Loading...
HomeMy WebLinkAboutDRC-2024-004554February 13, 2024 Vern C. Rogers, Director of Regulatory Affairs EnergySolutions, LLC 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 RE:2024 Engineering Module 12 – Annual As-Built Plan Check Review for Permit UGW# 450005: As-Built Approval. Dear Mr. Rogers: The Utah Division of Waste Management and Radiation Control (WMRC) has completed its review of 2023 Annual As-Built Report, dated December 27, 2023. The As-Built review is part of the 2024 Engineering Module 12 – Annual As-Built Plan. After review of the 2023 As-Built Report, the WMRC staff has determined that the annual As-Built drawings are acceptable, and the report is hereby approved. The Annual As built is a snapshot of how the facility looks like on November 27, 2023, by aerial survey. The report shows permitted embankment capacity, waste volumes, and remaining airspace less surety & overbuild volumes, grades, contours, survey monuments, and many other site structures. If you have any questions, please call David Esser at (801) 536-0079. Sincerely, Douglas J. Hansen, Director Division of Waste Management and Radiation Control DJH/DKE Enclosure: c: Jeff Coombs, EHS, Health Officer, Tooele County Health Department Bryan Slade, Environmental Health Director, Tooele County Health Department EnergySolutions General Correspondence Email LLRW General Correspondence