Loading...
HomeMy WebLinkAboutDAQ-2024-0078861 DAQC-CI104280003-24 Site ID 10428 (B1) MEMORANDUM TO: FILE – GREENFIBER SALT LAKE CITY INCORPORATED – Cellulose Insulation Production Plant THROUGH: Chad Gilgen, Minor Source Compliance Section Manager FROM: Irene Tucker, Environmental Scientist DATE: April 16, 2024 SUBJECT: FULL COMPLIANCE EVALUATION, Minor, Salt Lake County INSPECTION DATE: April 4, 2024 SOURCE LOCATION: 3061 South 3600 West West Valley City, UT 84119 SOURCE CONTACT: Garrett Humphreys, Plant Manager, 801-972-6551 Ext. 5103 Garrett.Humphreys@greenfiber.com OPERATING STATUS: GreenFiber was conducting a Planned Maintenance activity at the time of this inspection. PROCESS DESCRIPTION: Produces a fire retardant cellulose insulation. The process consists of mixing borax and other fire retardant materials to shredded paper. Trucks deliver recycled newspaper/cardboard which is off-loaded onto a cement floor inside the building. A front-end loader lifts the paper/cardboard into a hopper where a conveyer belt delivers the paper to a pre-shredder. The shredded paper is augured to the hammer mill for grinding. The ground-up paper then goes into a gravity-fed surge bin and through an attrition mill. Fire retardant chemicals are transferred from storage silos into a hopper and augured through a metering device and blown into the hammer mill for impregnation with the paper by heat and friction. A fan then blows the insulation to the bagger machine for packaging into twenty and thirty pound plastic bags. The bagged product is hand palletized and moved by forklifts to transport trucks and trailers. APPLICABLE REGULATIONS: Approval Order (AO) DAQE-AN104280011-21, dated August 25, 2021 / : 2 SOURCE EVALUATION: Name of Permittee: Permitted Location: GreenFiber Salt Lake City Incorporated Cellulose Insulation Production Plant 3061 South 3600 West 3061 South 3600 West West Valley City, UT 84119 West Valley City, UT 84119 SIC Code: 2679: (Converted Paper & Paperboard Products, NEC) SECTION I: GENERAL PROVISIONS I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-101] I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-1] I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8] I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-401-4] I.6 The owner/operator shall comply with R307-150 Series. Inventories, Testing and Monitoring. [R307-150] I.7 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. [R307-107] Status: In Compliance. GreenFiber did not exceed any limits set forth by this AO. GreenFiber maintains records for at least two years and also records of maintenance activities performed on equipment approved by this AO. GreenFiber indicated that there has been no breakdown of equipment resulting in an emissions event. According to the SLEIS Database, GreenFiber is not required to submit an Emissions Inventory Record at this time. 3 SECTION II: PERMITTED EQUIPMENT II.A THE APPROVED EQUIPMENT II.A.1 Cellulose Insulation Production Plant: II.A.2 Front End Loaders Listed for informational purposes only II.A.3 One (1) Paper Hopper II.A.4 One (1) Pre-shredder Hammer Mill II.A.5 One (1) Hammer Mill II.A.6 Cyclone Separator #1 Venting though Baghouse #1, #2, and #3 II.A.7 Cyclone Separator #2 Venting through Baghouse #4 and #5 II.A.8 Two (2) Collection/Metering Bins II.A.9 Two (2) Attrition Mills II.A.10 One (1) Bagger II.A.11 One (1) Conveyor II.A.12 Two (2) Metering Hoppers II.A.13 Two (2) Blenders II.A.14 One (1) Grinder II.A.15 Seven (7) Storage Silos Each vented to its own dedicated bin vent baghouse II.A.16 Baghouse #1 Description: Cyclone #1 Baghouse Location: North side of building #1 II.A.17 Baghouse #2 Description: Cyclone #1 Baghouse Location: North side of building #1 II.A.18 Baghouse #3 Description: Cyclone #1 Baghouse Location: North side of building #1 4 II.A.19 Baghouse #4 Description: Cyclone #2 Baghouse Location: North side of building #2 II.A.20 Baghouse #5 Description: Cyclone #2 Baghouse Location: North side of building #2 II.A.21 Baghouse #6 Description: Fire Retarde System Baghouse Location: East side of building #1 II.A.22 Bin Vent #1 