Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DDW-2024-006212
Re e v e & A s s o c i a t e nc . ld O n d On d On ld O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On nc . 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S ♦ CM L EN G I N E E R S ♦ LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S » LA N D S C A P E AR C H I T E C T S Project Narrative/Notes/Revisions 1. 09/11/2023 NF - COMPLETED DESIGN FOR CLIENT 8c CITY REVIEW. 2. 11/08/2023 NF - REVISED PER CITY COMMENTS. DATED: 10/26/2023. 3. 01/17/2024 NF - REVISED PER CITY COMMENTS. DATED: 11/30/2023. 750 N PROJECT SITE DELTA CROSSINGSPhase 1Improvement Plans DELTA CITY, MILLARD COUNTY, UTAH SEPTEMBER, 2023 Mo o n s t o n e Dr i v e Ha r v e s t La n e lasper ©®© To p a z Co u r t Em e r a l d Wa y Drive mountain fuel SUPPLY CO SERIAL D— 3888— 5—1 NE L S O N , BI L L J TR U S T E E SE R I A L D— 38 5 8 Vicinity Map NOT TO SCALE O-? g oro CD E E E E00 o § ° 5orME L V I L L E EA S T CA N A L MCPHERSON, ROBINS JOSEPH TRUSTEES; MCPH SERIAL D-3852-3 80 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Co v e r / l n d e x Sh e e t De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H 450 Northo Street 4? ■ ______| Scale: 1” = 80’ DELTA ESTATES Know whafs belOW. Call before you dig. Sunset StreetSheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Cover/lndex Notes/Legend/Street 5+00.00 8+75.00 ■ 14+00.00 19+00.00 5+00.00 Sheet Cross-Section 8+75.00 14+00.00 ■ 19+00.00 ■ 22+50.00 9+00.00 6+50.00 5+00.00 - 6+50.00 6+75.00 - 13+50.00 - 16+50.00 10+00.00 13+10.37 2 3 Surveyor: Jason Felt Reeve &. Associates, Inc. 5160 South 1500 West Riverdale, Utah, 84405 PH:(801) 621-3100 Landscape Architect: Nathan Peterson Reeve & Associates, Inc. 5160 South 1500 West Riverdale, Utah, 84405 PH: (801) 621-3100 Jasper Jasper Jasper Jasper Harvest Lane Moonstone Drive 5+00.00 - Emerald Way Topaz Court 5+00.00 1 Cedar Point Lane 9+00.00 Cedar Point Lane 13+50.00 Irrigation Outfall 5+00.00 - 1 Irrigation Outfall 10+00.00 * Grading & Drainage Plan * Grading & Drainage Plan (Cont.) Utility Plan Utility Plan (Cont.) * Canal Crossing Details APWA Details - APWA Details Storm Water Pollution Prevention Plan Exhibit Storm Water Pollution Prevention Plan Details Retention Basin Landscape Plan THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Drive Drive Drive Drive 5 6 8 Sheet Sheet Sheet Sheet Sheet 13 Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet 9 10 12 Phase Zoning Phase 114 15 16 Engineer's Notice To Contractors! THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED FROM AVAILABLE INFORMATION PROVIDED BY OTHERS. THE LOCATIONS SHOWN ARE APPROXIMATE AND SHALL BE CONFIRMED IN THE FIELD BY THE CONTRACTOR, SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS REQUIRED TO CONTACT THE UTILITY COMPANIES AND TAKE DUE PRECAUTIONARY MEASURE TO PROTECT ANY UTILITY LINES SHOWN, AND ANY OTHER LINES OBTAINED BY THE CONTRACTOR’S RESEARCH, AND OTHERS NOT OF RECORD OR NOT SHOWN ON THESE PLANS. Notice: THESE PLANS WERE CREATED UTILIZING COLORS FOR UTILITIES 8c OTHER INFRASTRUCTURE. IF PRINTED IN, OR COPIED TO BLACK 8c WHITE, SOME LINE WORK MAY NOT SHOW UP PROPERLY. 18 - 19 - 19.1 20 21 - 22 - i______i ___ j_ __i __________ __ __ ________ __Sheet Index Key Map NOT TO SCALE Reeve & Associates, Inc. - Solutions You Can Build On I3V5328 J. NATE REEVE Sheet Index Developer: Michael Zurn PH:(385) 205-1318 MZURN@LYNCCONSTRUCTION.COM Project Contact: Nate Reeve Reeve & Associates, Inc. 5160 South 1500 West Riverdale, Utah, 84405 PH:(801) 621-3100 y Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 Number: 8059—01 22 Total Sheets e , I n c . d O n ld On d On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S General Notes;Notice to Contractor;Legend = RIGHT-OF-WAY = STORM DRAIN = STREET LIGHT = SANITARY SEWER = TOP BACK OF CURB = TOP OF ASPHALT - TOP OF CONCRETE = TOP OF FINISHED FLOOR = TOP OF STAIRS = TOP OF WALL = TOP OF SIDEWALK = UNDERGROUND POWER = CULINARY WATER = WATER METER = EXISTING ASPHALT PAVEMENT = PROPOSED ASPHALT PAVEMENT = PROPOSED CONCRETE = PROPOSED GRAVEL = EXISTING CONTOUR GRADE = PROPOSED CONTOUR GRADE = PROPOSED RETAINING WALL THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UNDERGROUND UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON RECORDS OF THE VARIOUS UTILITY COMPANIES AND/OR MUNICIPALITIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. THE CONTRACTOR AGREES THAT THEY SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEERS HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT. 1. ALL CONSTRUCTION MUST STRICTLY FOLLOW THE STANDARDS AND SPECIFICATIONS SET FORTH BY: GOVERNING UTILITY MUNICIPALITY, GOVERNING CITY OR COUNTY (IF UN-INCORPORATED), INDIVIDUAL PRODUCT MANUFACTURERS, AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AND THE DESIGN ENGINEER. THE ORDER LISTED ABOVE IS ARRANGED BY SENIORITY. IF A CONSTRUCTION PRACTICE IS NOT SPECIFIED BY ANY OF THE LISTED SOURCES, CONTRACTOR MUST CONTACT DESIGN ENGINEER FOR DIRECTION. 2. CONTRACTOR TO STRICTLY FOLLOW GEOTECHNICAL RECOMMENDATIONS FOR THIS PROJECT. ALL GRADING INCLUDING BUT NOT LIMITED TO CUT, FILL, COMPACTION, ASPHALT SECTION, SUBBASE, TRENCH EXCAVATION/ BACK FILL, SITE GRUBBING, RETAINING WALLS AND FOOTINGS MUST BE COORDINATED DIRECTLY WITH THE PROJECT GEOTECHNICAL ENGINEER. 3. TRAFFIC CONTROL, STRIPING & SIGNAGE TO CONFORM TO CURRENT GOVERNING AGENCIES TRANSPORTATION ENGINEER’S MANUAL AND MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. 4. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT NO COST TO OWNER. 5. CONSULT ALL OF THE DRAWINGS AND SPECIFICATIONS FOR COORDINATION REQUIREMENTS BEFORE COMMENCING CONSTRUCTION. 6. AT ALL LOCATIONS WHERE EXISTING PAVEMENT ABUTS NEW CONSTRUCTION, THE EDGE OF THE EXISTING PAVEMENT SHALL BE SAWCUT TO A CLEAN, SMOOTH EDGE. 7. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE MOST RECENT, ADOPTED EDITION OF ADA ACCESSIBILITY GUIDELINES. 8. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING SURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED THOROUGHLY REVIEWED PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF THE PERMITTING AUTHORITIES. 9. CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AND NOTIFYING ENGINEER OR INSPECTING AUTHORITY 48 HOURS IN ADVANCE OF COVERING UP ANY PHASE OF CONSTRUCTION REQUIRING OBSERVATION. 10. ANY WORK IN THE PUBLIC RIGHT-OF-WAY WILL REQUIRE PERMITS FROM THE APPROPRIATE CITY, COUNTY OR STATE AGENCY CONTROLLING THE ROAD, INCLUDING OBTAINING REQUIRED INSPECTIONS. 11. ALL DIMENSIONS, GRADES & UTILITY DESIGNS SHOWN ON THE PLANS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. 12. CONTRACTOR MUST VERIFY ALL EXISTING CONDITIONS BEFORE BIDDING AND BRING UP ANY QUESTIONS BEFOREHAND. 13. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH BY THE GEOTECHNICAL ENGINEER. 14. CATCH SLOPES SHALL BE GRADED AS SPECIFIED ON GRADING PLANS. 15. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FLAGGING, CAUTION SIGNS, LIGHTS, BARRICADES, FLAGMEN, AND ALL OTHER DEVICES NECESSARY FOR PUBLIC SAFETY. 16. CONTRACTOR SHALL, AT THE TIME OF BIDDING AND THROUGHOUT THE PERIOD OF THE CONTRACT, BE LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND SHALL BE BONDABLE FOR AN AMOUNT EQUAL TO OR GREATER THAN THE AMOUNT BID AND TO DO THE TYPE OF WORK CONTEMPLATED IN THE PLANS AND SPECIFICATIONS. CONTRACTOR SHALL BE SKILLED AND REGULARLY ENGAGED IN THE GENERAL CLASS AND TYPE OF WORK CALLED FOR IN THE PLANS AND SPECIFICATIONS. 17. CONTRACTOR SHALL INSPECT THE SITE OF THE WORK PRIOR TO BIDDING TO SATISFY HIMSELF BY PERSONAL EXAMINATION OR BY SUCH OTHER MEANS AS HE MAY PREFER OF THE LOCATIONS OF THE PROPOSED WORK AND OF THE ACTUAL CONDITIONS OF AND AT THE SITE OF WORK. IF, DURING THE COURSE OF HIS EXAMINATION, A BIDDER FINDS FACTS OR CONDITIONS WHICH APPEAR TO HIM TO BE IN CONFLICT WITH THE LETTER OR SPIRIT OF THE PROJECT PLANS AND SPECIFICATIONS, HE SHALL CONTACT THE ENGINEER FOR ADDITIONAL INFORMATION AND EXPLANATION BEFORE SUBMITTING HIS BID. SUBMISSION OF A BID BY THE CONTRACTOR SHALL CONSTITUTE ACKNOWLEDGMENT THAT, IF AWARDED THE CONTRACT, HE HAS RELIED AND IS RELYING ON HIS OWN EXAMINATION OF (1) THE SITE OF THE WORK, (2) ACCESS TO THE SITE, AND (3) ALL OTHER DATA AND MATTERS REQUISITE TO THE FULFILLMENT OF THE WORK AND ON HIS OWN KNOWLEDGE OF EXISTING FACILITIES ON AND IN THE VICINITY OF THE SITE OF THE WORK TO BE CONSTRUCTED UNDER THIS CONTRACT. THE INFORMATION PROVIDED BY THE ENGINEER IS NOT INTENDED TO BE A SUBSTITUTE FOR, OR A SUPPLEMENT TO, THE INDEPENDENT VERIFICATION BY THE CONTRACTOR TO THE EXTENT SUCH INDEPENDENT INVESTIGATION OF SITE CONDITIONS IS DEEMED NECESSARY OR DESIRABLE BY THE CONTRACTOR. CONTRACTOR SHALL ACKNOWLEDGE THAT HE HAS NOT RELIED SOLELY UPON OWNER- OR ENGINEER-FURNISHED INFORMATION REGARDING SITE CONDITIONS IN PREPARING AND SUBMITTING HIS BID. 18. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL WATER, POWER, SANITARY FACILITIES AND TELEPHONE SERVICES AS REQUIRED FOR THE CONTRACTOR’S USE DURING CONSTRUCTION. 19. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE OWNER, ENGINEER, AND/OR GOVERNING AGENCIES. 