, 2023 at 1:25 PM To: Lee Ware <Lee.Ware@kilgorecompanies.com> Cc: Chad Gilgen <cgilgen@utah.gov>, Bryan Jorgensen <Bryan.Jorgensen@kilgorecompanies.com>, Mike Sosa <Mike.Sosa@kilgorecontracting.com> Lee, Thank you for your timely response to the Compliance Advisory. Your response has been reviewed. I will be drafting an ESA for the fuel exceedance at this time. The temporary relocation permit stated clearly that it would be held to the same fuel consumption limits of the AO. While I acknowledge that the new jaw crusher and generator may not be appropriately suited for those limits as you describe, the time to dispute that requirement would have been before that temporary relocation permit was finalized and issued. Additionally, the temporary relocation permit was only issued in response to the first compliance advisory the DAQ sent this year due to your unpermitted equipment, specifically the jaw crusher and generator in question (DAQC-547-23). To close out that compliance action, the DAQ issued a warning stating any issues of further non- compliance could result in penalties (DAQC-660-23). We appreciate how promptly you have worked with NSR to get a new AO in the works. Hopefully everything will be accounted for and you will be in compliance at the next inspection. Thank you, Daniel [Quoted text hidden] image001.png 5K ICILGC)RE CONTRACTING Monthly Kilgore Companies, LLC DBA Kilgore Contracting Monthly Rolling 12 Rolling 12 Month/ Production Production Production Aggs / Pit Year Aggs / Pit Track Crusher Track Crusher (Tons) (Tons) (Tons) (Tons) May-23 55,869 558,456 0 0 r Mar-23 451,976 0 0 ,1 Jan-23 29,843 391,433 0 0 ,1 Nov-22 52,178 317,481 0 0 t- Sep-22 74,047 201,480 0 0 1, 7 1 I- AO R12 R12 Production 1,650,000 Limits Tons Tons In Compliance? Monthly Moisture Content Inspection Highland Pit Monthly Fuel Rolling 12 Usage Fuel Usage Track Crusher Track Crusher {Gallons) (Gallons) 0 0 0 0 0 0 0 0 0 0 0 0 R12 Gallons 2,400 (For crushed & screened material without spray) See Inspection Attachment B 4600 West 11200 North Highland City, UT 84060 FDCP#l7441 Monthly Rolling 12 Monthly Rolling 12 Process Plant Process Plant Bulldozer Bulldozer & Equip. & Equip. (Hours) (Hours) (Hours) (Hours) () 111 96 808 170.5 1,552 43 655 149.3 1,256 7 16 608 0 1,050 1 103 540 153 959 4 7 133 345 239 619 0 12 8 R12 Hours 4,000 R12 Hours 4,000 Hourly Production Rate / Monthly Avg 328 230 N/A 341 310 600 tph Pro p e r t y of Kil g o r e Co m p a n i e s See Inspection Attachment In compliance with permit limit? Monthly Equipment Water Suppression S See Inspection Attachment In compliance with permit limit? See Inspection Attachment In compliance with permit limit? NOTES * The Track Mounted Jaw Crusher is Non-Operational and Not On Site .... Ne Data to be *The concrete batch plant has been removed and is no longer operational, therefore data pertaining to the water heater/ boiler, and production are not available nor are they being tracked. *Watering Logs are kept and maintained daily on site by electronic reporting form *Attachments A, B, & C are include at the end of the summary page *For questions or additional needs, please contact Lee Ware (801)831-7402 rj Pro p e r t y of Kil g o r e Co m p a n i e s Date 2/21/20 Kilgore Companies 7057 W. 2100 S Magna, UT 84044 Re: Ultra Low Sulfur Diesel Parkland certifies that diesel fuel provided to Kilgore Companies from Parkland and it’s affiliates is Ultra Low Sulfur Diesel 15ppm. The sulfur content does not exceed 15% Regards, Candace McCraine Director- National Accounts Parkland USA Pro p e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Dustbusters Enterprises, Inc. 65 Rail Center/PO Box 15 Evanston WY 82931 307. 789 .3878 Tax ID:83-0286499 Bill To Kilgore Company PO Box869 Magna, UT 84044 a p@ki lgorecompan ies.com Ship To Kilgore Contracting 11200 N 4600 W Highland, Ut Delivered & Applied 07/26/23 Item Description Ki lgore/High!. .. DustGard delivered & applied � Dustbusters ENTERPRISES INC . Invoice P.O. No. Lee Ware Qty 37.0075 Date 8/1/2023 Terms Net 30 Rate 124.07 Invoice# 77055 Due Date 8/31/2023 Amount Reference#l6128/11884/2895647 *Credit card payments will be charged a 4% fee. *Tax exempt customers must submit a current tax exempt certificate. Subtotal Sales Tax {0.0%) Total Payments/Credits Balance Due -- Pro p e r t y of Kil g o r e Co m p a n i e s Customer Bill of Lading Road Solutions LLC 90 East 600 North Rupert, ID 83350 Phone: 208-532-5253 Fax: 208-532-3300 Email: sharee@pmt.org 4�0f·�·e __ Driver Origin Tons · -• Gals. Gross Net Miles Received I By: -�� TRK# TRL# Destination 8/L# 16128 PO# Total Pro p e r t y of Kil g o r e Co m p a n i e s Customer Origin Bill of Lading Road Solutions LLC 90 East 600 North Rupert, ID 83350 Phone: 208-532-5253 Fax: 208-532-3300 ,··. Email: sharee@pmt.org Destination Driver TRK# TRL# .0075 Gals. G r..: Gross Tare Net 1'-. /. 't ,Miles 06 Received By: 8/L#, 11 q f' f. vi..)'·�- Date Ticket# ;'lb 23 2 C'f• PO# Total Pro p e r t y of Kil g o r e Co m p a n i e s STRAIGHT BILL OF LADING. SHORT FORM . Orlglna! Not Negotiable FROM COMPASS MINERALS AMERICA INC, The property described below. in apparent good order. except as noted (contents and conditions of contents of packages unknown), marked. consigned and destined as indicated below, which said carrier (the word carrier being understood throughout this contract as meaning any person or corporation in possession of the property under the contract) agrees to carry to Its usual place of delivery at said destination. If on its route. otherwise, to deliver to another carrier on the route to said destination. It Is mutually agreed, as to each carrier of all or any of said property over all or any portion of said route to destination, and as to each party at any time. Interested In all or any said property that every service to be performed hereunder shall be subject to all the terms and conditions of the Uniform Domestic Straight of Lading set forth (1) in Uniform Freight Classification in effect on the date hereof this is a rail or rail water shipment. or {2) in the applicable motor carrier classification or tariff if this is a motor carrier shipment SOLD TO DUSTBUSTERS 65 RAIL CENTER EVANSTON, WY 82930 ROUTE CUSTOMER PICK-UP AUTHORITY ORIGIN