Loading...
HomeMy WebLinkAboutDERR-2024-004656 ERRP 3/1/2024 Sarah Gallien Walmart Incorporated 2101 SE Simple Savings Dr. Bentonville, Arkansas 72716 Re: Underground Storage Tanks One-Time Drop Walmart Supercenter Fueling Station #5270, located at 585 N. State St. Lindon, Utah 84042 Facility Identification No. 1000995 Dear Mrs. Gallien: According to the provisions of the Utah Underground Storage Tank Act (Act), Utah Code Annotated (UCA), Section 19-6-412, all owners and operators of petroleum underground storage tanks (USTs) must have a certificate of compliance. Any person who delivers or accepts delivery of petroleum to a tank that does not have a certificate of compliance will be subject to a civil penalty of up to $500.00 per occurrence (19-6-416, UCA). The Utah UST rules, Utah Admin. Code (UAC) R311-206-8(e), allow the Division Director to authorize a delivery of petroleum for ballasting tanks at installation or testing tanks prior to issuing a certificate of compliance. The Division of Environmental Response and Remediation (DERR) has received your request to receive a delivery of fuel to fill your tanks in order to test (or set) them. This letter satisfies the requirement for written authorization for a delivery in accordance with UAC R311- 206-8(e). The authorization applies to fuel being delivered by Solar Transport for the period of 03/05/2024 through 03/11/2024 and is NOT a certificate of compliance. In order to obtain a certificate of compliance you must still provide: 1. A properly completed EPA Notification for Underground Storage Tanks. 2. A completed Application for Certificate of Compliance. 3. Payment of all UST Fees and, if applicable Petroleum Storage Tank (PST) Trust Fund Fees. 4. Passing results for the following: a. Tank tightness test(s), b. Line tightness test(s), c. Line leak detector test(s), d. Spill bucket tightness test(s), e. Secondary containment tightness test(s), f. Overfill prevention device inspection/test(s), Page 2 g. Automatic tank gauge test(s). 5. A completed Previous Pollution Incident Form. 6. A completed as-built drawing, including placement of UST(s). 7. A completed Manufacturer’s tank installation checklist. The enclosed packet provides additional information and forms to assist you in providing the required documents. If after the DERR review, the Division Director determines your tanks are in substantial compliance with federal and state rules and regulations, a certificate of compliance may be issued. If you have any questions, please contact Laura Perdue, the DERR project manager, at (256) 656-2847. Sincerely, Brent H. Everett, Director Division of Environmental Response and Remediation BHE/***/*** Enclosure: Certificate of Compliance Packet cc: LHD District Engineer