20. CONTRACTOR SHALL EXERCISE DUE CAUTION AND SHALL CAREFULLY PRESERVE BENCH MARKS, CONTROL POINTS, REFERENCE POINTS AND ALL SURVEY STAKES, AND SHALL BEAR ALL EXPENSES FOR REPLACEMENT AND/OR ERRORS CAUSED BY THEIR UNNECESSARY LOSS OR DISTURBANCE. 21. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. 22. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND TESTING OF ALL FACILITIES CONSTRUCTED UNDER THIS CONTRACT. ALL TESTING SHALL CONFORM TO THE REGULATORY AGENCY’S STANDARD SPECIFICATIONS. ALL TESTING AND INSPECTION SHALL BE PAID FOR BY THE OWNER; ALL RE-TESTING AND/OR RE-INSPECTION SHALL BE PAID FOR BY THE CONTRACTOR. 23. IF EXISTING IMPROVEMENTS NEED TO BE DISTURBED AND/OR REMOVED FOR THE PROPER PLACEMENT OF IMPROVEMENTS TO BE CONSTRUCTED BY THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROM DAMAGE. COST OF REPLACING OR REPAIRING EXISTING IMPROVEMENTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEMS REQUIRING REMOVAL AND/OR REPLACEMENT. THERE WILL BE NO EXTRA COST DUE TO THE CONTRACTOR FOR REPLACING OR REPAIRING EXISTING IMPROVEMENTS. 24. WHENEVER EXISTING FACILITIES ARE REMOVED, DAMAGED, BROKEN, OR CUT IN THE INSTALLATION OF THE WORK COVERED BY THESE PLANS OR SPECIFICATIONS, SAID FACILITIES SHALL BE REPLACED AT THE CONTRACTOR’S EXPENSE WITH MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE ORIGINAL EXISTING FACILITIES. THE FINISHED PRODUCT SHALL BE SUBJECT TO THE APPROVAL OF THE OWNER, THE ENGINEER, AND THE RESPECTIVE REGULATORY AGENCY. 25. CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE AS-BUILT RECORD DRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL STRUCTURES AND OTHER FACILITIES. AS-BUILT RECORD DRAWINGS SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS, AND ADJUSTMENTS TO ALL IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE PREPARED AND SUBMITTED BY THE CONTRACTOR. PRIOR TO ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL DELIVER TO THE ENGINEER ONE SET OF NEATLY MARKED AS-BUILT RECORD DRAWINGS SHOWING THE INFORMATION REQUIRED ABOVE. AS-BUILT RECORD DRAWINGS SHALL BE REVIEWED AND THE COMPLETE AS-BUILT RECORD DRAWING SET SHALL BE CURRENT WITH ALL CHANGES AND DEVIATIONS REDLINED AS A PRECONDITION TO THE FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL ACCEPTANCE. 26. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE HIGHEST QUALITY ARE TO BE USED. 27. CONTRACTOR SHALL BE SKILLED AND REGULARLY ENGAGED IN THE GENERAL CLASS AND TYPE OF WORK CALLED FOR IN THE PROJECT PLANS AND SPECIFICATIONS. THEREFORE, THE OWNER IS RELYING UPON THE EXPERIENCE AND EXPERTISE OF THE CONTRACTOR. PRICES PROVIDED WITHIN THE CONTRACT DOCUMENTS SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED IN ACCORDANCE WITH THE TRUE INTENT AND PURPOSE OF THESE PLANS AND SPECIFICATIONS. THE CONTRACTOR SHALL BE COMPETENT, KNOWLEDGEABLE AND HAVE SPECIAL SKILLS IN THE NATURE, EXTENT AND INHERENT CONDITIONS OF THE WORK TO BE PERFORMED. CONTRACTOR SHALL ALSO ACKNOWLEDGE THAT THERE ARE CERTAIN PECULIAR AND INHERENT CONDITIONS EXISTENT IN THE CONSTRUCTION OF THE PARTICULAR FACILITIES WHICH MAY CREATE, DURING THE CONSTRUCTION PROGRAM, UNUSUAL OR UNSAFE CONDITIONS HAZARDOUS TO PERSONS, PROPERTY AND THE ENVIRONMENT. CONTRACTOR SHALL BE AWARE OF SUCH PECULIAR RISKS AND HAVE THE SKILL AND EXPERIENCE TO FORESEE AND TO ADOPT PROTECTIVE MEASURES TO ADEQUATELY AND SAFELY PERFORM THE CONSTRUCTION WORK WITH RESPECT TO SUCH HAZARDS. 28. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL STRIPING AND/OR PAVEMENT MARKINGS NECESSARY TO TIE EXISTING STRIPING INTO FUTURE STRIPING. METHOD OF REMOVAL SHALL BE BY GRINDING OR SANDBLASTING. 29. CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER PROVISIONS NECESSARY TO PROTECT WORKMEN FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 4 FEET OR MORE. FOR EXCAVATIONS 4 FEET OR MORE IN DEPTH, THE CONTRACTOR SHALL COMPLY WITH LOCAL, STATE AND NATIONAL SAFETY CODES, ORDINANCES. OR REQUIREMENTS FOR EXCAVATION AND TRENCHES. 30. ALL EXISTING GATES AND FENCES TO REMAIN UNLESS OTHERWISE NOTED ON PLANS. PROTECT ALL GATES AND FENCES FROM DAMAGE. Utility Notes; 1. CONTRACTOR SHALL COORDINATE LOCATION OF NEW ’’DRY UTILITIES” WITH THE APPROPRIATE UTILITY COMPANY, INCLUDING BUT NOT LIMITED TO: TELEPHONE SERVICE, GAS SERVICE, CABLE, POWER, INTERNET. 2. EXISTING UTILITIES HAVE BEEN SHOWN ON THE PLANS USING A COMBINATION OF ON-SITE SURVEYS (BY OTHERS). PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO HAVE EACH UTILITY COMPANY LOCATE IN THE FIELD, THEIR MAIN AND SERVICE LINES 48 HOURS IN ADVANCE OF PERFORMING ANY EXCAVATION WORK. THE CONTRACTOR SHALL RECORD THE BLUE STAKES ORDER NUMBER AND FURNISH ORDER NUMBER TO OWNER AND ENGINEER PRIOR TO ANY EXCAVATION. IT WILL BE THE CONTRACTOR’S SOLE RESPONSIBILITY TO DIRECTLY CONTACT ANY OTHER UTILITY COMPANIES THAT ARE NOT MEMBERS OF BLUE STAKES. IT SHALL BE THE CONTRACTOR’S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF THIS CONTRACT. ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BY THE CONTRACTOR. THE CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE PROJECT. 3. CONTRACTOR SHALL POT HOLE ALL UTILITIES TO DETERMINE IF CONFLICTS EXIST PRIOR TO BEGINNING ANY EXCAVATION. NOTIFY ENGINEER OF ANY CONFLICTS. CONTRACTOR SHALL VERIFY LOCATION AND INVERTS OF EXISTING UTILITIES TO WHICH NEW UTILITIES WILL BE CONNECTED. PRIOR TO COMMENCING ANY EXCAVATION WORK THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES IN ACCORDANCE WITH THE REQUIRED PROCEDURES. 4. CARE SHOULD BE TAKEN IN ALL EXCAVATIONS DUE TO POSSIBLE EXISTENCE OF UNRECORDED UTILITY LINES. EXCAVATION REQUIRED WITHIN PROXIMITY OF EXISTING UTILITY LINES SHALL BE DONE BY HAND. CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR STRUCTURES INCURRED DURING CONSTRUCTION OPERATIONS AT HIS EXPENSE. 5. ALL VALVES AND MANHOLE COVERS SHALL BE RAISED OR LOWERED TO MEET FINISHED GRADE. 6. CONTRACTOR SHALL CUT PIPES OFF FLUSH WITH THE INSIDE WALL OF THE BOX OR MANHOLE. 7. CONTRACTOR SHALL GROUT AT CONNECTION OF PIPE TO BOX WITH NON-SHRINKING GROUT, INCLUDING PIPE VOIDS LEFT BY CUTTING PROCESS, TO A SMOOTH FINISH. 8. CONTRACTOR SHALL GROUT WITH NON-SHRINK GROUT BETWEEN GRADE RINGS AND BETWEEN BOTTOM OF INLET LID FRAME AND TOP OF CONCRETE BOX 9. SILT AND DEBRIS IS TO BE CLEANED OUT OF ALL STORM DRAIN BOXES. CATCH BASINS ARE TO BE MAINTAINED IN A CLEANED CONDITION AS NEEDED UNTIL AFTER THE FINAL BOND RELEASE INSPECTION. 10. CONTRACTOR SHALL CLEAN ASPHALT, TAR OR OTHER ADHESIVES OFF OF ALL MANHOLE LIDS AND INLET GRATES TO ALLOW ACCESS. 11. EACH TRENCH SHALL BE EXCAVATED SO THAT THE PIPE CAN BE LAID TO THE ALIGNMENT AND GRADE AS REQUIRED. THE TRENCH WALL SHALL BE SO BRACED THAT THE WORKMEN MAY WORK SAFELY AND EFFICIENTLY. ALL TRENCHES SHALL BE DRAINED SO THE PIPE LAYING MAY TAKE PLACE IN DE-WATERED CONDITIONS. 12. CONTRACTOR SHALL PROVIDE AND MAINTAIN AT ALL TIMES AMPLE MEANS AND DEVICES WITH WHICH TO REMOVE PROMPTLY AND TO PROPERLY DISPOSE OF ALL WATER ENTERING THE TRENCH EXCAVATION. 13. MAINTAIN A MINIMUM 18” VERTICAL SEPARATION DISTANCE BETWEEN ALL UTILITY CROSSINGS. 14. CONTRACTOR SHALL START INSTALLATION AT LOW POINT OF ALL NEW GRAVITY UTILITY LINES. 15. ALL BOLTED FITTINGS MUST BE GREASED AND WRAPPED. 16. UNLESS SPECIFICALLY NOTED OTHERWISE, MAINTAIN AT LEAST 2 FEET OF COVER OVER ALL STORM DRAIN LINES AT ALL TIMES (INCLUDING DURING CONSTRUCTION). 17. ALL WATER LINES SHALL BE INSTALLED A MINIMUM OF 60” BELOW FINISHED GRADE. 18. ALL SEWER LINES AND SEWER SERVICES SHALL HAVE A MINIMUM SEPARATION OF 10 FEET, PIPE EDGE TO PIPE EDGE, FROM THE WATER LINES. IF A 10 FOOT SEPARATION CAN NOT BE MAINTAINED, CONTRACTOR MUST ALERT DELTA CITY. DDW MUST APPROVE MITIGATION MEASURES SPECIFIC TO EACH INSTANCE PRIOR TO PROCEEDING. 19. CONTRACTOR SHALL INSTALL THRUST BLOCKING AT ALL WATERLINE ANGLE POINTS AND TEES. 20. ALL UNDERGROUND UTILITIES SHALL BE IN PLACE PRIOR TO INSTALLATION OF CURB, GUTTER, SIDEWALK AND STREET PAVING. 21. CONTRACTOR SHALL INSTALL MAGNETIC LOCATING TAPE CONTINUOUSLY OVER ALL NONMETALLIC PIPE. 22. THRUST BLOCKS & RESTRAINED JOINTS WITH MEGA-LUG ADAPTERS REQUIRED ON ALL BENDS AND FITTINGS USING BLUE BOLTS. PROTECT ALL BOLTS FROM BEING ENCASED IN CONCRETE. INSTALL PER MANUFACTURER RECOMMENDATIONS. = PROPOSED WATER METER ' vv SD= EXISTING WATER METER SL = PROPOSED REDUCER ss = EXISTING REDUCER TBC = PROPOSED SECONDARY WATER LATERAL = PROPOSED LAND DRAIN LATERALLDLAT = PROPOSED WATER LATERALwLAT- = PROPOSED SEWER LATERAL TOA TOC TOFF TOS TOW TSW UGP W WM PROPOSED CULINARY WATER LINE = PROPOSED CATCH BASIN = EXISTING CATCH BASIN = PLUG W/ 2” BLOW-OFF = STREET LIGHT = SIGN - POWER POLE = BASEMENT FLOOR ELEVATION = BUILDING = BOTTOM OF STAIRS = BOTTOM OF WALL = BEGINNING POINT = CURB <& GUTTER = CATCH BASIN = CUBIC FEET = CUBIC FEET PER SECOND = EDGE OF PAVEMENT = FINISH FLOOR = FINISH FLOOR ELEVATION = FINISHED GRADE EXISTING CULINARY WATER LINE NOTE: 1. SAWCUT EXISTING ASPHALT INSIDE FROM OUTER EDGE FOR TACK SEAL OF NEW ASPHALT 2. CONTRACTOR TO VERIFY 2% MIN. AND 5% MAX SLOPE FROM EDGE OF ASPHALT TO LIP OF GUTTER -SW/8-PROPOSED SECONDARY WATER LINE EXISTING SECONDARY WATER LINE-------- EX.SW -------- PROPOSED SANITARY SEWER LINESurvey Control Notes THE CONTRACTOR OR SURVEYOR SHALL BE RESPONSIBLE FOR FOLLOWING THE NATIONAL SOCIETY OF PROFESSIONAL SURVEYORS (NSPS) MODEL STANDARDS FOR ANY SURVEYING OR CONSTRUCTION LAYOUT