GSL LIQUID MGCL2 PLANT CUSTOMER NUMBER 60955 PRODUCT 613819 DRIVER SIGNATURE: CRAIG HARRIS CUSTOMER P.O NUMBER (purchaseOrderNumber] PRODUCT DESCRIPTION DUSTGARD RECEIVED. Subject to the classifications and lawfully filed tariffs in effect on the date of the issue of the Bill of Lading. Shipper hereby certifies that he JS familiar with all the terms and conditions of the said Bill of Lading set forth in the classification of tariff which governs the transportation of this shipment. and the said terms and conditions are hereby agreed to by the shipper and accepted for himself and his assigns. Order Number SHIP TO DUSTBUSTERS 2895647 VARIOUS TRUCK LOCATIONS EVANSTON, WY 82931 FCCODE COLLECT CONTAINER ID 12 SHIPPED QUANTITY(TN) 37.0075 Shipment Number 23082966 ACTUAL SHIP DATE 2023-07-2613:17:12 SUBJECT TO ALL TERMS, CONDITIONS AND LIMITATIONS INCOPORATED BY REFRENCE AS SHOWN. the shipment moves between two ports by water, the law requires that the bi!! of lading shall state whether it is carrier's or shipper's weight. The description and weight indicated on the bill of lading '" correct Subject to verification by the Governing Weighing & lnsp, Bureau According to Agreement. "Shippers imprint in lieu of stamp. not a part of bill of lading approved by the Interstate Commerce Commission." NET WEIGHT IN LBS. 74015 TIME IN 202.3 07-2612:44:39 TIMEOUT 2023-07-2613:17:09 Product weight does not Include pallet weight FOR CHEMICAL EMERGENCY • SPILL. LEAK, FIRE EXPOSURE OR ACCIDENT CALL. CHEMTREC (DAY OR NIGHT) TOLL FREE 1-800•424·9300 NOTICE TO AGENT/CARRIER The charges payable to the agent/carrier for any and at: shipments hereunder shall be collected directly from consignor/shipper's broker. and agent/carrier shall render Its Invoices accordingly Consignor/shipper shall have no Uabillty to agent/carrier for any of such charges. and agent/carrier waives any and all rights of coffection against consignor/shipper therefor. whether pursuant to Title 49 of the United States Code. other applicable laws or principles of equity Carrier assumes responsibility for the prevention of any contamination after the goods leave shippers possession. Carrier will also comply with any security precautions or procedures specified by shipper. Carrier wiJJ identify shipper for all claims and expenses (lnclud!ng attorney's fees) arising from Carrier's fallure to satlsf.y these requirements. 1-ORIGINAL COPY FREIGHT BILL MUST REFERENCE OUR ORDER NUMBER AND INCLUDE A COPY OF LADING. Pro p e r t y of Kil g o r e Co m p a n i e s Monthly Nozzle/Wet Suppression System InspectionsProp e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Enter the date of inspection. Are all hose lines, misters, nozzles, and associated wet Select system part in need of repair Identify location of spray part (i.e., belt #1, Screen #2, Under Cone Select Corrective Action Needed ( Replace spray nozzle, Enter your name. (e.g., Steve Rogers) 7/7/2023 Yes - (All is Well)D. Erik Fleming 6/19/2023 Yes - (All is Well)D. Erik Fleming 6/2/2023 Yes - (All is Well)D. Erik Fleming 5/8/2023 Yes - (All is Well)D. Erik Fleming 4/5/2023 Yes - (All is Well)D. Erik Fleming 3/6/2023 Yes - (All is Well)D. Erik Fleming 2/9/2023 Yes - (All is Well)D. Erik Fleming 12/28/2022 Yes - (All is Well)D. Erik Fleming 11/28/2022 Yes - (All is Well)D. Erik Fleming 8/24/2022 Yes - (All is Well)D. Erik Fleming 7/8/2022 Yes - (All is Well)D. Erik Fleming Monthly Nozzle Inspections Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Erik Fleming 8/9/2023 Highland Pit All equipment emission No na points Erik Fleming 8/2/2023 Highland Pit All equipment emission points No na Pro p e r t y of Kil g o r e Co m p a n i e s Erik Fleming 7/25/2023 Highland Pit All equipment emission points No na Erik Fleming 7/19/2023 Highland Pit All equipment emission points No na Erik Fleming 7/11/2023 Highland Pit All equipment emission points No na Erik Fleming 7/7/2023 Highland Pit All equipment emission points No na Erik Fleming 6/28/2023 Highland Pit All equipment emission points No na Erik Fleming 5/30/2023 Highland Pit All equipment emission points No na Erik Fleming 5/30/2023 Highland Pit All equipment emission points No na Erik Fleming 5/25/2023 Highland Pit All equipment emission points No na Erik Fleming 5/16/2023 Highland Pit All equipment emission points No na Erik Fleming 5/11/2023 Highland Pit All equipment emission points No na Erik Fleming 5/4/2023 Highland Pit All equipment emission points No na Erik Fleming 4/27/2023 Highland Pit All equipment emission points No na Erik Fleming 4/20/2023 Highland Pit All equipment emission points No na Erik Fleming 4/13/2023 Highland Pit All equipment emission points No na Erik Fleming 4/4/2023 Highland Pit All equipment emission points No na Erik Fleming 3/28/2023 Highland Pit All equipment emission points No na Pro p e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Erik Fleming 3/22/2023 Highland Pit All equipment emission points No na Erik Fleming 3/15/2023 Highland Pit All equipment emission points No na Erik Fleming 3/7/2023 Highland Pit All equipment emission points No na Erik Fleming 2/28/2023 Highland Pit All equipment emission points No na Erik Fleming 2/22/2023 Highland Pit All equipment emission points No na Erik Fleming 2/16/2023 Highland Pit All equipment emission points No na Erik Fleming 1/30/2023 Highland Pit All equipment emission points No Na Erik Fleming 1/25/2023 Highland Pit All equipment emission points No na Erik Fleming 1/19/2023 Highland Pit All equipment emission points No na Erik Fleming 1/10/2023 Highland Pit All equipment emission points No na Erik Fleming 12/21/2022 Highland Pit All equipment emission points No na Erik Fleming 12/13/2022 Highland Pit All equipment emission points No na Erik Fleming 12/8/2022 Highland Pit All equipment emission points No na Erik Fleming 12/1/2022 Highland Pit All equipment emission points No na Erik Fleming 11/22/2022 Highland Pit All equipment emission points No na Erik Fleming 11/16/2022 Highland Pit All equipment emission points No Na Pro p e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Erik Fleming 11/10/2022 Highland Pit All equipment emission points No Na Erik Fleming 11/3/2022 Highland Pit All equipment emission points No Na Erik Fleming 10/27/2022 Highland