From: Dale Urban <durban@utah.gov>
Date Mon, Sep 11, 2023 at 1 10 PM
Subject: Re: 21st & 21st project update request To:
Turner, Andrew S <Andrew.Turner@terracon.com>
Cc: Bowers, Benjamin <Ben.Bowers@terracon.com >, Paige Walton <Qwalton@utah.gov>
Thanks for the update Andrew This site is one of those that are dependent on ever changing construction designs &
schedules so I understand the " .... hurry up and wait" approach that Terracon has to contend with.
Based on your email, I hope to see the Corrective Action Completion report by the end of this month.
Thanks & good luck w/ the project.
https://mail.google.com/mail/u/0/#inbox/FMfcgzGtwzrhTRCqkMGwtzvGWHCXMpsq 1/1
DSHW-2023-209108
9/11/23, 4:06 PM Fwd: 21st & 21st project update request
From: Turner, Andrew S<Andrew.Turner@terracon.com> Date: Mon, Sep 11, 2023
>
>
Subject RE 21 st & 21 st project update request To: Dale
Urban <durban@utah.gov> Cc: Bowers, Benjamin B
Ben.Bowers@terracon.com
Dale,
The site is still in a fluctuating construction phase that only requires Terracon's attention at brief irregular periods. However, I
should be updating you more regularly. If I give you a monthly update going forward (assuming no deliverables are being
submitted), would that be acceptable to you? Thanks.
Please see below:
1.This should be into internal review shortly. I know the main body of the report, VIMS report, tables, and exhibits have
been completed The main issue causing the delay has to do with all of the changes and construction delays at the
site. We are still being called about VIMS observations and adjustments which we will want to include in the
completion report. I will follow up with the team this week to get a more detailed answer regarding timeframe, but our
goal is to get it out shortly.
2.No drilling date is set as construction at the site has been delayed. Locations have been chosen (and approved), and
the drillers are aware of the work However, we need to wait until the areas are at least paved and the main
construction equipment is off-site to be able to properly install the wells. I asked the owners about this last week and
was not given a definitive answer. My guess it that is will be late Oct/early Nov.
3.There had been initial discussions about regular groundwater sampling and reporting. However, I believe it was
decided that regular groundwater sampling (8 periods) would only be conducted once the three off-site wells were
redrilled and the two additional on site well were completed Right now, only one of the three off site well contain
a very small amount of water. The others are dry.
4.Draft SMP will be done after the CAP Completion Report once the new wells have been installed and construction is
basically complete.
Please let me know if you have any questions or concerns. Thank you.
Andrew S. Turner, PG
Project Manager -Environmental Services
6949 S. High Tech Dr. I Midvale, UT 84047
D (385) 388-7028 I F (801) 746-3596 I
Andrew.Turner@terracon.com I Terracon.com
From Dale Urban durban@utah gov Sent: Monday, September 11, 2023 11 :03 AM
https://mail.google.com/mail/u/0/#inbox/FMfcgzGtwzrhTRCqkMGwtzvGWHCXMpsq 1/2
9/11/23, 406 PM Fwd 21st & 21st project update request
> To: Turner, Andrew S <Andrew.Turner@terracon.com>
Cc: Bowers, Benjamin <ben.bowers@terracon.com>
Subject 21st & 21st project
Hi Andrew;
It has been a long time (May 24th) since I have heard from you, so I am requesting a status report for this project
Please provide me w/ an update on the project at your earliest convenience.
Specifically, I am interested in the timeline of deliverable submittals for the following documents:
1 ) Draft Corrective Action Completion Report
2) Drilling date for installation of new groundwater water monitoring wells
3) Groundwater monitoring report(s) (the DERR needs to be cc'd on these reports)
4)Draft Site Management Plan
5) Other reports or work plans??
Thanks for your help.
WASTE MANAGEMENT
& RADIATION CONTROL
Dale T. Urban, P.G. Environmental Scienti t I Corrective Action Section Division of Waste Management and Radiation Control
Office: (385) 499-1103 I Front Desk: (801) 536-0200 wa teandradiation.utah.gov
Email to and from this email address may be considered public record and thu subject to Utah GRAMA requirements.
Statements made in this email do not constitute the official position of the Director of the Division ofWasteManagement and Radiation Control If you desire a statement of the Division Director's position, please submit a written request to the Director, including copies of documents relevant to your request
https://mail.google.com/mail/u/0/#inbox/FMfcgzGtwzrhTRCqkMGwtzvGWHCXMpsq 2/2