Loading...
HomeMy WebLinkAboutDDW-2024-006271 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF DRINKING WATER Nathan Lunstad P.E. Director February 27, 2024 Bonner Hardgree Fruitland Water SSD H.C. 63 Box 270130 Fruitland, UT 84027 Subject: Notice of Increased Monitoring for Fruitland Water SSD, UTAH07058 Bonner Hardgree: According to the Division of Drinking Water’s (the Division) records, the Mill Hollow Upper Spring (listed as WS001 in the Divisions database) was determined to have exceeded the turbidity maximum contaminant level (MCL) on June 28, 2022. The MCL for turbidity is 5 Nephelometric Turbidity Units (NTU), and the combined average of the four (4) measurements taken per the requirements of R309-205-8(2) was 10 NTU. As a result, the Mill Hollow Upper Spring (WS001) was required to treat for turbidity, per the letter attached here from June 28, 2022. Fruitland Water SSD (UTAH07058) redeveloped the Mill Hollow Upper Spring (WS001) and received a temporary operating permit for the redevelopment on January 16, 2024. The temporary operating permit contained requirements for bacteriological monitoring and Microscopic Particulate Analysis (MPA) testing. Since the Mill Hollow Upper Spring (WS001) was also determined to be required to treat for turbidity prior to the redevelopment, the source is also subject to increased monitoring for turbidity to determine the success of the redevelopment. Fruitland Water SSD is required to take monthly turbidity samples at Mill Hollow Upper Spring (WS001) during the operating period when the spring is accessible and shall continue for a minimum of 12 months of data. This schedule will begin in March 2024. If there are months the spring is not accessible, you are required to notify the Division. If at any point the turbidity of the Mill Hollow Upper Spring (WS001) is measured above 5 NTU, Fruitland Water SSD shall take three (3) additional follow up turbidity samples from the spring within a month of the initial sample date. Bonner Hardgree Page 2 of 2 February 27, 2024 Facility with new requirements Analyte(s) Required # Of samples Sampling Frequency Next Due Date Rule Reference WS001 Upper Mill Hollow Spring Turbidity 1 Monthly 03/01/2024- 03/31/2024 R309-215-6 You will find a current copy of your complete monitoring schedule enclosed and online at waterlink.utah.gov by selecting your system and then selecting Water Monitoring under Water System Reports. Thank you for your efforts in maintaining a safe drinking water system. If you have questions concerning your sampling requirements, please contact David Kruse at 385-566- 7789 (dbkruse@utah.gov). Sincerely, Mark Berger Monitoring and Standards Implementation Manager Enclosure – Monitoring Schedule Turbidity MCL Exceedance and Violation – Fruitland Water SSD UTAH07058, Mill Hollow Upper Spring (WS001) cc: Darrin Brown, TriCounty Health Department, dbrown@tricountyhealth.com Bonner Hardgree, Fruitland Water SSD, fssd@ubtanet.com Nathan Hall, DEQ District Engineer, nhall@utah.gov Mark Berger, Division of Drinking Water, mberger@utah.gov David Kruse, Division of Drinking Water, dbkruse@utah.gov VSA Team, Division of Drinking Water, eqdwvsa@utah.gov June 28, 2022 Bonner Hardgree Fruitland Water SSD P.O. Box 270130 Fruitland, UT 84027 Subject:Turbidity MCL Exceedance and Violation,Treatment Required – Fruitland Water SSD UTAH07058, Mill Hollow Upper Spring (WS001) Bonner Hardgree: The Division of Drinking Water (the Division) records indicate that you are the responsible party for Fruitland Water SSD (UTAH07058). The Fruitland Water SSD water system is a public water system and thus subject to the Administrative Rules for Public Drinking Water Systems. On May 3, 2022, Fruitland Water SSD measured turbidity from Mill Hollow Upper Spring in response to positive bacteriological test results. A result of 20.8 Nephelometric Turbidity units (NTUs) was obtained, significantly above the 5 NTU Maximum Contaminant Limit (MCL) (R309-200-5(5)(c)(ii)). Fruitland Water SSD measured turbidity from Mill Hollow Upper Spring three additional times, per the requirements of R309-205-8(2). The combined average