Pit All equipment emission points No Na Erik Fleming 10/12/2022 Highland Pit All equipment emission points No Na Erik Fleming 10/4/2022 Highland Pit All equipment emission points No Na Erik Fleming 10/4/2022 Highland Pit All equipment emission points No Na Erik Fleming 9/27/2022 Highland Pit All equipment emission points No Na Erik Fleming 9/21/2022 Highland Pit All equipment emission points No Na Erik Fleming 9/14/2022 Highland Pit All equipment emission points No Na Erik Fleming 9/8/2022 Highland Pit All equipment emission points No Na Erik Fleming 8/29/2022 Highland Pit All equipment emission points No Na Erik Fleming 8/24/2022 Highland Pit All equipment emission points No Na Erik Fleming 8/24/2022 Highland Pit All equipment emission points No Na Erik Fleming 8/16/2022 Highland Pit All equipment emission points No Na Erik Fleming 8/11/2022 Highland Pit All equipment emission points No Na Erik Fleming 8/2/2022 Highland Pit All equipment emission points No Na Pro p e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Erik Fleming 7/27/2022 Highland Pit All equipment emission points No Na Erik Fleming 7/19/2022 Highland Pit All equipment emission points No Na Erik Fleming 7/14/2022 Highland Pit All equipment emission points No Na Erik Fleming 7/6/2022 Highland Pit All equipment emission points No Na Erik Fleming 6/28/2022 Highland Pit All equipment emission points No Na Pro p e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Daily Watering LogsPrope r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Enter date of application. Select the type of application. Select No Rainfall or select best description if raining. If ground is t f i Select all areas of this application or simply select "All" for all Enter your name. (e.g., Steve Rogers) 6/30/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/30/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/30/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/29/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/29/2023 Water "No Rainfal " All (Select this option if applying water to all areas); Hannah Todd 6/29/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/29/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/27/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd June Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 6/27/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/27/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/27/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/27/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/27/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/23/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/23/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/23/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/23/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 6/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Tyler James 6/21/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/21/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/21/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/21/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/19/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Andrena Rohrbach 6/19/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/19/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/19/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/19/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 6/15/2023 No application needed.Heavy Rainfall All (Select this option if applying water to all areas); Hannah Todd 6/13/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/13/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/12/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Andrena 6/9/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/9/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/8/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/8/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/8/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/8/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/8/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/7/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/7/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/7/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/7/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/6/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/6/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 6/6/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/6/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/6/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/6/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/5/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/2/2023 Water Light Rainfall All (Select this option if applying water to all areas); Hannah Todd 6/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 6/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Enter date of application. Select the type of application. Select No Rainfall or select best description if raining. If ground is t f i Select all areas of this application or simply select "All" for all Enter your name. (e.g., Steve Rogers) 5/31/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/31/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/31/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/31/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/30/2023 Water "No Rainfal " All (Select this option if applying water to all areas); Hannah Todd 5/30/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/30/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/30/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/30/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/30/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd May Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 5/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/25/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/25/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/25/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/25/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/24/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/24/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/24/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/23/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/23/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/23/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/23/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/23/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/22/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps 5/18/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/18/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/18/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 5/18/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/18/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/17/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/16/2023 Water Light Rainfall All (Select this option if applying water to all areas); Hannah Todd 5/15/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/12/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/12/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/12/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/12/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/11/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/11/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/11/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/11/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/11/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/10/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/10/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/10/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 5/10/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/10/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/9/2023 Water "No Rainfall" All (Select this option if applying water to all areas); gabrielle chesley 5/9/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Matthew Child 5/9/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Matthew Child 5/8/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps 5/8/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps 5/8/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps 5/8/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps 5/5/2023 Water Medium Rainfall All (Select this option if applying water to all areas); Hannah Todd 5/5/2023 Water Light Rainfall All (Select this option if applying water to all areas); Hannah Todd 5/3/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/3/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/3/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/2/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 5/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 5/1/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Tod Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Enter date of application. Select the type of application. Select No Rainfall or select best description if raining. If ground is t f i Select all areas of this application or simply select "All" for all Enter your name. (e.g., Steve Rogers) 4/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/28/2023 Water "No Rainfal " All (Select this option if applying water to all areas); Hannah Todd 4/28/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/27/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps 4/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/26/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/24/2023 Water Heavy Rainfall All (Select this option if applying water to all areas); Hannah Todd April Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 4/21/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/21/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/21/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/20/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/17/2023 Water "No Rainfall" All (Select this option if applying water to all areas);Haul Routes; Hannah Todd 4/17/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/17/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/17/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 4/17/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/17/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/17/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/17/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/14/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/14/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/14/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/12/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/12/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/12/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/11/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/11/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 4/11/2023 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah ToddProp e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s During winter months, typically October through April, wet conditions exist on site. These wet conditions make dust suppression unnecessary during these cold months.Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Enter date of application.Select the type of application. Select "No Rainfall" or select best description if raining. If ground is wet Select all areas of this application or simply select "All" for all areas. Enter your name. (e.g., Steve Rogers) 10/18/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 10/18/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 10/18/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 10/17/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 10/17/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 10/11/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 10/11/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 10/11/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 10/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps 10/4/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps 10/4/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps 10/4/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Audrey Hipps October Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Enter date of application. Select the type of application. Select No Rainfall or select best description if raining. If ground is wet from previous