HomeMy WebLinkAboutDDW-2024-007578 May 9th, 2024
Levi Jones
Moab City
217 East Center St
Moab, Utah 84532
Dear Levi Jones:
Subject: Public Drinking Water Requirements for Moab City , UTAH10003
According to the Division of Drinking Water ’s records,Moab City is a Community water system
that now serves a population of about 9,000 people.
This population change results in the following changes to your systems requirements as follows:
Bacteriological Sampling
The total number of bacteriological samples this system is now required to take is 10 samples
each month . It is still your responsibility to send a copy of all results to our office by the 10th of
the following month. In the event of a coliform positive result, you are required to take three
repeat samples and a triggered source E.coli sample for each ground water source in service at
the time of the original positive sample. The system is required to submit an updated written
sample site plan that identifies sampling sites and sample collection schedules that are
representative of water throughout the distribution system. For any questions regarding the Total
Coliform rule or Groundwater rule, contact Sitara Federico at (385) 515-1459 or
sfederico@utah.gov. This new sample schedule will take effect on July 1, 2024.
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830
Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284
www.deq.utah.gov
Levi Jones
Page 2 of 2
A current monitoring schedule for your system has been enclosed. If this letter is in error please
contact me at (801) 641-6457 or mberger@utah.gov within 30 days. Thank you for your efforts
in maintaining a safe drinking water system.
Sincerely,
Mark Berger
Monitoring and Standards Section Manager
Enclosure: Monitoring Schedule
Revised Total Coliform Rule (RTCR) Sample Site Plan
cc: Levi Jones, ljones@moabcity.org
Orion Rogers, Southeastern Utah District Health Department
Curtis Page, P.E.
Sitara Federico
Contacts
Type: Administrative Contact
Name: LEVI GABRIEL JONES
Office: 435-259-7485
Emergency:
Email:
ljones@moabcity.org
Site Information
Legal Contact: MOAB
Address: 217 East Center St. , MOAB,
UT 84532-2439
Phone: 435-259-7485
County: GRAND COUNTY
System Type: Community
Certification Required: D3
Total Population: 9000
Local Health District: Southeastern
Utah District Health Dept
Site Updates
Last Inventory Update: 10/26/2023
Last Surveyor Update:
Surveyor:
Operating Period: / - /
Last IPS Update: 04/18/2024 07:10:00
Political Districts
Representative: 70
Senate: 27
Water Usage Information per ERC
Total Ips Points: 40
Public Water System Water Monitoring ReportDEQ | Drinking Water
Moab City PWS ID: UTAH10003 Rating: Approved 03/11/1980 Status: Active
BACTERIOLOGICAL MONITORING
Sample Count Type Frequency Schedule Begin Schedule End Analyte Name
8 Routine Monthly 02/01/2017 COLIFORM (TCR)
DISINFECTION BYPRODUCT STAGE 2 MONITORING
Sample Count Type Frequency Sample Label
1 Routine Yearly UTAH10003 DS001 Sample ID below
Sample ID Site Last Sampled Next Sample Due
MR001 LYONS PARK 07/05/2023 07/01/2024-09/30/2024
OTHER DISTRIBUTION MONITORING
Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due
LEAD AND COPPER DS001 20 Routine 3 Years 08/2022 06/01/2025-09/30/2025
CHLORINE RESIDUAL MONITORING
ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due
DS001 UTAH10003 DISTRIBUTION SYSTEM 12 Routine Monthly --
MONITORING REQUIREMENTS BY FACILITY
ID Name Facility Details
WS001 SPRING #1 Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 05/01/2019 01/01/2020 - 12/31/2028
NITRATE 1 Routine Yearly 03/29/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 05/17/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 9 Years 05/01/2019 01/01/2020 - 12/31/2028
SULFATE,SODIUM,TDS 1 Routine 9 Years 05/01/2019 01/01/2020 - 12/31/2028
VOLATILE ORGANICS 1 Routine 3 Years 03/29/2023 01/01/2026 - 12/31/2028
WS002 SPRING #2 Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 05/01/2019 01/01/2020 - 12/31/2028
NITRATE 1 Routine Yearly 03/29/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 05/17/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 9 Years 05/01/2019 01/01/2020 - 12/31/2028
SULFATE,SODIUM,TDS 1 Routine 9 Years 05/01/2019 01/01/2020 - 12/31/2028
VOLATILE ORGANICS 1 Routine 3 Years 03/29/2023 01/01/2026 - 12/31/2028
WS003 SPRING #3 Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 05/01/2019 01/01/2020 - 12/31/2028
NITRATE 1 Routine Yearly 03/28/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 05/17/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 9 Years 05/01/2019 01/01/2020 - 12/31/2028
SULFATE,SODIUM,TDS 1 Routine 9 Years 05/01/2019 01/01/2020 - 12/31/2028
VOLATILE ORGANICS 1 Routine 3 Years 03/28/2023 01/01/2026 - 12/31/2028
WS007 WELL #6 Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 07/16/2019 01/01/2020 - 12/31/2028
NITRATE 1 Routine Yearly 03/28/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 05/17/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 9 Years 07/16/2019 01/01/2020 - 12/31/2028
SULFATE,SODIUM,TDS 1 Routine 9 Years 07/16/2019 01/01/2020 - 12/31/2028
VOLATILE ORGANICS 1 Routine 3 Years 03/28/2023 01/01/2026 - 12/31/2028
WS010 WELL #10 ROBERTSON Hide Details
¹To fulfill the two pesticide sample requirements, systems are to submit the second pesticide sample in the quarter following the quarter in which the first sample was
collected.
