Loading...
HomeMy WebLinkAboutDERR-2024-004585APPLIED ENVIRONMENTAL SERVICES, L.C. PO BOX 1073 BOUNTIFUL, UTAH 84011 801-540-9258 T.E.I. SYSTEM 4000 / T.E.I. LT3 / T.E.I. ULLAGE PRECISION TANK & LINE TEST RESULTS SUMMARY INVOICE ADDRESS: TANK LOCATION: WORK ORDER # TECH # 94027 VAN # 8502 TECHNICIAN: SM STATE TECH # STATE FUEL NETWORK PO BOX 141152 SALT LAKE CITY, UTAH 84141-1152 UTAH DOT#436 # 5000215 250 SOUTH 200 EAST EMERY, UTAH 24006 UT 0121 DATE:2-20-2024 TIME START: TIME END: GROUNDWATER DEPTH: TIME SYSTEM FILLED OR TOPPED: TANK TANK CAPACITY 2000 4000 PRODUCT R/UL DSL TANK VENT PRODUCT LINE PASS PASS LINE LEAK DETECTOR PASS PASS WATER IN TANK PUMP TYPE PRESS PRESS TANK MATERIAL CONVAULT CONVAULT 1 2 3 4 5 6 PRODUCT LINES TESTED AT 50 PSI FOR 15 MINUTES LINE RATES (GPH) 1 2 3 4 5 6 R/UL -.007 DSL -.004 ADDITIONAL INFORMATION:MECHANICAL LINE LEAK DETECTORS PASS 3 GPH SIMULATED LEAK TEST ABOVEGROUND TANKS WITH UNDERGROUND PRODUCT LINES CERTIFIED TECHNICIAN SIGNATURE: DATE:2-20-2024 All tests are performed in a professional manner, and within common practices of the industry. However due to the variables of tank testing, these results cannot be guaranteed. There are no warranties expressed, written or implied. These systems meet all requirements set forth by USEPA 40 CFR and has recieved third party certification. Digitally signed by STEVEN B MARTIN cn=STEVEN B MARTIN, o=AES, c=US Date: 2024.02.26 10:06:18 -07'00' Reason: I am the author of this document SPILL PREVENTION TEST Spill Bucket Hydrostatic Test Form Facility Name Facility ID Address Tester's Name Test Date Phone Tank Number Product Stored Capacity Manufacturer Construction Liquid and Debris Removed Visual Inspection No cracks, holes, or separations Tank Riser Cap Included in Test Is Drain Valve Included in Test Start Level Start Time Ending Level End Time Test Period (minimum of 1 hour) Change in Level Test Results Photos indicating water Levels are Attached? Pass / Fail Criteria: Must pass visual inspection, test duration at least one hour, must include photos with this form, water level drop of less than 1/8 inch. Ref: PEI / RP 1200 6.2.5 Test Procedure How was Liquid Disposed? Comments I certify under penalty of law that the above information is true, accurate and complete Tester's Signature UTAH DOT # 436 5000215 250 SOUTH 200 EAST EMERY, UTAH STEVEN MARTIN AES TESTING UT 0121 2-20-2024 801-540-9258 1 R/UL 5 G CONVAULT SWS YES PASS YES YES 11 1/2 11:16 11 1/2 12:16 1 HR 0 PASS NO 2 DSL 5 G CONVAULT SWS YES PASS YES YES 11 1/8 11:16 11 1/8 12:16 1 HR 0 PASS NO REUSED CONVAULT TANKS WITH BUILT IN SPILL CONTAINMENTS Digitally signed by STEVEN B MARTIN cn=STEVEN B MARTIN, o=AES, c=US Date: 2024.02.26 10:43:00 -07'00' Reason: I am the author of this document UTAH STATE FUEL NETWORK AST ANNUAL INSPECTION Facility Name and Site Address: Date: Facility ID # Purpose:Regular Reinspection Complaints Annual Inspection Nu m b e r Te s t e d Sa t i s f i e d Re j e c t e d A d v i s e Pumps Tested for Calibration Is tank grounding strap in good condition ? Is tank coating free of corrosion / damage ? Is tank free of noticable distortion, denting, buckeling ? Flanged connection bolts appear tight ? Normal and emergency vents appear in good condition ? Inspection Remarks: Technician signature Inspected By: Steven B. Martin UT121 Applied Environmental Services L.C. UTAH DOT # 436 250 SOUTH 200 EAST EMERY, UTAH 2-20-2024 5000215 X 1-2 X X X X X X NO DEDICATED GROUND STRAPS X X N/A X XNO X State Fuel Contact : Brett Gurney 385-602-4872 801-540 9258 Aesutah@aol.com Email: Brettgurney@utah.gov X X X X X X X X Fill and vapor connections in good condition ? CONVAULT ASTS WITH UNDERGROUND PRODUCT LINES CRACKS AND FLAKING IN CONCRETE COATING ON CONVAULT TANKS XTank containment structure in satisfactory condition ? Free of tank settlement and foundation washout ? Tank supports in satisfactory condition ? Is water able to drain off tank pad and tank top ? Gasoline vent has P/V valve installed where required ? Valves / syphons / solenoids appear in good condition ? Spill containment visable and appears in good condition Electrical junction boxes and conduits in good condition Tank monitor free of active alarms ? Emergency shutoff installed ? Dispenser static test ? Tank overfill equipment installed ? Piping sumps appear in good condition ? COMMENTS / ACTION Digitally signed by STEVEN B MARTIN cn=STEVEN B MARTIN, o=AES, c=US Date: 2024.02.26 10:16:00 -07'00' Reason: I am the author of this document