Select all areas of this application or simply select "All" for all areas. Enter your name. (e.g., Steve Rogers) 9/27/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/27/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/27/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/27/2022 Water "No Rainfall" All (Selec this option if applying water to all areas); Hannah Todd 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker September Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Michelle Baker 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 9/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/19/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/19/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/19/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/19/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/19/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/13/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 9/13/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/13/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/13/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/13/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/13/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/13/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/13/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/13/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/12/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 9/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/6/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/2/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/2/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/2/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/2/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/2/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/2/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 9/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah ToddProp e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Enter date of application. Select the type of application. Select No Rainfall or select best description if raining. If ground is wet from previous Select all areas of this application or simply select "All" for all areas. Enter your name. (e.g., Steve Rogers) 8/31/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/31/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/31/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/31/2022 Water "No Rainfall" All (Selec this option if applying water to all areas); Hannah Todd 8/31/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/31/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/30/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/30/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/30/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/30/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/30/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/30/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/30/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/30/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd August Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 8/27/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/27/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/25/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/25/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/25/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/25/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/25/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/25/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/25/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/24/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 8/24/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/24/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/24/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/24/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/23/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/23/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/23/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/23/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/23/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/16/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/16/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 8/16/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/16/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/16/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/12/2022 Water Moist conditions exist. All (Select this option if applying water to all areas); Gabrielle Chesley 8/9/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/8/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/5/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/5/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/5/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/5/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 8/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 8/1/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s Enter date of application. Select the type of application. Select "No Rainfall" or select best description if raining. If ground is wet Select all areas of this application or simply select "All" for all areas. Enter your name. (e.g., Steve Rogers) 7/29/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/29/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/29/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/29/2022 Water "No Rainfall" All (Sele t this option if applying water to all areas); Hannah Todd 7/29/2022 Water "No Rainfal " All (Select this option if applying water to all areas); Hannah Todd 7/29/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/29/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/29/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/28/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/28/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/28/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/28/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/28/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd July Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 