ID Name Facility Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 07/16/2019 01/01/2020 - 12/31/2028
NITRATE 1 Routine Yearly 03/28/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 05/17/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 9 Years 07/16/2019 01/01/2020 - 12/31/2028
SULFATE,SODIUM,TDS 1 Routine 9 Years 07/16/2019 01/01/2020 - 12/31/2028
VOLATILE ORGANICS 1 Routine 3 Years 03/28/2023 01/01/2026 - 12/31/2028
WS012 SKAKEL SPRING Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 07/16/2019 01/01/2020 - 12/31/2028
NITRATE 1 Routine Yearly 03/29/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 05/17/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 9 Years 10/21/2021 01/01/2029 - 12/31/2037
SULFATE,SODIUM,TDS 1 Routine 9 Years 10/21/2021 01/01/2029 - 12/31/2037
VOLATILE ORGANICS 1 Routine 3 Years 03/29/2023 01/01/2026 - 12/31/2028
GROUPED SOURCE SAMPLING STATIONS
Sample Group ID Sample Group Facility Details
OPEN COMPLIANCE SCHEDULES
Type Required Activities Severity Created Due
Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024
Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024
CCR SCHEDULES Submit Consumer Confidence Report 01/01/2024 07/01/2024
CCR SCHEDULES Submit CCR Certification Letter 01/01/2024 10/01/2024
Utah Division of Drinking Water
Bacteriological Sample Site Plan
All public water systems are required under the Revised Total Coliform Rule (RTCR) to submit a Bacteriological
Sample Site Plan. The purpose of the wri en sample site plan is to ensure the collec on of samples from points in
the distribu on system that best represent the quality of water served to customers, to iden fy repeat sampling
loca ons, and to establish a sampling schedule.
What to include in the plan:
1. The following should be submi ed for the Bacteriological Sample Site Plan:
a. The plan must include a MAP of the distribu on system. Excep ons are small systems such as
restaurants, schools, office buildings, and some small industries.
b. Bacteriological Sample Site Plan form.
2. The map should show loca ons of all distribu on lines, sources, treatment, storage tanks and sampling
sites. Iden fy each sampling site by street address and a numeric point code. Give a brief descrip on of
the site. For example: 201 Main Street, 1. DS001, outside house tap, or Maintenance Facility, 1. DS001,
men’s restroom sink. The sampling site Numeric Point Code should begin with the number 1 and then
con nue in sequen al numeric order. Use the numeric point code, along with DS001, when submi ng
samples to the laboratory.
3. Locate sample sites so they represent all areas of the distribu on system. You may wish to include
comments on your plan showing the reason(s) for selec ng each site. Such as popula on density,
industrial areas, pressures zones, areas vulnerable to poten al contamina on, dead-end lines, and
purchased source entry points. Alternate sampling loca ons through different loca ons of the water
system.
4. Do NOT indicate the raw water tap or sources as sampling sites for rou ne or repeat coliform samples.
These are “triggered source” sampling loca ons under the Groundwater Rule (GWR). Indicate the
associated source (by DDW assigned source codes) for each sample loca on. For example: “WS001”,
“WS002 and WS004”, or “All Sources” supply this specific loca on.
5. Include the loca on for “Repeat ” sample sites. Repeat samples must be collected at the following
loca ons within 24 hours of a total coliform or E coli posi ve sample:
- The tap where the original posi ve coliform sample was collected,
- A tap within five (5) service connec ons upstream, and
- A tap within five (5) service connec ons downstream.
6. Alterna ve fixed repeat loca ons may be iden fied at loca ons that best verify and determine the extent
of poten al contamina on in the distribu on system based on a specific situa on.
7. For system with only one or two service connec ons (suitable sampling taps), collect all three repeat
samples in one day from the limited number of sampling taps. The sample site plan should show which
taps(s) are in use for mul ple samples.
8. The number of rou ne coliform samples collected each month is based on the popula on of the water
system. For a table indica ng the number of samples required see Sec on R309-210-5.
9. Include a schedule for selec on of the samples. Systems using only groundwater and serving less than
4,900 people (five samples required per month or fewer) may collect all required sample on a single day.
Systems with greater than five samples per month must collect a por on of the samples at regular
intervals throughout the month with the total number being the number required.
revised 2/3/2021
S UBMITTAL
Mail the completed form to:
Or Email:
Division of Drinking water
A n: Sitara Federico
195 N 1950 W
PO BOX 144830
Salt lake City, UT 84114
DDWREPORTS@UTAH.GOV
This applica on and related environmental informa on are available online: DrinkingWater.utah.gov
revised 2/3/2021
Bacter iolo gical Sample Site Plan
B ASIC W ATER S YSTEM I NFO
Water System Name: Water System #:
S ITE S ELECTION I NFO
Monthly Rou ne Sample Sites (mark an “X” in boxes below): Follow-up/Repeat Sample (range
or specific address)
DDW Assigned #
for Associated
Rou ne Sample Point
Descrip on
(horse bib, sink faucet, etc.) Address Point
ID
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
1-DS00
1 Down Up
2-DS00
1 Down Up
3-DS00
1 Down Up
4-DS00
1 Down Up
5-DS00
1 Down Up
6-DS00
1 Down Up
S OURCE INFO
C ERTIFICATION
Samples Collected by: Plan Submitted by: Date Submitted:
revised 2/3/2021
Source(s) Name: DDW Source
or Group # Bacteria Sampling Laboratory Information:
Laboratory:
Address:
City:
Zip Code:
Phone
Number:
Contact Name:
_______________________________________
____
_______________________________________
____
_______________________________________
____
_______________________________________
____
_______________________________________
____
_______________________________________
____
_______________________________________
____