Description: Material Storage Silo #1 Bin Vent Location: On top of silo #1 II.A.23 Bin Vent #2 Description: Material Storage Silo #2 Bin Vent Location: On top of silo #2 II.A.24 Bin Vent #3 Description: Material Storage Silo #3 Bin Vent Location: On top of silo #3 II.A.25 Bin Vent #4 Description: Material Storage Silo #4 Bin Vent Location: On top of silo #4 II.A.26 Bin Vent #5 Description: Material Storage Silo #5 Bin Vent Location: On top of silo #5 II.A.27 Bin Vent #6 Description: Material Storage Silo #6 Bin Vent Location: On top of silo #6 II.A.28 Bin Vent #7 Description: Material Storage Silo #7 Bin Vent Location: On top of silo #7 Status: In Compliance. There was no new or unapproved equipment observed onsite during this inspection. GreenFiber was conducting Planned Maintenance and noted that Cyclone #1 Baghouse in AO Condition II.A.16 and Baghouse #6 in AO Condition II.A.21 have not been in operation for a while. SECTION II: SPECIAL PROVISIONS II.B REQUIREMENTS AND LIMITATIONS II.B.1 Cellulose Insulation Production Plant: 5 II.B.1.a The owner/operator shall not produce more than 87,000 tons of cellulose insulation per rolling 12-month period. [R307-401-8] II.B.1.a.1 The owner/operator shall: A. Determine production by production tracking logs and/or billing records B. Record production on a daily basis C. Use the production data to calculate a new rolling 12-month total by the 20th day of each month using data from the previous 12 months. [R307-401-8] Status: In Compliance. In a rolling 12-month from April 2023 to March 2024, 28,896.37 tons of cellulose insulation were produced. The production was determined from production tracking logs and from daily production records. See the attachment for additional information. II.B.1.b The owner/operator shall not allow visible emissions from any stationary point or fugitive emission source associated with the source or with the control facilities to exceed 10% opacity. [R307-201-3] II.B.1.b.1 Opacity observations of emission from stationary sources shall be conducted in accordance with 40 CFR 60, Appendix A, Method 9. [40 CFR 60 Subpart A, R307-401-8] Status: Compliance Undetermined. During this inspection, GreenFiber was conducting a Planned Maintenance activity. II.B.2 Baghouses & Bin Vents II.B.2.a The owner/operator shall ensure that each cyclone separator or fabric filter baghouse shall control the process streams as indicated in Section II.A of this AO. All exhaust air from each process stream shall be routed through the identified fabric filter baghouse before being vented to the atmosphere. [R307-401-8] Status: In Compliance. GreenFiber confirmed that when the plant is in operation, each cyclone separator or fabric filter baghouse control the process streams as indicated in Section II.A of this AO. In addition, all exhaust air from each process stream is routed through the identified fabric filter baghouse before being vented to the atmosphere. II.B.2.a.1 The owner/operator shall ensure that the fabric filters installed in each baghouse have a porosity of 0.5 micrometers or use equivalent technology as determined by the Director. [R307-401-8] Status: In Compliance. GreenFiber confirmed that the fabric filters installed in each baghouse meets the manufacturer’s required porosity of 0.5 micrometers as required by this AO Condition. II.B.2.b The owner/operator shall ensure that all bin vent and baghouse exhaust stacks discharge vertically, unrestricted by any attachment. [R307-401-8] Status: In Compliance. During this inspection, the bin vent and baghouse exhaust stacks were observed to be vertical and unrestricted. 