7/28/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/28/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/27/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/27/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/27/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Brittney Johnson 7/26/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Brittney Johnson 7/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/22/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/21/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/20/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/18/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/18/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/18/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/16/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/12/2022 Water Light Rainfall All (Select this option if applying water to all areas); Hannah Todd 7/12/2022 Water Light Rainfall All (Select this option if applying water to all areas); Hannah Todd 7/11/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/11/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s 7/11/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/11/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/11/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/11/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd 7/7/2022 Water "No Rainfall" All (Select this option if applying water to all areas); Hannah Todd Prop e r t y o f K i l g o r e C o m p a n i e s Pro p e r t y of Kil g o r e Co m p a n i e s EM Equipment Summary by Job Report All JCCos Jobs: 020702-• 020702- Equipment JC Co 201 Kilgore Companies LLC Job: 020702- 10.027 2012 Cat DST Dozer (DO754) 10.050 1999 CAT DSR Dozer 10.051 2004 CAT DSR Dozer 10.115 2021 Caterpillar DST Dozer 10.122 Caterpillar D10 Rental 10.123 ESR Mammoth Machinery AII SMCos All Work Orders Equipment: 10 -10.999 Months: 07/22 -06/23 Total For Job 020702-: Total For JC Co 201: """GRANO TOTALS*** ""NOTE: This report includes ONLY Job and Service Type transactions 201 Kilgore Companies LLC Date Format -MM/DD/YY Page 1 of 1 Time Units 329.900 160.000 108.000 219.000 42.000 59.000 917.900 917.900 917.900 07/12/23 04 38:32 PM EMEquipSummaryJob.rpt Pro p e r t y of Kil g o r e Co m p a n i e s 195 North 1950 West Salt Lake City, Utah 84114-4820 Attn: DAQ, Fugitive Dust Control Plan Fugitive Dust Control Plan Application Applicants have the option to complete the online dust control plan on the DEQ Online Services webpage or to submit a hard copy application. Activities regulated by R307-309 may not commence before obtaining approval of the fugitive dust control plan. Therefore, online filing is encouraged because it provides instant approval. Blank spaces must be completed for the application to be processed. If not applicable, enter N/A. 1. Applicant Information Name:Kilgore Companies Address:7057 West 2100 South Salt Lake City , UT 84128 Phone:8012500132 Email:lee.ware@kilgorecompanies.com Applicant Type:Property Owner 2. Project Information Project Name:Highland Pit Address:4600 W. 11200 N AMERICAN FORK, UT 84003 County:UTAH Directions:NA Acreage:111.59 Latitude:40.435048 Longitude:-111.766387 3. Point of Contact Name:Lee Ware Company Name:Kilgore Companies, LLC Address:7057 West 2100 South Salt Lake CIty , UT 84128 Phone:8012500132 Fax: Cell:8018317402 4. On-site Superintendent/Supervisor/Foreman Contact Name:Asa Brandis Company Name:Kilgore Companies, LLC dba Kilgore Contracting On-Site Phone:8019038960 Cell: 5. By signing this permit application I certify that: A. I am authorized, on behalf of the individual or company listed in Section 1, as Applicant, to apply for a Fugitive Dust Control Plan and to commit to all of the terms and conditions of the requested plan. B. Construction activities will be limited to lands that the applicant either owns or is authorized to use for construction activities. C. The applicant accepts responsibility for assuring that all contractors, subcontractors, and all other persons on the construction site covered by this plan, comply with the terms and conditions of the Fugitive Dust Control Plan. D. I understand that any false material statement, representation or certification made in this application may invalidate the plan or cause me to be subject to enforcement action pursuant to Utah Code Ann. 19-2-115. E. Failure to comply with fugitive dust rules may result in compliance action and penalties up to $10,000 per violation/day. Date: 08/31/2018 Printed Name: Kilgore Companies Title: Property Owner Company Name: Kilgore Companies, LLC Dust Plan Number: 17441 Dust Suppressants Check All that Apply Clay additives. Calcium chloride. Lime (calcium oxide). Magnesium chloride. Organic non-petroleum products, (ligninsulfonate, tall (pine) oil, and vegetable derivatives). Synthetic polymers (for example; polyvinyl acetate and vinyl acrylic). FUGITIVE DUST CONTROL PLAN PROJECT ACTIVITIES CHECKLIST INSTRUCTIONS: PLACE A CHECK MARK NEXT TO EVERY ACTIVITY THAT WILL BE CONDUCTED ON THIS SITE, FOR EACH CHECKED ACTIVITY, COMPLETE THE CORRESPONDING CONTROL MEASURES/BEST MANAGEMENT PRACTICE (BMP) SELECTION PAGE. WHEN COMPLETED, YOU WILL HAVE THE OPTION TO PRINT THE ENTIRE PLAN. Project Activity Check All that Apply 01 Backfilling area previously excavated or trenched. 02 Blasting soil & rock - drilling and blasting. 03 Clearing for site preparation and vacant land cleanup. 04 Clearing forms, foundations, slab clearing and cleaning of forms, foundations and slabs prior to pouring concrete. 05 Crushing of construction and demolition debris, rock and soil.X 06 Cut and fill soils for site grade preparation. 07 Demolition - Implosive demolition of a structure, using explosives. 08 Demolition - mechanical/manual demolition of walls, stucco, concrete, freestanding structures, buildings and other structures. 