TO BE COMPLETED USING REEVE & ASSOCIATES, INC. SURVEY DATA OR CONSTRUCTION IMPROVEMENT PLANS. PRIOR TO PROCEEDING WITH CONSTRUCTION STAKING, THE SURVEYOR SHALL BE RESPONSIBLE FOR VERIFYING HORIZONTAL CONTROL FROM THE SURVEY MONUMENTS AND FOR VERIFYING ANY ADDITIONAL CONTROL POINTS SHOWN ON AN ALTA SURVEY, IMPROVEMENT PLAN, OR ANY ELECTRONIC DATA PROVIDED. THE SURVEYOR SHALL ALSO USE THE BENCHMARKS AS SHOWN ON THE PLAN, AND VERIFY THEM AGAINST NO LESS THAN FIVE (5) EXISTING HARD IMPROVEMENT ELEVATIONS INCLUDED ON THESE PLANS OR ON ELECTRONIC DATA PROVIDED. IF ANY DISCREPANCIES ARE ENCOUNTERED, THE SURVEYOR SHALL IMMEDIATELY NOTIFY REEVE & ASSOCIATES, INC. AND RESOLVE THE DISCREPANCIES BEFORE PROCEEDING WITH ANY CONSTRUCTION STAKING. -------- EX.SS --------EXISTING SANITARY SEWER LINE -SD/1&PROPOSED STORM DRAIN LINE BFE -------- EX.SD --------EXISTING STORM DRAIN LINE 4800 BLDG i_D/a PROPOSED LAND DRAIN LINE BOS EXISTING LAND DRAIN LINE-------- EX.LD --------BOW BP1RR/1&PROPOSED IRRIGATION LINE O&G-------EX.IRR -------EXISTING IRRIGATION LINE OBErosion Control General Notes; THE CONTRACTOR TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING EROSION CONTROL FOR CONSTRUCTION OF THIS PROJECT. ALL MATERIAL AND WORKMANSHIP SHALL CONFORM TO GOVERNING AGENCIES ORDINANCES AND ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE COUNTIES. ALSO, INSPECTORS WILL HAVE THE RIGHT TO CHANGE THE FACILITIES AS NEEDED. CONTRACTOR SHALL KEEP THE SITE WATERED TO CONTROL DUST. CONTRACTOR TO LOCATE A NEARBY HYDRANT FOR USE AND TO INSTALL TEMPORARY METER. CONSTRUCTION WATER COST TO BE INCLUDED IN BID. WHEN GRADING OPERATIONS ARE COMPLETED AND THE DISTURBED GROUND IS LEFT OPEN FOR 14 DAYS OR MORE, THE AREA SHALL BE FURROWED PARALLEL TO THE CONTOURS. THE CONTRACTOR SHALL MODIFY EROSION CONTROL MEASURES TO ACCOMMODATE PROJECT PLANNING. ALL ACCESS TO PROPERTY WILL BE FROM PUBLIC RIGHT-OF-WAYS. THE CONTRACTOR IS REQUIRED BY STATE AND FEDERAL REGULATIONS TO PREPARE A STORM WATER POLLUTION PREVENTION PLAN AND FILE A ’’NOTICE OF INTENT” WITH THE GOVERNING AGENCIES. EXISTING FENCE LINEX ------X ------X OF RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s CFSO PROPOSED FENCE LINE EP ---- = DRAINAGE SWALE FF 4800 FFE= OVERHEAD POWER LINEOHP FG= PROPOSED FIRE HYDRANT FH = FIRE HYDRANT = FLOW LINE= EXISTING FIRE HYDRANT FL = PROPOSED MANHOLE = GRADE BREAKGB = GARAGE FLOOR ELEVATION = INVERT = LINEAR FEET = NATURAL GRADE = OVERHEAD POWER = POINT OF CURVATURE = POWER/UTILITY POLE = POINT OF RETURN CURVATURE = POINT OF TANGENCY = PUBLIC UTILITY EASEMENT = REINFORCED CONCRETE PIPE = RIM OF MANHOLE GFE= EXISTING MANHOLE INV= PROPOSED SEWER CLEAN-OUT LF = PROPOSED GATE VALVE NG X = EXISTING GATE VALVE OHP PC= PLUG & BLOCKMaintenance; ALL BEST MANAGEMENT PRACTICES (BMP’S) SHOWN ON THIS PLAN MUST BE MAINTAINED AT ALL TIMES UNTIL PROJECT CLOSE-OUT. THE CONTRACTOR’S RESPONSIBILITY SHALL INCLUDE MAKING BI-WEEKLY CHECKS ON ALL EROSION CONTROL MEASURES TO DETERMINE IF REPAIR OR SEDIMENT REMOVAL IS NECESSARY. CHECKS SHALL BE DOCUMENTED AND COPIES OF THE INSPECTIONS KEPT ON SITE. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RAINFALL. THEY MUST BE REMOVED WHEN THE LEVEL OF DEPOSITION REACHES APPROXIMATELY ONE-HALF THE HEIGHT OF BARRIER. Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On PP Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On = AIR VAC ASSEMBLY PRC PT= DUAL SECONDARY METER PUE De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H No t e s / L e g e n d / St r e e t Cr o s s - S e c t i o n RCP RIM SEDIMENT TRACKED ONTO PAVED ROADS MUST BE CLEANED UP AS SOON AS PRACTICAL, BUT IN NO CASE LATER THAN THE END OF THE NORMAL WORK DAY. THE CLEAN UP WILL INCLUDE SWEEPING OF THE TRACKED MATERIAL, PICKING IT UP, AND DEPOSITING IT TO A CONTAINED AREA. EXPOSED SLOPES: ANY EXPOSED SLOPE THAT WILL REMAIN UNTOUCHED FOR LONGER THAN 14 DAYS MUST BE STABILIZED BY ONE OR MORE OF THE FOLLOWING METHODS: A) SPRAYING DISTURBED AREAS WITH A TACKIFIER VIA HYDROSEED B) TRACKING STRAW PERPENDICULAR TO SLOPES C) INSTALLING A LIGHT-WEIGHT, TEMPORARY EROSION CONTROL BLANKET R. O . W . LI N E 30’— 0” CENTER LINE 20’— 0”CURB LINE CURB LINE R. O . W . 20’— 0” 2’ — 6” 17’-6”4’— 0” 6’— 0” > ------- SLOPE = 2.0% MIN.SLOPE = 2.0% MIN. -------— 4” GRAVEL— BASE COURSE 4” GRAVEL BASE COURSE 3” PLANT MIX 8 CRUSHED GRAVEL BASE COURSE 6” WIDE 4” MONOLITHIC TALL- CURB 4” HIGH CURB TRUNCATED DOMES CU L I N A R Y WA T E R SA N I T A R Y SE W E R ST O R M DR A I N 4” HIGH CURB NO LIP AT CURB CUT OR GUTTER Street Section (60 r R,0,W,) SCALE: NONE 375328 NATE REEVE CXI 18” 2’— 0” S lope__ -4-ADA Ramp Detail (Type C) SCALE: NONE Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 3” THICK UNTREATED BASE COURSE4” THICK CRUSHED AGGREGATE BASE7-3/4”1 1 0— 1 /4” 30* Mountable Curb & Gutter SCALE: NONE On-Site r L r Curb & Gutter SCALE: NONE Number: 8059—01 2 22 Total SheetsTHESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build On Re e v e nc . d O n ld On ld On ld O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S ♦ CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S & As s o c i a t e s , In c . 6+ 0 0 . 0 0 78 . 5 1 TB C LOT IM 7+ 5 0 . 0 0 7, 7 . 7 9 TB C T8 + 1 6 . 6 7 \ " TB C / P T 7+ 3 7 2? x _ 77 / 7 3 ~ T b I C / P C 8+ 3 5 - 6 1 __ _ _ _ _ 78 . 0 2 TB C / L O T (7 4 . 0 2 ) NG 5+ 5 5 . 3 8 1 78 . 9 6 TB C / L O T I (7 4 . 9 0 ) NG i 6+ 5 0 . 0 0 1 78 . 0 1 TB C I I "6 + 5 8 . 3 0 77 . 9 3 TB C / P T CONTRACTOR MUST FIELD LOCATE EXISTING UTILITIES LOCATED IN 450 NORTH STREET LINE PRIOR TO CONSTRUCTION. COORDINATE WITH E.O.R. UPON LOCATING UTILITIES. * .» 4+ 5 0 . 0 0 78 . 8 7 TB C 8+ 0 0 . 0 0 78 . 0 4 TB C 8+ 5 0 . 0 0 77 . 9 5 TB C 79 . 1 9 TB C 4+ 0 0 . 0 0 76 . 8 5 TB C 74 . 2 5 TB C 4+ 9 9 . 9 9 3+ 5 0 . 0 0 SEE SHEET 7 FOR MORE DETAILi 10 . 0 0 ’ P. U . E . —EX. MH -------------------------------- CONTRACTOR TO FIELD VERIFY, COORDINATE WITH CITY UTILITIES 8c BLOCK 4+00,3+00 EX.PP TO BE REMOVED 7+ 0 7 J 21 ” HD P E SD 76 . 5 X TB C / P R C 7+ 4 1 96 1 -< " '7 7 . 7 5 TB C / P T 7+ 5 0 . 0 0 1 - ~ 77 . 7 9 T C 7+ 2 9 . 6 , 8 Ex.OHPEX.OHP IRR/30 IR ?/3030 I I __ _ _ _ _ _ _ SE E SH E E T 4 FO R MO R E DE T A I L EXISTING WATER MANHOLE TO BE REMOVED 6+00 CONNECT TO EXISTING (FIELD VERIFY DEPTH & LOCATION) EX.PP 8c GUY WIRES TO BE REMOVED 5+00 PROPOSED PRECAST ' 8’X6’ BOX CULVERT SEE SHEET 18 FOR DETAILS 4+ 9 9 . 9 9 /A 'v 450 North IRR/30 Y -6 + 5 0 . 0 0 1 r TW 7 8 . 0 1 TB C I —?/ / ]6 + 6 0 . 2 9 ] TB C / P C 7+ 4 1 . 6 8 78 . 9 6 TB C / L O T (7 2 . 7 1 ) NG I _EXIST]NG_PVERHEAD_ POWER TO BE REMOVED AND REROUTED UNDERGROUND (COORDINATE WITH POWER COMPANY)6+ O O . O Q i 78 . 5 1 TB C EX. MH IRR/30 IRR/30 8+ 0 0 . OO i 78 . 0 4 TB C C, TO BE REMOVED AND REROUTED UNDERGROUND (COORDINATE WITH? POWER COMPANY)8+ 5 0 . 0 0 ] z i 77 . 9 5 TB C 79 . 0 1 TB C 5+ 5 4 63 __ _ _ _ _ 79 . 2 6 TB C 79 . 1 9 TB C CONTRACTOR TO FIELD VERIFY, COORDINATE WITH CITY UTILITIES 3+ 1 1 . 3 1 74 . 2 5 TB C 4+ 0 0 . 0 0 76 . 8 5 TB C 3+ 5 0 . 0 0 74 . 8 7 TB C r ( JR R M H # 1 .. \ 5+ 3 3 . 4 6 ) RE V I S I O N S DA T E DE S C R I P T I O N 1 1 —0 8 — 2 3 NF Ci t y Co m m e n t s 01 — 1 7 — 2 4 NF Ci t y Co m m e n t s Construction Notess 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE Key Map NOT TO SCALEJasper Drive 5+00.00 - 8+75.00 NOTES: 1. CONTRACTOR MUST POT HOLE & LOCATED WATER LINE ON EACH SIDE OF CANAL PRIOR TO CONSTRUCTION. 2. CONTRACTOR TO FIELD VERIFY DEPTHS & SIZING OF EXISTING WATER LINE PRIOR TO CONSTRUCTION. 3. CONTRACTOR MUST FIELD VERIFY LOCATION OF EXISTING SEWER. 4. CONTRACTOR MUST TERMINATE SEWER ON THE WEST SIDE OF PROPOSED BRIDGE LOCATION. 20 0 20 40 60 Horizontal Scale: 1” = 20’ Vertical Scale: 1 ” = 2’ TBC Curve Data #Delta Radius Length Tangent Chord CH Length C1 83’10’38”20.00’29.03’17.75’N47°59’29”W 26.55’ C6 100’14’45”20.00’34.99’23.94’S41’24’55”W 30.70’ C19 89’30’31”20.00’31.24’19.83’S43’42’27”E 28.16’ C20 89’22’24”20.00’31.20’19.78’N45’44’00”E 28.13’ Ja s p e r Dr i v e 5+ 0 0 . 0 0 - 8+ 7 5 . 0 0 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H STORM DRAIN SD/12 - 12”HDPE STORM DRAIN SD/15 - 15”HDPE STORM DRAIN SD/18 - 18”HDPE STORM DRAIN SD/21 - 21”HDPE STORM DRAIN SD/24 - 24”HDPE STORM DRAIN7+00 SD/30 - 30”HDPE STORM DRAIN3+00 4582 4+00 5+00 6+,00 8+00 8+75 4582 4+ 9 0 . 5 45 7 9 . 1 : 45 7 9 . 1 6 _ FG IRRIGATION IRR/30 - 30” 45 7 8 . 2 6 FG i 45 7 8 . 0 9 FG 4+ 4 5 . 6 6 PV ” 45 7 8 . 8 9 EL b o CLASS III STORM DRAIN 45 7 8 . 9 8 6+ 9 7 . 8 8 45 7 7 . 5 1 FG 4+ 3 1 . 5 9 BV C 4580 4580 45 7 7 . 9 8 FG 45 7 7 . 9 2 FG45 7 8 . 0 ! 45 7 6 . 8 3 S=0.50%4578 FG 4578PRO. GRADE © PROPOSED PRECAST 8’X6’ BOX CULVERT PIPE CROSSING SHOWN EXISTING HIGH WATER EXISTING WATER ELEV. 3+ 1 1 . 3 1 45 7 4 . 2 3 FG EX. GRADE © £ 45 7 4 . 8 4 FG4576 4576 LV-A—4574 457468.30* V.C. K- 17.00 3+12.20 BVC 4574.23 FG 3+80.50 EVC 4575.95 FG 3+46.35 PVI 4574.41 EL n VkV ITO328 J. WE REEVE 4572 4572 PIPE CROSSING (SEE SHEET 7 FOR MORE DETAIL)4570 4570CONNECT TO EXISTING (FIELD VERIFY DEPTH 8c LOCATION) 4568 4568 Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 4566 4566PIPE CROSSING (SEE SHEET J FOR MORE DETAIL) 4564 4564 IR R M H # 1 5+ 3 3 . 4 6 5’ 0 I R R M H -- - - - - - - - - 45 7 9 . 3 2 RI M 45 7 3 . 