HomeMy WebLinkAboutDERR-2024-004578Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name Intermountain Healthcare - Hurricane
Address 75 N 2260 W
HURRICANE, UT 84737
Contact Intermountain Healthcare - Hurricane
Phone
Email clair.hansen@imail.org
TANK LOCATION
Name Hurricane Valley Clinic
Address 75 N 2260 W
HURRICANE, UT 84737
A Operator MICHAEL WEBB
Phone (435) 680-2477
B Operator SAME
Phone SAME
Facility ID: 6001041 Inspection Date: 02/28/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
TANK DETAILS
Tank ID/Alt ID 1 / 1
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Dec. 12, 2022 / 15000 / Single
Substance
Stored Diesel /
Tank Material-
Mod
Composite (Steel w/ FRP)-
Double-Walled
ATG Veeder Root / TLS-450
Interstitial Monitor
LTT Test None
LLD Test Aug. 25, 2023
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Veeder Root PLLD
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
Title: line leak detector
has 2 line leak detectors, which may be an issue when surgical bays are added
No Photos
Title: overfill alarm
has alarm
No Photos
2024-02-28 Page 1 of 4
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?Yes
Is a sign posted in a conspicuous area
giving the name and telephone number
of a person in case of an emergency
and if the station is manned part of the
time, are C operators trained?
Yes
Does the site have emergency shutoff
device?Yes
TANK RESPONSES
Tank 1 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 1 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 1 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 1 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2024-02-28 Page 2 of 4
Tank 1 ATG/IM
Does the ATG system have a valid
annual test?Yes
Does the Containment Sump have a
valid 3-year test?Yes
DISPENSER RESPONSES
MONTHLY LEAK DETECTION MONITORING
Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24
Tank 1 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Pass Pass
NON-COMPLIANCE ITEMS
All items are in compliance.
2024-02-28 Page 3 of 4
Prepared by fueloperator.com
Inspection Information
Inspector:Saathoff, Rick
Record Created:Feb. 28, 2024, 2:34 p.m.
Inspection Date:Feb. 28, 2024
2024-02-28 Page 4 of 4