Loading...
HomeMy WebLinkAboutDERR-2024-004314LUST Correspondence Sign-Off Sheet ERRL# Author Subject File Name on Google Drive Enclosures Select Attached Select Specify Special Instructions PM verified site status module in database is current Draft ApprovalProcess Project Manager Section Manager Final ApprovalProcess Section Secretary Author Branch Secretary Administrative Secretary Section Secretary Certified Mail Select SelectEnclosures Included ccs Mailed Select Mailed By Department of Environmental Quality State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Kimberly D. Shelley Executive Director DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION Brent H. Everett Director ERRL-0018-24 January 29, 2024 CERTIFIEDMAIL RETURN RECEIPT REQUESTED Jason Miller 2455 West Main Street Tremonton, Utah 84337 Re: Subsurface Investigation Requirements and Petroleum Storage Tank Fund Eligibility Millers Pleasant View, located at 2686 North Highway 89, Pleasant View, Utah Facility Identification No. 1200559, Release Site OJN Dear Mr. Miller: On December 1, 2023, a release at the above-referenced site was reported when a Frito Lay truck operator walked away during fueling of the vehicle and an overfill of diesel fuel occurred on the asphalt and into the storm drain with reported responses from the North Ogden Fire Department, Pleasant View Police Department, and the station personnel. In accordance with Utah Petroleum Storage Tank (PST) Rule R311-202 and R311-205-2, you are required to report, control, abate, and characterize the release; define the extent and degree of petroleum contamination; evaluate the risks to human health and the environment; and remediate (cleanup) the release, as required by the Division of Environmental Response and Remediation (DERR). A Subsurface Investigation Report (SIR) must be submitted to the DERR within 90 days of your receipt of this letter. Requirements for a SIR are detailed in the Leaking Underground Storage Tank (LUST) Subsurface Investigation Report Guide dated May 2014, which can be found on the DERR’s website. In accordance with Utah PST Rule R311-207-2(2), a PST Fund Eligibility Application must be submitted before the responsible party incurs costs for which they intend to seek reimbursement from the PST Fund. A PST Fund Claims Packet is enclosed. Please submit your PST Fund Eligibility Application within 90 days to ensure that the costs you incur will be eligible for reimbursement to the greatest extent possible. Please note that the DERR may not authorize payments from the PST Fund if the claim is not filed within the time periods specified in Utah Underground Storage Tank (UST) Act Section 19-6-424(1) or if appropriate approvals for work are not timely obtained as specified in Utah UST Act Section 19-6-420. 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144840 • Salt Lake City, UT 84114-4840 Telephone (801) 536-4100 • Fax (801) 359-8853 • T.D.D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper Facility ID# 1200559 Page 2 In accordance with Utah PST Rule R311-201-2(1), all PST release management, abatement, investigation, and corrective action work must be performed by a DERR-Certified PST Consultant. In accordance with Utah PST Rule R311-207-3(7), once the responsible party's share of eligible costs has been spent in accordance with Utah UST Act Section 19-6-419, the DERR shall review and approve or disapprove work plans and the corrective action plan and all associated budgets. For costs to be covered by the PST Fund, the DERR must approve all work plans, corrective action plans, and associated budgets before a responsible party initiates any work, except as allowed by Utah UST Act Sections 19-6-420(3) and 19-6-420(6). Based on the DERR’s experience and guidelines, the cost for preparing this Work Plan for an Initial Subsurface Investigation shall not exceed $2,200.00. If you have any questions, please contact Alex Thompson, the DERR project manager, at (801) 536-4100. Sincerely, Brent H. Everett, Director Division of Environmental Response and Remediation BHE/MAT/stt Enclosures: PST Fund Claims Packet dated February 27, 2017 cc: Brian Cowan, B.S., M.P.H., Director, Weber-Morgan Health Department ?BEE ],818 BBBB 13111 ?T],], trB !, 3:I,uge EO e3;p8*s8ES trot E tl;I II? € ftr td bar5!3 ;a !,ts8 ileI? 2 Ilt ll dHfih5=*z ==u=Ar.rr-2z =ic.9Ev -l rlE'HEs{= mnl,v6m U) =o r Complete items 1, 2, and g. r Print your name and_address on the reverse so that we can return the card to you. r Attach this card to the back of the mailpiece, E Agent tr C. Date of Delivery tr PriorttyMailEQress@ tr Rssister€d Mailil tr RoElster€d Mail Resticted DEliv6ry E Retum Recelptfor Merchandise tr Slgnature Confi rmationil E Slgnature Confirmation or on the front if 1. ArticleAddressed to:Yes NoED. ls delMery address differentftom ltem 1? '- - ---, enter dellvery address below: JASON MILLER RICHARD L MILLER ENTERPRISES INC 2455 W MAIN ST TREMONTON UT 84337 ilrilil ilt llltillrllllIllI I lll ilIllI I lll trAduttSlgnatul€ tr Adult Slgnaturc Restrlcted Dellvery El-cedified Mall@ 3, ServlceType 9590 9402 6086 0125 3504 86 tr Certified Mall Restrlot€d Deliv€ry tr Ooll€cton Dellvery tr Collect on Delivery Resticted Dslivory2. Article l,lumber ?EeE l,e5E U0uu 131ll ?11'1',Eeshlcted Dellvery ffieor sFsr,r zsa0-02-ooo-e0 5s Poo ffq N L|dJlf'Zqomestic Rsturn ReceiPt ;