Loading...
HomeMy WebLinkAboutDERR-2024-004578Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name Intermountain Healthcare - Hurricane Address 75 N 2260 W HURRICANE, UT 84737 Contact Intermountain Healthcare - Hurricane Phone Email clair.hansen@imail.org TANK LOCATION Name Hurricane Valley Clinic Address 75 N 2260 W HURRICANE, UT 84737 A Operator MICHAEL WEBB Phone (435) 680-2477 B Operator SAME Phone SAME Facility ID: 6001041 Inspection Date: 02/28/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST TANK DETAILS Tank ID/Alt ID 1 / 1 E-Gen/AST Yes / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc Dec. 12, 2022 / 15000 / Single Substance Stored Diesel / Tank Material- Mod Composite (Steel w/ FRP)- Double-Walled ATG Veeder Root / TLS-450 Interstitial Monitor LTT Test None LLD Test Aug. 25, 2023 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Veeder Root PLLD Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None INSPECTION COMMENTS Title: line leak detector has 2 line leak detectors, which may be an issue when surgical bays are added No Photos Title: overfill alarm has alarm No Photos 2024-02-28 Page 1 of 4 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?Yes Is a sign posted in a conspicuous area giving the name and telephone number of a person in case of an emergency and if the station is manned part of the time, are C operators trained? Yes Does the site have emergency shutoff device?Yes TANK RESPONSES Tank 1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 1 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 1 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2024-02-28 Page 2 of 4 Tank 1 ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes DISPENSER RESPONSES MONTHLY LEAK DETECTION MONITORING Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Tank 1 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Pass Pass NON-COMPLIANCE ITEMS All items are in compliance. 2024-02-28 Page 3 of 4 Prepared by fueloperator.com Inspection Information Inspector:Saathoff, Rick Record Created:Feb. 28, 2024, 2:34 p.m. Inspection Date:Feb. 28, 2024 2024-02-28 Page 4 of 4