2 8 IN V N 45 7 3 . 2 8 IN V E SD M H # 2 7+ 1 6 . 5 2 5’ 0 S D M H -- - - - - - - - - - 45 7 7 . 0 4 RI M 45 6 9 . 2 3 IN V N 45 6 9 . 2 3 IN V S 45 6 9 . 2 3 IN V E Number: 8059—01 SS M H # 3 7+ 0 7 . 9 3 5’ 0 S S M H 45 7 7 . 3 7 45 6 5 . 2 3 45 6 5 . 2 3 45 6 5 . 0 3 3 22 Total Sheets 4562 3+00 4562 8+754+00 6+00 7+00 8+00 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build Or e , I n c . ld O n u n ld On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , 1 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S » CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S Key Map NOT TO SCALE 13 + 6 8 . 4 1 \ \ 77 . 4 7 TB C / P T OLdO6 ,0 0 Ot 5+ 7 0 . 3 5 76 . 5 2 TB C / P C 9+ 0 0 , 0 0 > 77 . 7 0 TB C | 5+ 6 9 . 6 6 76 . 5 3 TB C / P T - 10 + 1 3 J3 _ 77 . 3 4 TB C / P C 1 1+ 1 1. 6 ? 77 . 7 5 TB C / L O T (7 4 . 7 1 ) NG 5+ 6 9 . 6 6 76 . 2 6 TB C / P T 12 + 8 9 . 5 4 __ _ _ 77 . 0 7 TB C / P C a. 1_ 2 + Q 9 ± 54 _ _ _ 77 . 2 6 TB C / P T 5+ 7 0 . 3 5 76 . 2 5 TB C / P C 77 . 7 8 TB C 1 1 +5 0 . 0 0 77 . 5 5 TB C 10 + 5 0 . 0 0 1 h 2+ 0 0 . 0 0 | 77 . 3 0 TB C 13 + 0 0 . 0 0 SEE SHEET 8 FOR MORE DETAIL SEE SHEET 8 FOR MORE DETAIL 10 00 -------- EX.OHP HD P E SD PV C SS >SL 12+00 EX.OHPEX.OHP SE E SH E E T 3 FO R MO R E DE T A I L Construction Notesi 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE STORM DRAIN SD/12 - 12” HDPE STORM DRAIN SD/15 - 15” HDPE STORM DRAIN SD/18 - 18” HDPE STORM DRAIN SD/21 - 21” HDPE STORM DRAIN SD/24 - 24” HDPE STORM DRAIN SD/30 - 30” HDPE STORM DRAIN IRRIGATION IRR/30 - 30” CLASS III STORM DRAIN ,0 0 0 9 9+00 S/&X.WR- _ 11 00 EX.OHP --------------- ■EX-tOHP- -r. EX.OHP -■+ (E£E IRR/30—1 Oro(TQ£ to iu GJ 10 + 5 0 . 0 0 77 . 5 3 TB ( t 1 1 +5 0 . 0 0 I 77 . 5 5 TB ( p 1 1 +0 0 . 0 0 I 77 . 7 8 TB ( ! '/ IRR/30 BZ fox, r®Ro> T _L- oro£ a GJ O 3f $ p . 0 0 IRR/30-------1 IRR/3® —--------- RR/3 ) 9+ O O . O q I ! 77 . 7 0 T G ZU o oa? 'A \ | cl 0 IRR/30 ------------ IRR/3g- ---------- IRR/30 IRR/30 RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 — 2 4 NF Ci t y Co m m e n t s De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H Ja s p e r Dr i v e 8+ 7 5 . 0 0 - 14 + 0 0 . 0 0 IRR/30 ------------ IRR/30— 9+ 5 0 . 00 j 77 . 4 5 Tl / IR R M H # 2 9+ 5 1 . 4 8 13 + Q O . O O l 77 . 1 2 TB ( p I ' 1/ 1 0 . 0 0 ’ z P. U . E . ' J 00 ’ 3 6 + 6 Al Y s# a o ■ 1 96 ’ 2 9 + 6 -- - - q t# H I A | S S 12 + 5 0 , 0 0 | 77 . 0 5 TB < ! SS M H # 5 J 12 + 5 9 . 9 7 | 12 + 6 8 . 0 4 1 I I /' 6 30” HDPE SD S=3.85% 50 L.F. 4566.00 INV TBC Curve Data #Delta Radius Length Tangent Chord CH Length C17 89’30’31”20.00’31.24’19.83’S43’42’27”E 28.16’ C18 90’29’29”20.00’31.59’20.17’N46’17’33”E 28.41’ C21 89’30’31”20.00’31.24’19.83’S43’42’27”E 28.16’ C22 90’29’29”20.00’31.59’20.17’N46’17’33”E 28.41’ Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On14+00.00 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Jasper Drive 8+75.00 - 60402020 Horizontal Scale: 1” = 20’ Vertical Scale: 1” = 2’ 14+00 458215+0012+0011+0010+009+008+75 4582 CB # 6 12 + 6 8 . 0 4 45 7 6 . 4 6 GR A T E 45 6 8 . 1 3 IN V W 45 6 9 . 1 3 IN V N 45 6 8 . 1 3 IN V E 45 7 7 . 7 5 __ _ _ _ I FG 11 + 0 2 . 7 3 45 7 7 . 7 7 FG S=0.50%S=0.50%- °- 50% PRO. GRADE @3=0.50%S=0.50% © -----Or / SS M H # 6 13 + 6 8 . 4 1 4’ 0 S S M H 45 7 7 . 2 4 RI M 45 6 8 . 0 8 IN V E 45 6 7 . 8 8 IN V W IR R M H # 3 13 + 7 9 . 0 5 5’ 0 I R R M H 45 7 7 . 6 7 RI M 45 7 2 . 4 3 IN V W 45 7 2 . 4 3 IN V E FG IR R M H # 2 X 9+ 5 1 . 4 8 5’ 0 I R R M H 45 7 7 . 5 8 RI M 45 7 2 . 8 6 IN V W 45 7 2 . 8 6 IN V E 9+ 7 3 . 8 7 45 7 7 . 3 0 FG 9+ 9 2 . 0 0 45 7 7 . 2 1 FG 45 7 7 . 2 5 12 + 6 8 . 0 4 45 7 6 . 9 4 FG 4580 45 7 7 . 6 0 4580 45 7 7 . 5 3 45 7 7 . 3 5 FG 45 7 7 . 2 8 45 7 7 . 1 0 FG 45 7 7 . 0 3 FG FG FG 45784578PRO. 45764576 4574 W/8 W/8 W/8 -W/8 w/8 W/8 W/8 W/8 W/8 W|/8 PIPE CROSSING (SEE SHEET 8 FOR MORE DETAIL) 30 HDPE SD S=0.20% 276 L.F. 30” HDPE SD S=0.20% 98 L.F. PVC"?SS S=u.a4% 108 L.F. PIPE CROSSING (SEE SHEET 8 FOR MORE DETAIL) 8” PVC SS S=0.34% 276 L.F. PIPE CROSSING (SEE SHEET 8 FOR MORE DETAIL) . m5328 J. (NOTE REEVE W/8 — ZZ!=J w y 8 -------------------45724572/V/8 /V/8 30” HDPE SD S=3.85% 50 L.F. 4566.00 INV TO BASIN 45704570 21” HDPE SD S=0.20% 275 L.F. PIPE CROSSING (SEE SHEET 8 FOR MORE DETAIL) 45684568 Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 45664566 45644564 CB # 5 9+ 9 2 . 0 0 __ _ _ _ _ _ 45 7 6 . 7 4 GR A T E 45 6 8 . 6 8 IN V W 45 6 9 . 1 8 IN V N 45 6 8 . 6 8 IN V E SS M H # 4 9+ 8 3 . 9 6 5’ 0 S S M H 45 7 7 . 0 5 RI M 45 6 6 . 3 7 IN V N 45 6 6 . 3 7 IN V E 45 6 6 . 1 7 IN V W 4562 8+75 9+00 10+00 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, SS M H # 5 12 + 5 9 . 9 7 5’ 0 S S M H 45 7 6 . 7 8 RI M 45 6 7 . 5 1 IN V N 45 6 7 . 5 1 IN V E 45 6 7 . 3 1 IN V W SS M H # 6 13 + 6 8 . 4 1 4’ 0 S S M H 45 7 7 . 2 4 RI M 45 6 8 . 0 8 IN V E 45 6 7 . 8 8 IN V W Number: 8059—01Know what’s belOW. Call before you dig. 4562 14+0015+0012+0011+00 22 Total Sheets UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT.Reeve & Associates, - Solutions You Can Build e , I n c . ld O n ld On ld On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S Key Map NOT TO SCALE<bP>’ < T“ 1 ~ I ri Z X 7 r «' • / / Z\ 1 I / I 15 + 9 2 . 2 5 76 . 9 3 Z TB C / P T 5+ 7 0 00 ' 76 . 3 3 TB C / P C □III / CB # 4 2 15 + 0 0 . 0 3 |2hl Ld Ld ZE CT ) CO /7 / &' %' / + i , ' • < ' ) z/ 4 \ " ' 7 / \, *1 5 d - 9 3 . 9 2 / \ 76 . 9 3 TB C / P t $ & if ; fc i y \W • iL W U' W 6+ 0 0 . 0 0 6. 9 0 TB C /' ¥ = / k /X / p iy y ,Xj z i/ ~ ~7 ) 00 O I-Ld hl Ld Ld ZE CD in ' W5 + 7 0 . 0 0 -7 6 . 3 4 TB C / P T _1 6+ 7 2 . 4 8 F - 76 . 7 5 TB C / P C i8 4 o o . q o i I 17 + 0 0 . 0 0 76 . 8 9 TB C I M — Irni i 17 50 . 0 0 ! SEE SHEET 9 FOR MORE DETAIL Construction Notesa 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL 8” PV C SS £= 0 . 3 4 % 11 7 _ L . F . AIR VAC ADDED AT H( POINT ON WATE3 MAIN 19-jFOO18-jFOO17-jFOO ££PIPE CROSSING (SEE SHEET 9_FOR MORE DETAIL)£21 ” HD P E SD S= 0 . 4 C % 12 9 L. F . SE E SH E E T 6 FO R MO R E DE T A I L RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s ££ W i LA T 18 + b b . o o l 19 + 0 0 . 0 0 18 + $ | 0 . 0 0 76 . 9 7 TB 18 + 5 SS M | SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE STORM DRAIN SD/12 -12”HDPE STORM DRAIN SD/15 -15”HDPE STORM DRAIN SD/18 -18”HDPE STORM DRAIN SD/21 -21”HDPE STORM DRAIN SD/24 -24”HDPE STORM DRAIN SD/30 -30”HDPE STORM DRAIN IRRIGATION TBC Curve Data Centerline Curve Data #Delta Radius Length Tangent Chord CH Length #Delta Radius Length Tangent Chord CH Length C7 43’04’11”320.00’240.55’126.28’N70’00’11”E 234.92’01 43’04’11”300.00’225.51’118.38’N70’00’11”E 220.24’ 014 90’00’00”20.00’31.42’20.00’S86’31’54”E 28.28’ C15 90’19’05”20.00’31.53’20.11’N3’37’38”E 28.36’ C16 42’45’06”280.00’208.92’109.59’N70’09’44”E 204.11’ IRR/30 - 30” CLASS III STORM DRAIN Ja s p e r Dr i v e 14 + 0 0 . 0 0 - 19 + 0 0 . 0 0 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d OnJasper Drive 14+00.00 - 19+00.00 20 20 40 60 Horizontal Scale: 1 ” = 20’ Vertical Scale: 1” = 2’ De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H 14+00 15+00 16+00 17 + 00 18+00 19+00 458200 16 + 5 0 . 9 8 45 7 6 . 6 2 FG S=0.50% PRO. GRADE @ PRO. GRADE @S=0.50% gR di /■ —SEE SHEET 12 FOR CONTINUATION PIPE CROSSING (SEE SHEET 9 FOR MORE DETAIL) ------- W ■ - 30” RCP iRR S==0.10% 305 L.F.— W/8 W/tW/8W/8 W/8 W/8 18 ” HDPE SD S=o.65% 504 L.F. W/8 W/8 — W/8 2 4” HDPE SD S=0.40% 156 L.F.-gr-PVC~~S'S~~ 0-34% 215 L.F. U _____ 8” PVC SS 8=0.34% 155 L.F. 8” PVC SS S=0.34% 125 L.F.& & £>•4 PIPE CROSSING 9 FOR MORE DETAIL)(SEE SHEET 4566.00 INV TO BASIN 4580 45 7 7 . 6 0 4578 4576 4574 , i 375328 J. Wate reeve 4572 4570 4568 Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 4566 4564 4564 SS M H # 7 14 + 8 9 . 9 1 4’ 0 S S M H 45 7 7 . 1 8 RI M 45 6 8 . 7 1 IN V NE 45 6 8 . 5 1 IN V W CB # 4 2 15 + 0 0 . 0 3 45 7 6 . 9 0 GR A T E 45 6 8 . 9 3 IN V NE 45 6 8 . 9 3 IN V S 45 7 6 . 3 9 GR A T E 45 7 0 . 5 5 IN V NW 45 6 9 . 8 0 IN V NE 45 6 9 . 5 5 IN V SW SS M H # 8 1 6+ 4 2 . 4 8 5’ 0 S S M H __ _ _ _ _ _ _ 45 7 6 . 4 6 RI M 45 6 9 . 4 4 IN V NW 45 6 9 . 4 4 IN V NE 45 6 9 . 2 4 IN V SW CB # 3 1 16 + 5 0 . 9 8 Number: 8059—01Know whafs bdOW. Call before you dig.5 22 Total Sheets 4562 14+00 4562 19+0015+00 16+00 17+00 18+00 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build On e , I n c . ld O n ld On ld On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S Key Map NOT TO SCALE SEE SHEET 10 FOR MORE DETAIL -K I I M -- - - - - - - - - ! 21 +0 0 . 0 0 I 78 . 4 5 TB C 10 + 0 0 to 40 . ,0 0 ’ 21+00 •U B # 3 4 / 01 4 - 8 0 . 3 7 -- - - - - H6 ± 6 u _ - tt a T t b c / p R 0 SS M H # 1 1 21 + 8 2 . 9 9 STUB & BLOCK 4568.52 INV/STUB 19 + O O . Q O l 77 72 TB ( p I |2 0 t - 5 0 . 0 0 | I 20 + O Q . O Q i F 78 . 2 2 TB C Construction Notesa 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE \t o i _ A t ■iv n to to L A t to 19 00 20+00 £ £ SE E SH E E T 5 FO R MO R E DE T A I L FU T U R E PH A S E •w WJ SD M H # 5 21 + 5 4 . 4 9 |S S M H # 1 0 i2 1 + 3 1 . i > 7 78 . 2 9 TB C / P T CB # 3 7 22 + 1 4 . 9 9 10 + 7 6 . 8 4 V 77 . 8 8 TB C / P C 22 + 1 2 . 9 9 TB ( p 21 + 3 2 . 9 9 1 (/ > l o Lx J 2 UJ QZ CO £Fi l m u 3 10 + 7 6 . 8 4 RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s i' I 19 + 5 0 . 