of these four measurements is 10.07 NTU, which is above the turbidity MCL of 5 NTU and results in a turbidity MCL violation being assessed to Mill Hollow Upper Spring (WS001).Per R309-205-8(2), Mill Hollow Upper Spring (WS001) is reclassified as being required to treat for turbidity. The test results for Mill Hollow Upper Spring (WS001) show iron levels greater than the EPA’s secondary MCL of 0.3 mg/L (R309-200-6). Secondary MCLs represent concentrations above which aesthetic impacts to the drinking water may be observed. Mill Hollow Upper Spring is consistently producing water that exceeds secondary MCLs for iron, likely contributing to the high turbidity observed in Mill Hollow Upper Spring. Required Actions Tier 2 public notice is required for this turbidity MCL violation, with public notice required for as long as Mill Hollow Upper Spring is in use and exceeds the turbidity MCL.The public notice template is attached. The system must provide the public notice as soon as practical, but no later than 30 days after the system learns of the violation. If the public notice is posted, the notice must remain in place for as long as the violation persists, but in no case for less than seven days, Bonner Hardgree Page 2 of 3 June 28, 2022 even if the violation is resolved (see R309-220-6(1)(a) and R309-220-6(1)(b)). This public notice requirement cannot be waived once a violation occurs. Proof of public notification must be provided to the Division at ddwreports@utah.gov within 30 days of notifying the water system customers and resubmitted each quarter the violation remains unresolved. Prior to using Mill Hollow Upper Spring (WS001) as a drinking water source, you must install and operate a Division-approved permanent treatment facility to remove turbidity or complete successful redevelopment of the source. Mill Hollow Upper Spring will be marked as an unapproved source until action is taken. If turning this source out of the system is not an option, Fruitland Water SSD may continue to use the source, but 200 IPS points will be assessed for use of an unapproved source, and public notice will be required on an ongoing basis as outlined above. Installation of a permanent turbidity treatment facility must go through the Division’s approval process including: 1.Complete Division Plan Approval prior to construction of a treatment facility. 2.Issuance of a Division Operating Permit for the treatment facility prior to operations. Mill Hollow Upper Spring will remain an unapproved source until permanent treatment is installed to remove turbidity or the source is successfully redeveloped.This source has already been designated as an unapproved source due to the requirement to disinfect to secondary standards, so no additional points will be assessed. It is the Division’s understanding that Fruitland Water SSD intends to enter into a Corrective Action Plan (CAP) to provide the time needed to redevelop this source in an attempt to eliminate the bacteriological and turbidity issues requiring treatment. After redevelopment, a period of source sampling for both bacteriological and turbidity parameters will be required to demonstrate successful redevelopment. Additional Monitoring Based on the determination that Mill Hollow Upper Spring (WS001) is required to treat for turbidity, the following monitoring is required: 1.Water Quality Sampling a.This system is required to take monthly samples at Mill Hollow Upper Spring (WS001)for turbidity and iron during the operating period.This schedule will begin July 2022.Additional monitoring may be required as a condition of the CAP. b.Data should be sent directly to Sarah Page at sepage@utah.gov by the 10th of the following month. Bonner Hardgree Page 3 of 3 June 28, 2022 Please contact Ryan Dearing at (801) 560-8456 or rdearing@utah.gov or Sarah Page at (385) 272-5778 or sepage@utah.gov if you have any questions or need assistance. Sincerely, Mark Berger Rules Section Manager Enclosure - Public Notice-template-tier-2 Turbidity cc:Bonner Hardgree, Fruitland Water SSD, fssd@ubtanet.com Cindy Austreng, Tri-County Health Department, caustreng@tricountyhealth.com