09 Disturbed soil throughout project including between structures. THIS ACTIVITY MUST BE SELECTED FOR ALL PROJECTS. X 10 Disturbed land - long term stabilization and erosion control of large tracts of disturbed land that will not have continuing activity for more than 30 days. 11 Hauling materials.X 12 Paving/subgrade preparation for paving streets, parking lots, etc. 13 Sawing/cutting material, concrete, asphalt, block or pipe. 14 Screening of rock, soil or construction debris.X 15 Staging areas, equipment storage, vehicle parking lots, and material storage areas.X 16 Stockpiles materials (storage), other soils, rock or debris, for future use or export.X 17 Tailings piles, ponds and erosion control.X 18 Trackout Prevention and Cleanup of mud, silt and soil tracked out onto paved roads.X 19 Traffic - unpaved routes and parking, construction related traffic on unpaved interior and/or access roads and unpaved employee/worker parking areas. X 20 Trenching with track or wheel mounted excavator, shovel, backhoe or trencher. 21 Truck loading with materials including construction and demolition debris, rock and soil.X Crushing of construction and demolition debris, rock and soil.BMP 05 If you have crushers and screening on site, you may be subject to the federal requirements contained in New Source Performance Standards Subpart OOO. It is advised that you read this subpart to determine if these requirements apply to you. Please note that Subpart OOO is NOT included in this Dust Control Plan submission. The link to Subpart OOO is listed below: http://ecfr.gpoaccess.gov/cgi/t/text/text- idx?c=ecfr&sid=4bb7745b4e567b604ad681bc2a46eec2&rgn=div6&view=text&node=40:6.0.1.1.1. 80&idno=40 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION FROM EACH SECTION. Stabilize surface soils where support equipment and vehicles will operate. X 05-01 Pre-water and maintain surface soils in a stabilized condition. _05-02 Apply and maintain a chemical stabilizer to surface soils. _05-03 Pave operational area(s). Stabilize material before crushing. _05-04 Pre-water material. X 05-05 Test material to determine moisture content and silt loading, crush only material that is at optimum moisture content. Stabilize material during crushing. X 05-06 Apply water to stabilize material so as to maintain compliance with opacity standards and permit conditions. _05-07 Monitor opacity. Make adjustments to maintain compliance with opacity standards and permit conditions. _05-08 Install wind break or use enclosure. Stabilize material after crushing. X 05-09 Water crushed material immediately following crushing. _05-10 Apply and maintain a chemical stabilizer to crushed material. _05-11 Maintain in enclosure. _05-12 Minimize height of stockpile. Traffic. X 05-13 Minimize vehicle miles. _05-14 Reduce truck traffic. X 05-15 Reduce truck speed. Transfer height. X 05-16 Minimize transfer and drop point height. Disturbed soil throughout project including between structures. THIS ACTIVITY MUST BE SELECTED FOR ALL PROJECTS. BMP 09 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION FROM EACH SECTION. Limit disturbance of soils where possible. _09-01 Limit disturbance of soils with the use of fencing, barriers, barricades, and/or wind barriers. X 09-02 Limit vehicle mileage and reduce speed. Stabilize and maintain stability of all disturbed soil throughout construction site. X 09-03 Apply water to stabilize disturbed soils. Soil moisture must be maintained such that soils can be worked without generating fugitive dust. _09-04 Apply and maintain a chemical stabilizer. _09-05 Use wind breaks. _09-06 Apply cover (natural or synthetic). Hauling materials.BMP 11 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION FROM EACH SECTION. Limit visible dust opacity from vehicular operations. X 11-01 Apply and maintain water/chemical suppressant to operational areas and haul routes. X 11-02 Limit vehicle mileage and speed. Stabilize materials during transport on site. X 11-03 Use tarps or other suitable enclosures on haul trucks. _11-04 Apply water prior to transport. Clean wheels and undercarriage of haul trucks prior to leaving construction site. _11-05 Clean wheels. X 11-06 Sweep or water haul road. Screening of rock, soil or construction debris.BMP 14 If you have crushers and screens on site, you may be subject to the federal requirements contained in New Source Performance Standards Subpart OOO. It is advised that you read this subpart to determine if these requirements apply to you. Please note that Subpart OOO is NOT included in this Dust Control Plan submission. The link to Subpart OOO is listed below: http://ecfr.gpoaccess.gov/cgi/t/text/text- idx?c=ecfr&sid=4bb7745b4e567b604ad681bc2a46eec2&rgn=div6&view=text&node=40:6.0.1.1.1. 80&idno=40 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION FROM EACH SECTION. Stabilize surface soils where support equipment and vehicles will operate. X 14-01 Pre-water and maintain surface soils in a stabilized condition. _14-02 Apply and maintain a chemical stabilizer on surface soils. _14-03 Pave operational area(s). Pre-treat material prior to screening. X 14-04 Apply a dust suppressant to material. Stabilize material during screening. X 14-05 Dedicate water source to screening operation and apply water as needed to prevent dust. _14-06 Install wind barrier upwind of screen as high as the drop point. Stabilize material and surrounding area immediately after screening. X 14-07 Apply water to stabilize screened material and surrounding area. _14-08 Apply and maintain a chemical stabilizer to stabilize screened material and surrounding area. _14-09 Minimize storage pile height. Transfer height. X 14-10 Drop material through the screen slowly and minimize drop height. Staging areas, equipment storage, vehicle parking lots, and material storage areas. BMP 15 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION FROM EACH SECTION. Limit visible dust opacity from vehicular operations. X 15-01 Limit vehicle mileage and speed. X 15-02 Apply water on all vehicle traffic areas in the staging areas and unpaved access routes. Stabilize staging area soils during use. X 15-03 Pre-water and maintain surface soils in a stabilized condition. _15-04 Apply and maintain a chemical stabilizer to surface soils. Stabilize staging area soils at project completion. _15-05 Apply a chemical stabilizer. X 15-06 Apply screened or washed aggregate. _15-07 Use wind breaks. _15-08 Pave. _15-09 Completed project will cover staging area with buildings, paving, and/or landscaping. _15-10 Apply water to form adequate crust and prevent access. Stockpiles materials (storage), other soils, rock