0 0 1 | 77 . 9 7 Tf B t p )B L ZL ' L L W’ 0 0 + 6 1 . STORM DRAIN SD/12 -12”HDPE STORM DRAIN SD/15 -15”HDPE STORM DRAIN SD/18 -18”HDPE STORM DRAIN SD/21 -21”HDPE STORM DRAIN SD/24 -24”HDPE STORM DRAIN SD/30 -30”HDPE STORM DRAIN IRRIGATIONTBC Curve Data #Delta Radius Length Tangent Chord CH Length 08 89’59’47”20.00’31.41’20.00’N86’32’01”W 28.28’ C11 90’00’13”20.00’31.42’20.00’S3°27’59”W 28.29’ 012 85’06’04”20.00’29.71’18.36’S88’58’52”E 27.05’ 013 96’34’23”20.00’33.71’22.44’N0’10’54”E 29.86’ 22+00 — 22+50 ----- 4584 Ja s p e r Dr i v e 19 + 0 0 . 0 0 - 22 + 5 0 . 0 0 IRR/30 - 30” CLASS III STORM DRAIN Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d OnJasper Drive 19+00.00 - 22+50.00 20 20 40 60 Horizontal Scale: 1 ” = 20’ Vertical Scale: 1” = 2’ De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H 19 + 00 4584 ----- 20+00 21+00 4582 4580 )E @ Q. 4578 £ © (£ 4576 4574 & BLOCK 4572 45 7 8 . 6 4 FG 45 7 8 . 6 1 FG 20 + 5 6 . 4 3 21 +7 2 . 9 9 45 7 8 . 0 6 FG CB # 3 3 21 + 5 0 . 7 8 45 7 6 . 8 5 GR A T E 45 7 3 . 3 7 IN V CB # 3 4 21 + 8 9 . 3 7 45 7 6 . 9 0 GR A T E 45 7 3 . 5 2 IN V 45 7 8 . 4 5 DJ zt W 45 7 8 . 3 6 FG 45 7 8 . 2 0 45 7 8 . 1 1 FG S=0.50%PRO.S=0.50%S=0 50%PRO. GRADE © EX. 15” HDPE SD __ S=0.40% 37 L.F. PIPE CROSSING (SEE SHEET 10 FOR MORE DETAIL) NOTE FOR CB#33 & CB#34: VIEWS FOR STRUCTURES ARE OFFSET FROM CENTERLINE OF JASPER DRIVE 15” HDPE SD S=0.64% 61 L.P. AAf/8-W/8 PLUG , i 375328 J. Wate reeve 4570 4570 Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 PIPE CROSSING (SEE SHEET 10 r 0R MORE DETAIL) 8” PVC SS S=0.34% 35 L.F. 4568 4568 4568.64 INV STUB & CAP 4566 4566 SD M H # 5 21 + 5 4 . 4 9 5’ 0 S D M I I -- - - - - - - - - - - - 45 7 7 . 8 3 RI M 45 7 3 . 0 9 IN V NW 45 7 3 . 0 9 IN V NE 45 7 3 . 0 9 IN V SW SS M H # 1 0 21 + 3 1 . 6 7 4’ 0 S S M H 45 7 8 . 0 7 RI M 45 7 1 . 3 0 IN V SW CB # 3 7 22 + 1 4 . 9 9 45 7 7 . 8 0 GR A T E 45 7 3 . 4 8 IN V NE 45 7 3 . 4 8 IN V SW SS M H # 1 1 21 + 8 2 . 9 9 5’ 0 S S M H 45 7 7 . 9 4 RI M 45 6 8 . 5 2 IN V NE 45 6 8 . 3 2 IN V SE Number: 8059—01 6 22 Total Sheets 4564 19+00 4564 22+5020+00 21+00 22+00 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build On Re e v e nc . d O n ld On ld On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S & As s o c i a t e s , In c . 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S Key Map NOT TO SCALE 8+ 5 0 . 0 0 76 . 0 8 TB C fO 00inCD CH SEE sheet 3 FOR MORE DETAIL 7 to co S'jlj '.i'.' \ uTVtI 'W >7' '■'Vy. V,.v> ‘ ■ ■ — A° n ino> in STUB 8c BLOCK 10 00 in CDin STUB 8c CAP CDcnCN r . - EX.W 6*0°s morTdctail in o 5+0I coco CONNECT TO EXISTING (FIELD VERIFY DEPT/ & LOCATION) 8 PVC S8>V~ S=0.34% 30 L.F. 4564.30 INV oo inCXI in inW.cnCD 9 IO LlI(/) XCL I y LlI 4565 3 INV or ST B &CAP Z) g 569.36 INV Construction Notes; 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s RE V I S I O N S TBC Curve Data Centerline Curve Data #Delta Radius Length Tangent Chord CH Length #Delta Radius Length Tangent Chord CH Length C1 83° 10’38”20.00’29.03’17.75’N47°59’29”W 26.55’C2 26’48’38”250.00’116.98’59.58’N11°52’02”W 115.92’ 02 18’52’11”320.00’105.39’53.18’S1 5’50’1 6”E 104.91’C3 26’19’09”300.00’137.81’70.14’N12’06’47”W 136.60’ 03 26’48’38”230.00’107.62’54.82’N11°52’02”W 106.65’ 04 26’48’38”270.00’126.34’64.35’N11’52’02”W 125.19’ C5 1 6’33’54”280.00’80.95’40.76’S16’59’24”E 80.67’ 06 100’14’45”20.00’34.99’23.94’S41’24’55”W 30.70’ 019 89’30’31”20.00’31.24’19.83’S43’42’27”E 28.16’ C20 89’22’24”20.00’31.20’19.78’N45’44’00”E 28.13’ STORM DRAIN SD/12 -12”HDPE STORM DRAIN SD/15 -15”HDPE STORM DRAIN SD/18 -18”HDPE STORM DRAIN SD/21 -21”HDPE STORM DRAIN SD/24 -24”HDPE STORM DRAIN SD/30 -30”HDPE STORM DRAIN IRRIGATION It a Cr o s s i n g Ph a s e 1 9I T Y , MI L L A R D CO U N T Y , UT A H 00 00 + 6 - OO OO + G < De l DE L T A ( Ha r v e s t La n e IRR/30 - 30” CLASS III STORM DRAIN Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On 9+00.00Harvest Lane 5+00.00 20 0 20 40 60 Horizontal Scale: 1 " = 20’ Vertical Scale: 1” = 2’ 5+004580 6+00 7+00 8+00 9+004580in 45 7 6 . 5 6 FG 8+ 1 6 . 6 7 45 7 6 . 7 2 7+ 2 9 . 6 1 4578 4578 45 7 5 . 8 4 FG PIPE CROSSING (SEE SHEET 3 FOR MORE DETAIL) 45 7 4 . 6 2 0. PIPE CROSSING X (SEE SHEET 3 / FOR MORE DETAIL) 45 7 5 . 0 5 4576 4576 45 7 3 . 4 0 4574 4574 4572 4572 M |/8 qJ?” HDPE SDs -1.00% 26 L.F. PIPE CROSSING PIPE CROSSING (SEE SHEET 3 FOR MORE DETAIL)\hl/8 , i 375328 J. Waie reeve 21” HDPE SD S=0.10% 129 L.F.4570 4570 4569.36 INV STUB 8c CAP4568 4568 4566 4566 PIPE CROSSING 8” PVC SS S=0.34% 130 L.F. 8” PV3 SS\S=0.34% 55 L.F. PIPE CROSSING (SEE SHEET 3 FOR MORE DETAIL) 8” PVC SS S=0.34% 119 L.F.Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 4565.63 INV STUB & CAP----- EX.SS ------ 8”SS ----- EX.SS — EX.SS ------ 4564 4564EX.SS ------ 4562 4562 SS M H # 2 7+ 1 1 . 7 8 4’ 0 S S M H 45 7 5 . 9 3 RI M 45 6 4 . 8 4 IN V N 45 6 4 . 6 4 IN V S CB # 1 0 7+ 2 9 . 6 1 45 7 6 . 0 9 GR A T E 45 6 9 . 6 8 IN V E CB # 1 1 7+ 2 9 . 6 1 45 7 6 . 0 9 GR A T E 45 6 9 . 4 9 IN V W 45 6 9 . 4 9 IN V N SS M H # 1 5+ 8 1 . 6 7 5’ 0 S S M H 45 7 2 . 7 5 RI M 45 6 4 . 2 0 IN V N 45 6 4 . 2 0 IN V E (4 5 6 4 . 0 0 ) IN V SD M H # 2 7+ 5 6 . 9 3 5’ 0 S D M H 45 7 7 . 0 4 RI M 45 6 9 . 2 3 IN V 45 6 9 . 2 3 IN V 45 6 9 . 2 3 IN V SS M H # 3 7+ 6 8 . 3 3 5’ 0 S S M H 45 7 7 . 3 7 RI M 45 6 5 . 2 3 IN V 45 6 5 . 2 3 IN V 45 6 5 . 0 3 IN V Number: 8059—01Know whafs bdOW. Call before you dig. 22 Total Sheets 4560 45609+005+00 6+00 8+00 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build On e , I n c . ld O n ld On ld On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S Key Map NOT TO SCALE Key Map NOT TO SCALE 6+ 0 0 . 0 0 75 . 9 3 TB C 10 . 0 0 ’ \ 12 + 0 9 . 5 4 77 . 2 6 TB C / P T 5+ 7 0 . 3 5 6+ 0 0 . 0 0 75 . 6 6 TB C I 6+ 3 5 . 9 5 10 . 0 0 ’ OP I +6 ’ W SEE SHEET 4 FOR MORE DETAILSEE SHEET 4 FOR MORE DETAIL IR R / 3 0 IR R / 3 0 IR R / 3 0 RR / 3 0 7 -- - - - - - - - - - - - IR R / 3 0 -- - - - - - - - - - - - IR R / 3 0 - Construction Notesa 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE Construction Notesa 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE -- - - - - dH O ’ X B SS M H # 4 5+ 1 9 . 9 1 10 + 0 0 EX . O H A SEE SHEET 4 FOR MORE DETAIL STOB 8c BLOCK 6-yOO 4567.9Z INV STUB<& CAP 4569.98 INV STUB CAP __ _ _ _ _ _ 40 . |0 0 ’ 17 . 5 0 ’ 6+00 ST6B & BLOCK FU T U R E PH A S E 4566.79 INV STUB & CAP 4569.58 JflVl STUB a/CAF] FU T U R E PH A S E 60 . po ’ 40 . I 0 0 ’ RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s 12 + 8 9 . 5 4 74 . 9 6 TB C SEE SHEET 4 FOR MORE DETAIL STORM DRAIN STORM DRAIN SD/12 -12”HDPE STORM DRAIN SD/15 -15”HDPE STORM DRAIN SD/18 -18”HDPE STORM DRAIN SD/21 -21”HDPE STORM DRAIN SD/24 -24”HDPE STORM DRAIN SD/30 -30”HDPE STORM DRAIN IRRIGATION SD/12 -12”HDPE STORM DRAIN SD/15 -15”HDPE STORM DRAIN SD/18 -18”HDPE STORM DRAIN SD/21 -21”HDPE STORM DRAIN SD/24 -24”HDPE STORM DRAIN SD/30 -30”HDPE STORM DRAIN IRRIGATION It a Cr o s s i n g Ph a s e 1 CI T Y , MI L L A R D CO U N T Y , UT A H iv e 5+ 0 0 . 0 0 - 6+ 5 0 . 0 0 f 5+ 0 0 . 0 0 - 6+ 5 0 . 0 0 De DE L T A Mo o n s t o n e Dr i Em e r a l d Wa j IRR/30 - 30” CLASS III STORM DRAIN IRR/30 - 30” CLASS III STORM DRAIN TBC Curve Data #Delta Radius Length Tangent Chord CH Length C21 89’30’31”20.00’31.24’19.83’S43°42’27”E 28.16’ C22 90’29’29”20.00’31.59’20.17’N46’17’33”E 28.41’ TBC Curve Data #Delta Radius Length Tangent Chord CH Length 017 89’30’31”20.00’31.24’19.83’S43’42’27”E 28.16’ 018 90’29’29”20.00’31.59’20.17’N46’17’33”E 28.41’ Moonstone Drive 5+00.00 - 6+50.00 Emerald Way 5+00.00 - 6+50.00 20 0 20 40 60 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On 20 0 20 40 60 Horizontal Scale: 1” = 20’ Vertical Scale: 1” = 2’ Horizontal Scale: 1 ” = 20’ Vertical Scale: 1” = 2’ 5+00 6+005+00 4582 6+00 6+50 4582 6+50 45824582 5+ 3 0 . 0 0 45 7 7 . 3 0 FG FG 45 7 6 . 9 5 FG4580 4580 4580 4580 5+ 3 0 . 0 0 45 7 7 . 0 3 45 7 5 . 6 3 K=26.00 6+ 3 9 . 3 0 BV C 45 7 4 . 8 4 FG 45 7 4 . 6 5 II N EX. GRADE 5+ 1 2 . 5 0 45 7 6 . 9 0 FG4578 4578 4578 4578 45 7 5 . 9 0 FG 45 7 4 . 9 0 4576 4576 o4576 4574 4572 4574 574 GF? 4574 PIPE CROSSING (SEE SHEET 4 FOR MORE DETAIL) & 18 HDPE 4569.58 INV STUB 8c CAPPIPE CROSSING (SEE SHEET 4 FOR MORE DETAIL) 8” PVC PIPE CROSSING (SEE SHEET 4 FOR MORE DETAIL) , i 375328 J. Wate reeve 4572 4572 4572 4569.98 INV STUB 8c CAP PIPE CROSSING (SEE SHEET 4 FOR MORE DETAIL' 4567.92 INV STUB 8c CAP 4570 4570 45704570 4568 4568 4568 4568 Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 SS S=0.34% 122 L.F. 4566.79 INV STUB & CAP4566 4566 4566 4566 4564 4564 4564 4564 CB # 6 5+ 1 0 . 3 5 45 7 6 . 4 6 GR A T E 45 6 8 . 1 3 IN V W 45 6 9 . 1 3 IN V N 45 6 8 . 1 3 IN V E SS M H # 5 5+ 1 9 . 9 1 5’ 0 S S M H 45 7 6 . 7 8 RI M 45 6 7 . 5 1 IN V N 45 6 7 . 5 1 IN V E 45 6 7 . 3 1 IN V W 4562 5+00 45 7 6 . 7 4 GR A T E 45 6 6 . 3 7 IN V N 45 6 8 . 6 8 IN V 45 6 9 . 1 8 IN V 45 6 8 . 6 8 IN V SS M H # 4 5+ 1 9 . 9 1 5’ 0 S S M H CB # 5 45 6 6 . 3 7 45 6 6 . 