Nathan Hall, District Engineer, nhall@utah.gov Tim Davis, Division of Drinking Water, timdavis@utah.gov Mark Berger, Division of Drinking Water, mberger@utah.gov VSA Team, Division of Drinking Water, EQDWVSA@utah.gov Ryan Dearing, Division of Drinking Water, rdearing@utah.gov Sarah Page, Division of Drinking Water, sepage@utah.gov Sitara Federico, Division of Drinking Water, sfederico@utah.gov Michael Newberry, Division of Drinking Water, mnewberry@utah.gov Jennifer Yee, Division of Drinking Water, jyee@utah.gov Utah Department Of Environmental Quality Division Of Drinking Water Admin Contacts Water Monitoring Report BACTERIOLOGICAL MONITORING Other Distribution Monitoring MONITORING REQUIREMENTS BY FACILITY FRUITLAND WATER SSD PWS ID: UTAH07058 Rating: Approved 06/06/1996 Active Legal Contact FRUITLAND WATER SSD BONNER HARDGREE H.C. 63 Box 270130 FRUITLAND, UT 84027 Phone: 435-548-2399 County: DUCHESNE COUNTY System Type: Community Population: 250 Site Updates Last Inventory Update: 03/20/2023 Last Surveyor Update: 06/07/2022 Surveyor: JOE HADLOCK Operating Period: 1/1 - 12/31 Last IPS Update: 02/21/2024 14:10:00 Consumptive Use Zone Irrigation Zone: 4 Date: 02/15/2013 Name Title Office Emergency Email HARDGREE, BONNER 435-548-2399 801-823-2399 fssd@ubtanet.com Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 1 Routine Monthly 11/01/2023 COLIFORM (TCR) Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due LEAD AND COPPER DS001 5 Routine 3 Years 2022 06/01/2025-09/30/2025 DEQ | Drinking Water Run Date: 02/21/2024 19:35:52 | Rating: Approved UTAH07058 FRUITLAND WATER SSD page 1 of 3 ID NAME SS968 SAMPLING STATION - 01 02 (7968) Name Sample Count Type Frequency Last Sampled Next Sample Due INORGANICS-COMPL 1 Routine 3 Years 12/29/2022 01/01/2023 - 12/31/2025 NITRATE 1 Routine Yearly 01/18/2024 01/01/2025 - 12/31/2025 RADS - COMPLIANCE 1 Routine 3 Years 12/29/2022 01/01/2023 - 12/31/2025 SULFATE,SODIUM,TDS 1 Routine 3 Years 12/29/2022 01/01/2023 - 12/31/2025 VOC-COMPL 1 Routine 6 Years 09/24/2019 01/01/2020 - 12/31/2025 WS001 MILL HOLLOW UPPER SPRING Name Sample Count Type Frequency Last Sampled Next Sample Due E. COLI 1 Routine Monthly 05/31/2022 07/01/2022 - 07/31/2022 TURBIDITY 1 Routine Monthly 05/31/2022 03/01/2024 - 03/31/2024 WS003 LITTLE RED SPRING Name Sample Count Type Frequency Last Sampled Next Sample Due INORGANICS-COMPL 1 Routine One Time 01/20/2005 07/31/2024 - 07/31/2024 NITRATE 1 Routine One Time 12/06/2023 07/31/2024 - 07/31/2024 RADS - COMPLIANCE 1 Routine One Time 03/29/2004 07/31/2024 - 07/31/2024 SULFATE,SODIUM,TDS 1 Routine One Time 01/20/2005 07/31/2024 - 07/31/2024 VOC-COMPL 1 Routine One Time 12/12/2007 07/31/2024 - 07/31/2024 WS004 WELL #1 Name Sample Count Type Frequency Last Sampled Next Sample Due INORGANICS-COMPL 1 Routine 9 Years 02/29/2016 01/01/2020 - 12/31/2028 NITRATE 1 Routine 9 Years 02/29/2016 01/01/2020 - 12/31/2028 PESTICIDES-COMPL 1 Routine 9 Years 06/26/2013 01/01/2020 - 12/31/2028 RADS - COMPLIANCE 1 Routine 9 Years 02/24/2016 01/01/2020 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 9 Years 02/29/2016 01/01/2020 - 12/31/2028 VOC-COMPL 1 Routine 9 Years 06/26/2013 01/01/2020 - 12/31/2028 Grouped Source Sampling Stations Sample Group ID Sample Group 7968 UTAH SAMPLING STATION SS968 Source ID Source Name Sample Group Details System WS003 LITTLE RED SPRING UTAH07058 FRUITLAND WATER SSD WS002 MILL HOLLOW LOWER SPRING UTAH07058 FRUITLAND WATER SSD WS001 MILL HOLLOW UPPER SPRING UTAH07058 FRUITLAND WATER SSD DEQ | Drinking Water Run Date: 02/21/2024 19:35:52 | Rating: Approved UTAH07058 FRUITLAND WATER SSD page 2 of 3 Open Compliance Schedule Type Required Activities Severity Created Due Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024 Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024 TEMPORARY OPERATING PERMIT GWR CORRECT DEFICIENCY 30 DAYS SIG 01/16/2024 01/10/2027 CCR SCHEDULES Submit Consumer Confidence Report 01/01/2024 07/01/2024 CCR SCHEDULES Submit CCR Certification Letter 01/01/2024 10/01/2024 DEQ | Drinking Water Run Date: 02/21/2024 19:35:52 | Rating: Approved UTAH07058 FRUITLAND WATER SSD page 3 of 3