or debris, for future use or export. BMP 16 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION FROM EACH SECTION. Stabilize surface soils where support equipment and vehicles will operate. X 16-01 Pre-water and maintain surface soils in a stabilized condition. _16-02 Apply and maintain a chemical stabilizer on surface soils. _16-03 Pave area. Stabilize stockpile materials during handling. X 16-04 Remove material from the downwind side of the stockpile, when safe to do so. _16-05 Reduce height. _16-06 Create wind screen Stabilize stockpiles after handling. _16-07 Water stockpiles to form a crust immediately. _16-08 Apply and maintain a chemical stabilizer to all outer surfaces of the stockpiles. _16-09 Provide and maintain wind barriers on 3 sides of the pile. _16-10 Apply a cover (natural or synthetic) _16-11 Wind screen. X 16-12 Avoid steep sides to prevent material sloughing. _16-13 Reduce height. Tailings piles, ponds and erosion control.BMP 17 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION. Stabilize piles and ponds. _17-01 Pre-water and maintain surface soils in a stabilized condition. _17-02 Apply and maintain a chemical stabilizer on surface soils _17-03 Install cover (natural or synthetic). _17-04 Apply wind break. _17-05 Avoid steep sides of faces _17-06 Minimizing the area of disturbed tailings. X 17-07 Restricting the speed of vehicles in and around the tailings operation. Trackout Prevention and Cleanup of mud, silt and soil tracked out onto paved roads. BMP 18 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION FROM EACH SECTION. Prevent dust from trackout. X 18-01 Clean trackout at the end of the work shift from paved surfaces to maintain dust control _18-02 Maintain dust control during working hours and clean trackout from paved surfaces at the end of the work shift/day. _18-03 Install gravel pad(s), clean, well-graded gravel or crushed rock. Minimum dimensions must be 30 feet wide by 3 inches deep, and, at minimum, 50' or the length of the longest haul truck, whichever is greater. Re-screen, wash or apply additional rock in gravel pad to maintain effectiveness. _18-04 Install wheel shakers. Clean wheel shakers on a regular basis to maintain effectiveness. _18-05 Install wheel washers. Maintain wheel washers on a regular basis to maintain effectiveness. _18-06 Motorized vehicles will only operate on paved surfaces. _18-07 Install cattle guard before paved road entrance. All exiting traffic must be routed over selected trackout control device(s). X 18-08 Clearly establish and enforce traffic patterns to route traffic over selected trackout control device(s). _18-09 Limit site accessibility to routes with trackout control devices in place by installing effective barriers on unprotected routes. Traffic - unpaved routes and parking, construction related traffic on unpaved interior and/or access roads and unpaved employee/worker parking areas. BMP 19 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION. Stabilize surface soils where support equipment and vehicles will operate. X 19-01 Limit vehicle mileage and speeds. X 19-02 Apply and maintain water on surface soils. _19-03 Apply and maintain chemical stabilizers on surface soils. _19-04 Apply and maintain gravel on surface soils. X 19-05 Supplement chemical stabilizers, water or aggregate applications as necessary. X 19-06 Apply recycled asphalt (RAP) to surface soils. Truck loading with materials including construction and demolition debris, rock and soil. BMP 21 GENERAL REQUIREMENT: ALL ACTIVITIES MUST MEET OPACITY REQUIREMENTS IN R307-309-5 MAKE AT LEAST ONE SELECTION. _21-01 Pre-water and maintain surface soils in a stabilized condition where loaders, support equipment and vehicles will operate. _21-02 Apply and maintain a chemical stabilizer on surface soils where loaders, support equipment and vehicles will operate. X 21-03 Empty loader bucket slowly and keep loader bucket close to the truck to minimize the drop height while dumping. Jun-23 202 1,886 8,352 25,937 835 2,593 May-23 179 1,684 10,674 17,585 1,067 1,758 Apr-23 142 1,505 6,911 6,911 691 691 Mar-23 157 1,363 0 0 0 0 Feb-23 63 1,206 0 0 0 0 Jan-23 0 1,143 0 0 0 0 Dec-22 126 1,143 0 0 0 0 Nov-22 168 1,017 0 0 0 0 Oct-22 228 849 0 0 0 0 Sep-22 210 621 0 0 0 0 Aug-22 196 411 0 0 0 0 Jul-22 215 215 0 0 0 0 Condition II.B.3.a states: "The Track-Mounted Jaw Crusher shall not produce more than 40,000 tons of aggregate per rolling 12-month period."I know that the permitted rolling track jaw crusher is not in use at this site, so you reported 0 hours of use for the track crusher. However, we still need the hours of use for the temporary jaw crusher in use under the temporary relocation permit. Please provide those for the Astec CS3055 jaw crusher for the period from July 2022 - June 2023. NOTE: Crusher was implemented in Middle / End of March, with operations begining in April of 2023 - See Production for requested time period.Condition II.B.3.b states: "The Crusher Engine shall not consume more than 2,400 gallons of diesel fuel per rolling 12-month period."Similar to the above request, please provide the fuel usage for the CAT 3412 500 kW generator listed on your temporary relocation permit from July 2022 - June 2023. NOTE: Generator was implemented in Middle / End of March, with operations begining in April of 2023 - See fuel usage for requested time period. Condition II.B.2.b of your AO states: "The owner/operator shall not operate the aggregate processing plant and associated equipment more than 4,000 hours per rolling 12-month period and 16 hours per day." NOTE: All days, with the exception of 12/06/2022, operted less than 16 hours/ day. On 12/06/2022, equipment was ran for 17 hours for the day, however there was no production during this day. The running of equipment was for maintenance only. 4600 West 11200 North Highland City, UT 84060 Monthly Operational Hours Rolling 12 Operational Hours 40,000R12 Tons Monthly Jaw Crusher Production (Tons) Rolling 12 Jaw Crusher Production (Tons) R12 Fuel Gallons 2,400 AO Production Limits R12 Hours 4,000 Monthly Jaw Crusher Generator Fuel Usage Rolling 12 Jaw Crusher Generator Fuel Usage Kilgore Companies, LLC DBA Kilgore Contracting AO# DAQE-AN114360002-16 FDCP#17441 Month / Year