1 7 4562 5+00 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH Number: 8059—01Know whafs belOW. Call before you dig.8 22 Total Sheets 4562 6+50 4562 6+506+00 6+00 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build On e , I n c . ld O n ld On ld On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S Key Map NOT TO SCALE coin CT) 00 - + CQ II &roi-O cdSEE SHEET 5 FOR MORE DETAIL OLd o d oo co id CO CD FH f o Jo +co m <z>CO ioio 0- n oIIco -141 M o o_Q_O 6 6co m- oo BLOCK 21” HDPE SD\ S=0.40% 12 L. 4570.11 INV STUk-A CAP iJ Q "F 1 1 1 O CL I ii s C > oo c ; 4571.12 INV STUB &c CAP Ab/S' <olO CT)CO in SEE SHEET 5 FOR MORE DETAIL Construction Notes; 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s STORM DRAINTopaz Court 5+00.00 - 6+75.00 20 0 20 40 60 SD/12 -12”HDPE STORM DRAIN SD/15 -15”HDPE STORM DRAIN SD/18 -18”HDPE STORM DRAIN SD/21 -21”HDPE STORM DRAIN SD/24 -24”HDPE STORM DRAIN SD/30 -30”HDPE STORM DRAIN IRRIGATION TBC Curve Data Centerline Curve Data #Delta Radius Length Tangent Chord CH Length #Delta Radius Length Tangent Chord CH Length C14 90’00’00”20.00’31.42’20.00’S86’31’54”E 28.28’04 22’28’35”150.00’58.84’29.80’N30’17’37”W 58.47’ 015 90’19’05”20.00’31.53’20.11’N3’37’38”E 28.36’ 025 26’48’55”170.00’79.56’40.52’N28’07’27”W 78.84’ C26 26’48’55”130.00’60.84’30.99’N28’07’27”W 60.29’ Horizontal Scale: 1 ” = 20’ Vertical Scale: 1” = 2’IRR/30 - 30” CLASS III STORM DRAIN To p a z Co u r t 5+ 0 0 . 0 0 - 6+ 7 5 . 0 0 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H 5+004582 6+00 6+754582 SD M H # 4 6+ 4 7 . 5 4 45 7 5 . 3 0 45 7 1 . 0 7 45 7 1 . 0 7 BV C FG 6+ 6 6 . 5 8 45 7 5 . 3 4 4580 4580 5+ 3 0 . 0 0 45 7 6 . 7 1 FG 5+ 1 2 . 5 0 45 7 6 . 3 6 FG 4578 4578 45M 9 4576 PIPE CROSSING (SEE SHEET 4 FOR MORE4574 4574 21” HDPE SD HDPE SD S=0.40% 129 PIP_F CROSSING / (SEE SHEET 4 F0R~MOgE fS A&$ S=0.34%-117 tFv 8” PVC SS 4570.11 INV , i 375328 J. Wate reeve 4572 4572 4570 4570 4568 4568 Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 4566 4566 4564 4564 CB # 3 1 5+ 1 0 . 5 0 __ _ _ _ _ _ 45 7 6 . 3 9 GR A T E 45 7 0 . 5 5 IN V NW 45 6 9 . 8 0 IN V NE 45 6 9 . 5 5 IN V SW SS M H # 8 5+ 2 0 . 0 0 __ _ _ _ _ _ 5’ 0 S S M H 45 7 6 . 4 6 RI M 45 6 9 . 4 4 IN V NW 45 6 9 . 4 4 IN V NE 45 6 9 . 2 4 IN V SW SS M H # 1 5 6+ 4 0 . 1 4 4’ 0 S S M H 45 7 5 . 5 1 RI M 45 7 0 . 0 4 IN V N =4 5 6 9 . 8 4 IN V SI Number: 8059—01Know what's belOW. Call before you dig.9 22 Total Sheets 4562 45626+755+00 6+00 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build On e , I n c . ld O n d On ld On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S Key Map NOT TO SCALE 9+ 8 3 . 6 8 CB # 3 4 Or A \ <' > L ' A" 2. 9 9 78 . 2 9 TB C / P T 10 + 7 6 . 8 4 c c H 22 + 1 77 . 8 8 1 1 +5 0 . 0 0 77 . 5 2 TB C 12 + 0 0 . 0 0 TB C A 1 +7 5 . 8 6 - Yr 77 . 3 9 TB C 22 + 1 1 . 8 4 /7 8 . 2 8 TB C / P C ADcM I / o/ V— st 13 + 0 0 . 0 0 76 . 7 7 TB C 13 + 5 0 . 0 0 76 . 5 2 TB C 1 1 +0 0 . 0 0 77 . 7 7 TB C SS M H # 1 2 12 + 4 9 . 0 7 12 + 5 0 . 0 0 FUTURE PHASE mm S= 0 . 3 4 % It SS M H # 1 1 10 + 4 6 . 8 1 0. 6 4 % 61 Construction Notes; 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE JI3+00+2+00 SE E SH E E T 10 FO R MO R E DE T A I L __ _ _ _ _ _ 40 , 00 ’ __ _ _ _ _ _ 17 . 5 0 ’ , 17 . 5 0 ’ 15 HD P E SD 60 . 0 0 ’ 10+00 10 + 5 5 . 3 4 LdLdCO tl QLdor \ \ \ \ \ \ \ 18 RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s 0.65% 504 L.F7 11 + 5 0 . 0 0 1 77 5 2 EX. ROAD WAY TO BE 00 ’ 0 0 + 2' +3 2 . 9 9 \ 78 . 2 8 TB C / P C 1 (1 + 7 6 . 8 4 .Z 7 . 9 3 TB /P T REMOVED AND REPLACED4567.79 INV 12 + 0 0 . 0 0 77 . 2 7 TB C 12 + 5 0 . 0 0 77 . 0 2 TB C 13 + 0 0 . 0 0 76 . 7 7 TB C 13 + 5 0 . 0 0 76 . 5 2 TB C STORM DRAIN SD/12 -12”HDPE STORM DRAIN SD/15 -15”HDPE STORM DRAIN SD/18 -18”HDPE STORM DRAIN SD/21 -21”HDPE STORM DRAIN SD/24 -24”HDPE STORM DRAIN SD/30 -30”HDPE STORM DRAIN IRRIGATION TBC Curve Data Centerline Curve Data #Delta Radius Length Tangent Chord CH Length #Delta Radius Length Tangent Chord CH Length 08 89’59’47”20.00’31.41’20.00’N86’32’01”W 28.28’C5 36’10’42”275.00’173.64’89.83’S59’37’29”E 170.77’ C11 90’00’13”20.00’31.42’20.00’S3°27’59”W 28.29’ 012 85’06’04”20.00’29.71’18.36’S88’58’52”E 27.05’ 013 96’34’23”20.00’33.71’22.44’N0’10’54”E 29.86’ 023 17’05’14”255.00’76.05’38.31’S56’38’54”E 75.77’ C24 18’45’41”295.00’96.60’48.73’S55’ 48’41 ”E 96.17’ Ce d a r Po i n t La n e 9+ 0 0 . 0 0 - 13 + 5 0 . 0 0 IRR/30 - 30” CLASS III STORM DRAIN Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d OnCedar Point Lane 9+00.00 - 13+50.00 6020 0 20 40 Horizontal Scale: 1 ” = 20’ Vertical Scale: 1” = 2’ De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H 9+00 4582 10+00 11+00 12+00 13+00 13+50 4582 NW NE SW 45 7 8 . 0 6 FG RI M IN V IN V IN V FG SD M H # 5 10 + 5 5 . 3 4 5’ 0 S D M H 45 7 7 . 8 3 f 45 7 3 . 0 9 I 45 7 3 . 0 9 I 45 7 3 . 0 9 I 45 7 7 . 9 9 45 7 7 . 4 9 FG 0+ 3 6 . 8 4 45 7 7 . 2 4 45 7 6 . 9 9 FG EX. GRA 4576 4578 65.08’ V.C. K—26.00 9+59.64 BVC 4577.33 FG 10+24.72 EVC 4577.82 FG 9+92.18 PVI 4577.17 EL PRO. SEE SHEET 6 FOR CROSS SECTION 4576(NOTE VIEW IS OFFSET FROM CENTERLINE OF JASPER DRIVE) PIPE CROSSING (SEE SHEET 6 FOR MORE DETAIL) PIPE CROSSING 4574 457415” HDPE , i 375328 J. Wate reeve 4572 4572PIPE CROSSING- (SEE SHEET 6 FOR MORE DETAIL) PIPE CROSSING 4570 4570PIPE CROSSING (SEE SHEET 6 FOR MORE DETAIL) 4568 4568 PVC SS S=0.34% 181 L.F Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 4566 4566 4564 4564 CB # 3 4 9+ 8 3 . 6 8 45 7 6 . 9 0 GR A T E 45 7 3 . 5 2 IN V SV \ CB # 3 3 9+ 8 3 . 6 8 __ _ _ _ _ 45 7 6 . 8 5 GR A T E 45 7 3 . 3 7 IN V NE 45 7 3 . 3 7 IN V SE SS M H # 1 1 1 0+ 4 6 . 8 4 5’ 0 S S M H 4- 5 7 7 . 9 4 RI M 4- 5 6 8 . 5 2 IN V NE 4- 5 6 8 . 3 2 IN V SE SS M H # 1 2 12 + 4 9 . 0 7 5’ 0 S S M H 45 7 6 . 8 0 RI M 45 6 7 . 6 3 IN V SW 45 6 7 . 6 3 IN V NW 45 6 7 . 4 3 IN V SE Number: 8059—01 10 22 Total Sheets 4562 9+00 4562 10+00 11+00 12+00 13+00 13+50 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, Inc. - Solutions You Can Build On e , I n c . d O n ld On ld On ld O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S ♦ CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S Key Map NOT TO SCALE 15 + 5 0 . 0 0 75 . 5 2 TB C 14 + 0 0 . 0 0 76 . 2 7 TB C 14 + 5 0 . 0 0 /7 6 . 0 2 TB C 13 + 5 0 . 0 0 76 . 5 2 TB C SS M H # 1 3 14 + 2 9 . 6 8 15 + 0 0 . 0 0 SD # 6 0 1 5+ 6 0 . 5 9 SS M H # 5 1 1 6+ 5 3 . 4 7 EX . G A S 2= 0 . 5 0 / ? 8= 0 . 3 4 % 0+ 0 0 PV C 1 4+ 0 0 . 0 0 76 . 2 7 TB C 1 4+ 5 0 . 0 0 76 . 0 2 TB C 15 + 0 0 . 0 0 75 . 7 7 TB C 1 5+ 5 0 . 0 0 75 . 5 2 TB C 1 3+ 5 0 . 0 0 76 . 5 2 TB C SD # 6 1 15 + 6 0 . 5 8 NOTES FOR UTILITY IN HWY 6: 1. CONTRACTOR MUST FIELD VERIFY LOCATION OF EXISTING WATER LINE PRIOR TO CONSTRUCTION 2. ALL CONNECTIONS FOR UTILITIES THROUGH HIGHWAY 6 MUST BE BORED PER UDOT STANDARDS.TEMPORARY BASIN Construction Notes; 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE SE E SH E E T 12 FO R MO R E DE T A I L RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 — 1 7 — 2 4 NF Ci t y Co m m e n t s STORM DRAIN SD/12 - SD/15 - SD/18 - SD/21 - SD/24 - SD/30 - 12” HDPE STORM 15” HDPE STORM 18” HDPE STORM 21” HDPE STORM 24” HDPE STORM 30” HDPE STORM DRAIN DRAIN DRAIN DRAIN DRAIN DRAIN IRRIGATION IRR/30 -30” CLASS III STORM DRAIN Ce d a r Po i n t La n e 13 + 5 0 . 0 0 - 16 + 4 6 . 3 6 Cedar Point Lane 13+50.00 - 16+46.36 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On TBC Curve Data #Delta Radius Length Tangent Chord CH Length 09 90’00’20”20.00’31.42’20.00’N3°28’02”E 4575.76’ C10 89’59’40”20.00’31.41’20.00’S86’31’58”E 4575.79’ Horizontal Scale: 1 ” = 20’ Vertical Scale: 1” = 2’ 15+00 16+00 ----------------------------------------------------------------1- 14+0013+504582 ---- 4580 16 + 0 0 . 7 9 15 + 6 6 . 4 0 45 7 5 . 4 1 FG 45 7 5 . 4 9 PRO. GRADE @ CD 00 45 7 6 . 4 9 FG 45 7 5 . 9 9 PRO. GRADE @ S=0.50% 4576 n PIPE CROSSING 4572 4570 Concentric Cylindricc 4568 Project Info. Engineer: J, NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 4566 4564 Lduozuo Number: 8059—01 SS M H # 1 3 14 + 2 9 . 6 8 4’ 0 S S M H 45 7 5 . 9 1 45 6 6 . 8 2 45 6 6 . 8 2 45 6 6 . 6 2 11 22 Total Sheets 456213+50 14+00 15 00 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build Or 4577 4577 456 6 456 7 456 8 e , I n c . d O n ld On ld On ld O n RARA 〱⼱㜯㈰㈴ Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S ♦ CM L EN G I N E E R S ♦ LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S 75.29 FG (75.42) NG 77.60 FFE TBC 77.60 KFEJ00 74.69 FG (75.33) NG•Z; EXXW 14±0 ° lX.OHP 73.86 FG• OHP EX.OHP&EX.OHP77.47 TBC SEE SHEET 5 FOR UTILITY & GRADING DESIGN FOR JASPER DRIVE EX.OHP74.00 J 3T0P76.81 TOP_1 -TOP 5+00 6-lj-OO 7+00 3+QQ_. .IRR/30 -IRR/30 IRR/30 IRR/30 RR/30i— IRR/30—IRR/3OHIRR/30 TOP (74.35) NG IR R M H # 4 \ 8+ 0 9 . 3 0 ( 66.00 BTM66.00 BTM 66.00 BTM 66.00 1 DTU Construction Notess 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE EX.OHPwoo: SE E SH E E T 14 FO R MO R E DE T A I L ia:»M» STORM DRAIN SD/12 -12”HDPE STORM DRAIN SD/15 -15”HDPE STORM DRAIN SD/18 -18”HDPE STORM DRAIN SD/21 -21”HDPE STORM DRAIN SD/24 -24”HDPE STORM DRAIN SD/30 -30”HDPE STORM DRAIN IRRIGATION 7 - (T 2.50’ RE V I S I O N S DA T E DE S C R I P T I O N 11 - 0 8 - 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s IRR/30 - 30” CLASS III STORM DRAIN FINISH GRADE 30” RCP IRRIGATION EX. GRADEEX. GRADE VARIES ti o n Ou t f a l l 5+ 0 0 . 0 0 - 10 + 0 0 . 