6 II.B.2.b.1 Each bin vent exhaust stack exit shall be at least 50 feet in elevation and each baghouse exhaust stack exit shall be at least 35 feet in elevation, as measured from ground level. [R307-401-8] Status: In Compliance. During this inspection, GreenFiber confirmed that each bin vent exhaust stack exit and each baghouse exhaust stack exit met the elevation requirements of this AO Condition. II.B.2.c The owner/operator shall install a manometer or magnehelic pressure gauge on each baghouse to measure the differential pressure across its fabric filters. [R307-401-8] II.B.2.d The owner/operator shall ensure that the static pressure differential across the fabric filters is between 2 to 6 inches of water column. [R307-401-8] II.B.2.d.1 The pressure gauge shall be located such that an inspector/operator can safely read the indicator at any time. The reading shall be accurate to within plus or minus 1.0 inches of water column. The instrument shall be calibrated against a primary standard annually. The primary standard shall be established by the company, and shall be submitted to the Director for approval. Intermittent recording of the reading is required on a once per operational day basis. [R307-401-8] Status: In Compliance. Four Magnehelic Gauges were observed during this inspection. Because GreenFiber was conducting Planned Maintenance, all four gauges read zero. Differential pressure readings recorded when the plant is in operation, indicated compliance with this AO Condition. The Annual Calibration for the Magnehelic Gauges were conducted on May 15, 2023. See the attachment for additional information. SECTION III: APPLICABLE FEDERAL REQUIREMENTS In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. Status: Not Applicable. There are no Federal rules applicable to the processes of this facility. AREA SOURCE RULES EVALUATION The following Area Source Rules were evaluated during this inspection: R307-305:Nonattainment and Maintenance Areas for PM10: Emission Standards Status: Compliance Undetermined. During this inspection, GreenFiber was conducting a Planned Maintenance activity. R307-309: Nonattainment and Maintenance Areas for PM10 and PM2.5: Fugitive Emissions and Fugitive Dust Status: Compliance Undetermined. During this inspection, GreenFiber was conducting a Planned Maintenance activity. 7 R307-325: Ozone Nonattainment and Maintenance Areas: General Requirements Status: In Compliance. During this inspection, GreenFiber was conducting a Planned Maintenance activity with no operation of processes or process equipment. GreenFiber has a Safety Kleen Parts-Washer. During this inspection the Parts-Washer was closed. According to GreenFiber, the Safety Kleen Premium Solvent is used to clean metal parts. The spent solvent is transported for offsite disposal by Safety Kleen. See the SDS in the attachment. R307-335:Degreasing Status: In Compliance. During this inspection, GreenFiber was conducting a Planned Maintenance activity with no operation of processes or process equipment. GreenFiber has a Safety Kleen Parts-Washer. During this inspection the Parts-Washer was closed. EMISSION INVENTORY: Status: Not Applicable. According to the SLEIS Database, GreenFiber is not required to submit an Emissions Inventory Record at this time. The emissions listed below are an estimate of the total potential emissions (PTE) from GreenFiber Salt Lake City Incorporated- Cellulose Insulation Production Plant on the Approval Order (AO) DAQE-AN104280011-21, dated August 25, 2021. PTE are supplied for supplemental purposes only. Criteria Pollutant PTE tons/yr Particulate Matter - PM10 4.50 Particulate Matter - PM2.5 4.50 Hazardous Air Pollutant PTE lbs/yr PREVIOUS ENFORCEMENT ACTIONS: No enforcement actions within the past five years. COMPLIANCE STATUS & RECOMMENDATIONS: GreenFiber is in compliance with the conditions of the Approval Order (AO) DAQE-AN104280011-21, dated August 25, 2021. GreenFiber maintains good housekeeping practices. GreenFiber is aware of the Small Source Exemption criteria since the PTE of this AO is less than 5 tons/year, but would like to leave things as they are for now. HPV STATUS: Not Applicable. RECOMMENDATION FOR NEXT INSPECTION: Inspect as usual. Required PPE includes Steel-Toe Boots, Reflective Safety Vest, Ear Plugs, and Safety Glasses. 8 NSR RECOMMENDATIONS: Consider adding the Parts Washer to the equipment list. Evaluate for removal from the Equipment List Cyclone #1 Baghouse in AO Condition II.A.16 and Baghouse #6 in AO Condition II.A.21 from this AO, as they are no longer operational. ATTACHMENTS: Applicable Supporting Documentation Included