0 0 Irrigation Outfall 5+00.00 - 10+00.00 20 0 20 40 60 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H Typical Berm Over Irrigation SCALE: NONE Horizontal Scale: 1 ” = 20’ Vertical Scale: 1” = 2’ 5+00 4586 P- 6+.00 7+00 8+00 9+00 10+00 — --------------------------------------I-----------------------------------—P -------------------------------------I -------------------------------------- 4586 4584 4584 4582 4582 4580 4580 ig a 4578 PIPE 4576 4576 4572 4572 UQ ? ITO328 \g|1 1 J. '.NATE REEVE 1 g : Project Info, Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 Number: ____8059—01____ 12 22 | Total Sheets 4570 4570 4568 4568 n oi=fcO io Know whafs belOW. Call before you dig. 4566 ---- 4566 10+005+00 6+00 7+00 9+00 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build Or Re e v e nc . Re e v e & s In c ti o Ca n ld O n uild On ld On Re e v e & A s s o c i a t e s , I n c . - S o l u t i o n s Y o u C a n B u i l d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S & As s o c i a t e s , In c . 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S Construction Notesa 1) ALL CONSTRUCTION IS TO CONFORM TO THE CITY STANDARD DRAWINGS AND SPECIFICATIONS. 2) CONSTRUCT HANDICAP RAMP PER ADA AND CITY REQUIREMENTS. 3) ALL EXISTING DITCHES THAT ARE BEING FILLED IN, MUST HAVE STRUCTURAL FILL IN ALL RIGHT-OF-WAY AND BUILDING FOOTPRINTS. 4) CONTRACTOR TO FIELD VERIFY DEPTHS AND LOCATIONS OF ALL EXISTING UTILITIES, COORDINATE WITH ENGINEER ON RECORD CULINARY WATER NOTE: 5’ MIN. COVER REQUIRED OVER CW LINES W/8 - 8” DIP W/POLY WRAP WATER LINE W - 1” TYPE K COPPER SERVICE LATERAL SANITARY SEWER SS/4 - 4” PVC SDR— 35 SERVICE LATERAL SS/8 - 8” PVC SDR— 35 SEWER LINE IR R M H # 5 10 + 5 7 . 4 6 IR R M H # 6 13 + 0 0 . 1 6 EX.: ’IRR II I . '/ » 6 ( I. Y'/ V.FA. ' X t — >RR/30~—y I • — ------- LT IRR/30- EX . GA S - -- - - - - o 13-J-10 I \ . -----X r / \ t-x -T I > 1 \ 1 T y' / ' it +'\>\ • 6+ 0 0 EX . GA S -- - - - - - - - -- - - - - - - - -- - - - ~ X. I STORM DRAIN SD/12 -12”HDPE STORM DRAIN SD/15 -15”HDPE STORM DRAIN SD/18 -18”HDPE STORM DRAIN SD/21 -21”HDPE STORM DRAIN SD/24 -24”HDPE STORM DRAIN SD/30 -30”HDPE STORM DRAINSE E SH E E T 13 FO R MO R E DE T A I L RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s IRRIGATION IRR/30 - 30” CLASS III STORM DRAIN cO §u o _o i c tZo.s’o <Z)CO < COco 0)coo5 £ o> REEVE Irrigation Outfall 10+00.00 - 13+10.37 20 0 20 40 60 Horizontal Scale: 1 ” = 20’ Vertical Scale: 1” = 2’ 10+00 11+00 12+00 1 3+0CD3+1 0 4584 4584 4582 4582 4580 4580 4578 4578 PRO. GRADE @ PIPE PRO. GRADE PIPE4576 4576 n4574 4574V T, ’ FT. ' \ ' \ / \F J\ / \ / \ . \ 30”VcP IRTFS=/ 0.10%\-43 / L.F. " w 1 30” RCP IRR S=0.10% 248 4572 4572 4570 4570 4568 4568 4566 4566_ Ld 00 111 D CO • O er |T ■©■cr « v com a: oer 1 Y°Q°Qrr <O <-h* h* h*m tn tnm + + +/I RG /I — Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 Number: ____8059—01____ 13 22 Total Sheets Know what's b@l0W. ® Call before you dig THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR Reeve & Associates, - Solutions You Can Build MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. ∅ ∅ 4577 457 8 4578 4 5 7 8 45 7 8 4579 4579 4 5 7 5 4576 4577 4577 4577 4577 4 5 7 5 4 5 7 6 4577 4 5 7 6 457 0 456 6 456 7 456 8 456 9 457 1 457 2 457 3 457 4 457 5 45 7 5 457 1 457 2 45 7 3 45 7 4 4 5 7 6 45 7 6 4577 4577 45 6 6 45 6 7 45 6 8 45 7 0 45 6 9 45 7 1 45 7 2 45 7 3 45 7 4 Re e v e nc . d O n ld On d On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S & As s o c i a t e s , In c . oV®6 v \ / x di 1 T 1 1'1 i 4569.36 INV/STUB 4569.58 INV/STUB 78 . 9 6 TB C / L O T (7 4 . 9 0 ) . NG - A 4569.98 INV/STUB(0 0) £+CO Q . %2; s 76.5. TBC 76.53 TBC =0.4176.74 6 TBC 76.74 -—4573. 45 INV >— 30’1- RCRIRR S=0.31% 55 L.F. 76.25 TBC 76.26 1 TBC [.OO77.93 TBC 77.73 TBC-Jasper Drive 11+00 77.34 _ TBC10+00 co6+00 7+00 TBC9+00 77.07 TB B#42__ 4576.90 4568.93 TBC 12+001-77.91 TBC GRATE INV v 77.75 TBC 00 14+00 HOPF SO S 74.00 . IQP—.30” HDPF SD R -Q.20% ?7R i r 77.47 TBC 76.81 TOP cRR/,30-OSJ-rFT **6+00£ ____URR/:~iKiT"s,?-Trrj%" 4 1 /SDMH#2 T0SDMFI 4577.04 4569 23 4569.2 \ 4569.23 15” S CB#1 1 4576.09 GRATE 4569.49 INV W 4569.49= INV N 7+0*IRR/3076 83 TBC RR/30in + 5-1- 00*+-—-T~ I By . " I v IRR1 ! ------- IRR/3Q dRR/30 RIM INV INV INV MDPEr/SD 1.00% 26 L.F. ~ 4576.74 4568.68 4569.18 4568.68 CB#6 ____76.59 N S E 4577.58 4572.86 RIM INV INVW INV NCB#10 45T6.09 GRATE 4569.68 INViE 4576.46 4568.13 4569.13 4568.13 GRATE INV W INV N INV E TOP 66.00 BTM .00 INV 15”, wpx < s S=0.50%3>3/r-66.0066.00 BTM STM4567.93 -INV S 30 HDPE SD S=3.85% 50 L.F 4566.00 INV 66.006+78.23 75*33 TBC/LQI (72.50) NG 66.00 BTM z BASIN NOTES: TOP/BERM OVERFLOW HIGH WATER d BOTTOM INV SIDE SLOPE NOTE: PER GEOTECHNICAL REPORT BY CHRISTENSEN GEOTECHNICAL (CG PROJECT NO: 145-023) GROUND WATER = 8+ FEET 6.01 Z BTM 4574.00 4573.50 4573.00 4566.00 3:1 74.00 TOP, . 74.00 /<j 66.00 J BTM 5+95.39 73.31 TBC/LOT (7J.35) NG 66.00 BTM 74.00 TOP '*z 74,00 TOP; 73.50 TOP OVERFLOW BERM - ??? TOP• r f f< 71 TOf' 74.00 ' T0F W(72.21) NG+t Storm Runoff Calculations Delta Crossings 8059-01 11/8/2023 kar ■-' 7 ) 1 1 " I 'H L .• ) I I I z /!> {* ii ' >,A'\‘ / r - ■ + / 5+00 IRR H#1 5/-IRRMH 4579-32 4573.28 RIM INV Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On 'J )' AS T CA N A L RC X TK r<i - Tf IA >/ /'sSeL,\ »» (M.OOc. - JRR/3! RE V I S I O N S DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H Gr a d i n g Pl a n • ) • i J _/'4T)l TOP 7 u 0 0 _(73.07) NG x STAGE STORAGE TABLE ELEV AREA (sq. ft.) DEPT H (ft) AVG END INC. VOL. (cu. ft.) AVG END TOTAL VOL. (cu. ft.) CONIC INC. VOL. (cu. ft.) CONIC TOTAL VOL. (cu. ft.) 4,566.00 22,252.48 0.00 22.26 22.26 22.26 22.26 4,567.00 24,153.48 1.00 23179.78 23202.04 23173.29 23195.55 4,568.00 26,31 1.20 1.00 25232.34 48434.38 25224.65 48420.21 4,569.00 28,559.99 1.00 27435.60 75869.98 27427.91 75848.12 4,570.00 30,897.07 1.00 29728.53 105598.51 29720.87 105568.99 4,571.00 33,320.95 1.00 32109.01 137707.52 32101.38 137670.37 4,572.00 35,833.03 1.00 34576.99 172284.51 34569.38 172239.75 4,573.00 38,432.55 1.00 37132.79 209417.30 37125.21 209364.96 4,574.00 41,102.65 1.00 39767.60 249184.90 39760.13 249125.09 2+00 — 4578 1+00 4578 —1+00 45784578 PRO.GRADF The following runoff calculations are based on the Rainfall - Intensity - Duration Frequency Curve for the Delta, Ut area taken from the NOAA Atlas 14 database. Calculations have been completed for the 100-yr 24- hr storm event. Storm water runoff has been calculated for a fully developed site and full retention. 457645764576 The calculations are as follows: Drainage Area: Total Area = 53.72 acre or Runoff Coefficients Paved Area Single Family Townhome Commercial Future Development Landscaped Area Weighted Runoff Coefficient 2,340,057 ft2 413,433 212,800 196,061 246,762 137,584 1,133,418 C = 0.9 C = 0.9 C = 0.9 C = 0.75 C = 0.75 C = 0.2 C = 0.54 LID Retention 80th Percentile Rainfall Event (d) 0.45 Is the site Feasible for LID? Yes Site Imperviousness (i) 0.27 NRCS Soil Group C/D Rv Equation 0.83i A 1.122 R v (Soil Group A: 0.84i A 1.302; B: 0.84i A 1 .169; C/D: 0.83i A 1 .122) 0.19 Vgoai = Rv x d x Total Site SF 16596 Percolation Rate: Drainage Area 40,929 s.f. Perc Rate 90 mpi in c.f. Percolation out Time to Drain (1in/perc rate)*(1ft/12in)*(1min/60sec)*Bot Area of D 0.63 cfs 90.5 hrs | ADJ. PROPERTY SIDE |[PROPERTY SIDE I EX.GRADE457445744574 FINISH GRADE EX.GRADE 4.00* ' 1 75328 J. NATE REEVE EX.GRADE457245724572 [RETENTION BASIN | TO BASIN 1---------------- [RETENTION BASIN | 457045704570 Overflow Berm Detail SCALE: NONE Volume of Run-off for 100-year Storm Event: I GR A T E CB # 4 2 1 +0 4 . 4 4 o> CO1m C =0.54 I =See Below in/hr A =2340057 ft 2 Q(out) =0.00 ft3 /s (0 cfs per acre) time time Q Vol. in Vol. out Difference (min)(sec) (in. /hr.)(cfs)(cf)(cf)(cf) 0 0 0.00 0.00 0 0 0 5 300 4.93 143.22 42967 0 42967 10 600 3.75 108.94 65365 0 65365 15 900 3.1 90.06 81053 0 81053 30 1800 2.09 60.72 109290 0 109290 60 3600 1.29 37.48 134913 0 134913 120 7200 0.729 21.18 152483 0 152483 180 10800 0.491 14.26 1 54052 0 154052 360 21600 0.263 7.64 165033 0 165033 720 43200 0.14 4.07 175701 0 175701 1440 86400 0.082 2.38 205821 0 205821 SUMMARY: The required 100-yr storage volume is 205,821 cubic feet Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 45680045684568 $0 45 6 8 . 9 3 IN V NE 45 6 8 . 9 3 IN V S .9 6 GR A T E .9 3 IN V W .9 3 IN V S BOTTOM 4566 4565 1+75 to Basin 20 40 60 4566.00 INV TO BASIN 4566 — 4565 2+00 0 40 80 12040SD*42 to Basin 0 20 40 60 CMCOQ Number: 8059—01 Scale: 1” = 40’ 14 22 Total Sheets Horizontal Scale: 1” = 20’ Vertical Scale: 1” = 2’ Horizontal Scale: 1 = 20 Vertical Scale: 1” = 2’ THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT.Reeve & Associates, - Solutions You Can Build Or 4577 45 7 6 45 7 7 45 7 7 4577 4 5 7 8 4578 4 5 7 8 4578 45 7 5 45 7 6 456645674568 Re e v e nc . d O n uild On d On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On FG 78.12 FG (77.2p) NG 78.12 . v l(7?W NG C A (76. /1 1) ng; .4 FG <z 77.59 FG 76.95 FG (76.54) NG 76.95 (767071 NG77.79 FG (76.56) NG 78.03 FG (76.99) NG The following runoff calculations are based on the Rainfall - Intensity - Duration Frequency Curve for the Delta, Ut area taken from the NOAA Atlas 14 database. Calculations have been completed for the 100-yr 24-hr storm event. Storm water runoff has been calculated for a temporary basin to be located in the area of the future commercial development for the runoff from the 460 North roadway area not captured in the overall project basin. LID for this area is already provided in the main basin. FG (76.63) NG 75.49 TBC 45I71M2 I NV ' X*'7.60\bc 77. d* TBC I The calculations are as follows: 9 Drainage Area: Total Area = 0.67 acre or Runoff Coefficients Paved Area Weighted Runoff Coefficient > S' ,0)Co coxoj/78.85 FFE 78 f 65 FFE . 78.00 FFE I FFE FFE 78.85 | FFE 78.00 FFE 78.65 78.85 L FFE 78.65 FFE 78.00 5 0SDMI 4575.3C 457 07 1 INV/N 1.07 "■ I RIM CB 45‘ 457. .90 GRATE L* >.52 INV SW INV SE CB#33 \ 4576.85 G > 4573.37 INV E TBC 76.34 TBC TBC £p0 Jasper Drive18+00 ° 19+00 76.75 TBCTBC 16+00 2+ )0 23+0020+00 21+0017+00 78.26 TBC CB#37 76.93 TBC S=0.40/o 69 L.F. r - 2-§=0.40 4fi)//.8u G tAIE - y 4573.48 INV, NE 4573-46' INV SW 15” HDPE SD S=0.64% 61 HUHL SD-S 7E.28 TBC 77193 TBCCBf42 576 9Q 8.93 GRATE INV Wkih#3 y 5’0SDMIfl —4577.8 -------- 457370- 4 4573.0 IN' 4573.09 IN' 77.88 TBC:Q r 1 \ C 4. W IV c '7C z n - Ab ATr Rl'4576.39 GRATEX 4570.55 INV NW „ I4569.80 INV NE 4569.55 I NV NE SV■fr, 74 Q . SSLx.74.00 , xK S vTSVy 78.60ffeC 78.60 FFE 78.25 FFE 78.90 FFE 7q>90 FFE 77.60 FFE 78.2577.60 FFE 78.60 FFE 78.9078.25 FFE 77-60ffe// ,78.6078.25 FFE 78.90 FFE 77.60 FFE FFERTM RC J 4735) NG 75.76" FG _75.93 FG (75.77) NG (76.85) NG 75.7 p/ ’ (75.85) NG 75.77 FG (75.70) NG 76.00 FG x _76.42 FG (76.15) KlG1 (76.49) NG 76.02 FG E75.&) NG 76.34 (75.9-£Ms 76.63 (76.64) NG 76.31 FG (76.64) NG 76.50 FG (76.53) NG 75.29 FG 75.42 FG (75.42) NG -,(75.77) -hlG 74.6 *F(f.\ (75.33 NG 73.86 IRRMH#4 5’ IRRMHX 4577.74 W 4572.12 INV A/ t S’7 *' A? EX.PP GUY WIRES TO BE REMOVED/RELOCATED V / 'W POORDINATE? wW-POWER< O lPANY) 1 8T • IRRMH#5 5’ IRRMH 4576.12 RIM 4571.87 INV V4 , < ’« >- 73.60 TOP yVv ,C- 73.93 TOP(72.42) NG 30 S=0.10% 243 L.F. RCP IRR CO,TEMPORARY BASIN NOTES: TOP/BERM HIGH WATER BOTTOM INV SIDE SLOPE = 4574.00 = 4573.00 = 4571.50 = 3:174.53 TOP(73.00) NG '15./ROP SD S=1.31% 21 SD#6l/ 5 4574.97 4571.78 4571.76 J< 7,4.03 TOP EX.PP GRATE INV NE INV\ SWIRRMH#6 4’0IRRMH 4576.00 RIM 4571.63 INV (4571.63) INV 4571.50 INV " BTMBTM 71.50 BTM SD#6Q 4574.96 GRATE 4571.96JNV SW 74.94 75.04 74.71 75.16 EP(73.10)75.31"TOP 75.48 EPEX.P 10+00—6+00 EX. GAS5+00_EX.GAS EX.GASEX.GAS EX’.GAS -i EX.GAS — nLO I 75.09 corqoqin |oi 4H EP o>(75.45) EPEX. STREET LIGHT (75.65) "0 BE RELOCATED — --------- (75.58) EPL_(75.62)(75.90) EP (75.721 EP —(76.17) EP (75.93) U.S. Hwy 6? ''T - \ 5- Ah - EX. 36 CMP (457 K69) INV a Al x TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S & As s o c i a t e s , In c . 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S 460 North Storm Runoff Calculations Delta Crossings 8059-01 11/8/2023 kar 29,342 ft 2 29,342 C = 0.9 C = 0.90I c £ 76 <p i TBC /V Percolation Rate: Drainage Area 2,520 s.f. Perc Rate 90 mpi Percolation out (1in/perc rate)*(1ft/12in)*(1min/60sec)*Bot Area of D 0.04 cfs Time to Drain 30.9 hrs Volume of Run-off for 100-year Storm Event: C =0.90 I =See Below in/hr A =29342 ft2 Q(out) =0.00 ft 3 /s (0 cfs per acre) time time i Q Vol. in Vol. out Difference (min)(sec) (in./hr.)(cfs)(of)(cf)(cf) 0 0 0.00 0.00 0 0 0 5 300 4.93 3.01 904 0 904 10 600 3.75 2.29 1375 0 1375 15 900 3.1 1.90 1706 0 1706 30 1800 2.09 1.28 2300 0 2300 60 3600 1.29 0.79 2839 0 2839 120 7200 0.729 0.45 3209 0 3209 180 10800 0.491 0.30 3242 0 3242 360 21600 0.263 0.16 3473 0 3473 720 43200 0.14 0.09 3697 0 3697 1440 86400 0.082 0.05 4331 0 4331 SUMMARY: The 100-yr storage volume for the temporary basin is 4,331 cubic feet Se e Sh e e t 14 DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s RE V I S I O N S Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On De l t a Cr o s s i n g Ph a s e 1 > C ' - 75.52 EP ___ EX.GAS (75.38)’ EP DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H Gr a d i n g Pl a n 375328 IATE REEVE 15” R 3P SD =0.50%37 X Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 100 Know what’s belOW. Cell before you dig. Number: 8059—01 Scale 15 22 Total SheetsTHESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, Inc. - Solutions You Can Build Re e v e & A s s o c i a t e s , I n c . Re e v e & A s s o c i a t e s , I n c . - S o l u t i o n s Y o u C a n B u i l d O n ld On ld On Re e v e A s s o ia t e s , I n c . - S o l u t i o n s Y o u C a n B u i l d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On £ p i±j h in ID$s > 4570.11 INV — PVC SS 0 5=O.34% 20 L £s Sog gj£7LU *— CMCO O QI *LU SSMH#15££ 4 0SSMH 4565.63 INV/STUB £L------- 4569.36 INV/STUB RM4575.51 NV N4570.044566.79 INV/STUB 4569.58 INV/STUB NV OUT4569.844567.92 INV/STUB CONTRACTOR MUST FIELD LOCATE EXISTING UTILITIES LOCATED IN 450 NORTH STREET LINE PRIOR TO CONSTRUCTION. COORDINATE WITH E.O.R. UPON LOCATING UTILITIES.to <p E SSMH#3 5’0SSMH 4577.37 4565.23 CONTECH BRIDGE (SEE SHEET 18) RIM INV IN SSMH#6 4’0SSMH |4577.24 RIM 4568D8~INV IN 4567.88 INV OUT coco $7/ 4565.05 INV OUT cooo///////////,coco SSM 5 0SSMHJasper Driveoo 4576.46 RM 00 4569.44 NV NEXISTING PIPE TO IRRIGATION BE REMOVED EX.OHP — B#42 4569.44 NV N 4576.90 GRATE 4569.24 NV OUTEX. OHP 4568.93 NVex.ohp 8”W S S=0.34% 276 EX.OHP ■EX.ftHP zo CL cro 00Ld Q EX. OHPs o'coHOPF SD S=O 20% 275 I F 3U HO8 PVC SS (134% 108 L.F. 8 ” PVC----- IRR/30 -HDPF SD S=0 20% 276 I FIRR/30 (D(D■30” HDPF SD S=0 20% qr i r >05 IRR/30 -----IRR/30IRR/30 IRR/30SDMH#2IRRMH#1 5’ IRRMH 4579.32 RIM 4573.28 INV IRR/30IRR/30IRR/30 ------------8” PVC SS S=0.34% 55 L.F. ____IRRMH£2__D" 3’0SDMH --------OOCB#5 __ _ _ GRATE COSSMH#7. ’ziC'C'k A l"iEXIST NG OVERHEAD POWER TO BE REMOVED AND REF OUTED UNDERGROUND (CO)RDINATE WITH POWER 5’ IRRMH4577.04 RM _SSMHf5_4576.74 _\CBf6_4569.23 NV N 4577.58 R M O co5 IRRM5’0SSMHSSMH#4 5’0SSMH 4568.68 NV WCB#10 4576.09 4569.68 RM4577. 84576.46 GRATE4569.23 NV S 4572.86 NV 2=4.50% 65 L.F..67 R MNVN4576.78 RM 4568.71 NV N4568. 3 NVEXSTNG OVERHEAD POWER WGRATE INV.E 4569.23 NV E 4572.43 INV CB#32NVE4567.51 NV N 4568.51 NV OUTTO BE REMOVED AND 4569. 3 NV N15”HDPE SD 4577.05 RM 4567.51 NV NBRIDGE NOTES: CONTRACTOR MUST POT HOLE & LOCATED WATER LINE ON EACH SIDE OF CANAL PRIOR TO BRIDGE CONSTRUCTION. CONTRACTOR TO FIELD VERIFY DEPTHS & SIZING OF EXISTING WATER LINE PRIOR OF BRIDGE CONSTRUCTION. CONTRACTOR MUST FIELD VERIFY LOCATION OF EXISTING SEWER. CONTRACTOR MUST TERMINATE SEWER ON THE WEST SIDE OF PROPOSED BRIDGE LOCATION. REROUTED UNDERGROUND 4568. 3 NV E 4566.00 NVs1.00% 26 L.F.4566.37 NV N 4576.96 GRATE4567.31 NV OUT15” HDPE S S=0.50% 37 L.F. (COORDINATE WITH POWERCB#1 1 4566.37 NV N 45COMPANY)toCXI Ioo LdH: n 4566. 7 NV OUT 4567.93 NV S4576.09 GRATE CXIEXSTNG OVERHEAD POWER 4569.49 NV W TO BE REMOVED AND 4569.49 NV N REROUTED UNDERGROUND30 HDPE SD S=3.85%(COORDINATE WITH POWER4566.00 INVSSMH#2 COMPANY) 4’0SSMH 4575.93 RM -A\ \in > <n 4564.84 NV N 4564.64 NV OUT Ro 4564.30 INV 30 SSMH#1 5’0SSMH 4572.75 4564.20 i 4564.20 1 4564.00 RIM INV INV INV IN IN OUT 4sCOco3a>coo3 co £00 ESTATESI DELTA ESTATES DEL1TA co Sunset Street 375328 J. NATE REEVEUTILITY NOTES: PVC CONDUCTS MUST BE PROVIDED AT EACH INTERSECTION TO ACCOMMODATE FUTURE ELECTRICAL POWER, NATURAL GAS AND TELEPHONE/CABLE COMMUNICATIONS CROSSING IF THESE UTILITIES ARE NOT INSTALLED PRIOR TO STREET PAVING, THEN CONDUITS INSTALLATION MAY BE REQUIRED BY THE INDIVIDUAL UTILITY/SERVICE COMPANIES. PROVIDE 18” CLEARANCE DEPTH OF WATER 1. FOR WATER LATERALS OVER SANITARY SEWER 4’ MIN. BELOW FINISHED GRADE.TO BE 2. 3. — Project Info. Engineer: J, NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 Number: ____8059—01 ___ 16 Total Sheets DEMOLITION NOTES: COMPANY ON REMOVAL OF ALL ON SITE POWER POLES.1. COORDINATE WITH 2. REMOVE/ABANDON 3. ALL EXISTING SEWER MANHOLES WITH IN PROPOSED LOTS MUST BE REMOVED. POWER EXISTING UTILITIES ON SITE THAT ARE NOT CURRENTLY IN USE. 80 12040040 Know what's belOW. Call before you dig40Scale: 1 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT.Reeve & Associates, - Solutions You Can Build Or e , I n c . d O n d On d On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S ~ r-457 O2yINV / 21” heIpe SO SDMH#4 I 5’0SDMH 4575.30 I 4571.07 4571.07/1 RIM INV/N/ INV SE CB#34 4576.90 GRATE 4573.52 INV SW S “ n 40% 5 / u 4576.85 GRATE 4573.37 INVJNE 4573’. 37 INV SE 0.40%BLOW-OFF HIGH POINT asper Drive 8” PVC SS S=0.34% 35 L.F. 8 PVC SS S=OJ54% 215 L.F. SD S=0.65% CB#42 4576.90 GRATE 4568.93 INVX "24XdDPE'SD 8=4.50% 65 JlLZ. 4577 D 83 TITS __ MCB#31_SSMH#8 > 5’0SSMH ------- 4576.46 RIM 4569.44 INV IN RIH IN'' INV IN'' '4576.39 GRATE 4570.55 INV NW I4569.80 INV NE 4569.55 INV SW NV' NE SV 4573.0 457)3.09 4578.07 RIM 571.30 INV OUT %> 4569.44 INV IN \ 4569.24 INV OUT RCP IRR 8=0.1 0: BLOW-OFF AT HIGH POINT IRRMH#< 5’ IRRMHX 4577.74 RIIVK 4572.12 INV \y&xX YfeX\ XXx 4567.79 INV 8”W IRRMH#5 5’ IRRMH 4576.12 RIM 4571.87 INV 3 I •?III 4566.98 INV 30” RCP IRR S=0.10% 243 L.F.8”W UTILITY NOTES: 1. PVC CONDUCTS MUST BE PROVIDED AT EACH INTERSECTION TO ACCOMMODATE FUTURE ELECTRICAL POWER, NATURAL GAS AND TELEPHONE/CABLE COMMUNICATIONS CROSSING IF THESE UTILITIES ARE NOT INSTALLED PRIOR TO STREET PAVING, THEN CONDUITS INSTALLATION MAY BE REQUIRED BY THE INDIVIDUAL UTILITY/SERVICE COMPANIES. 2. PROVIDE 18” CLEARANCE FOR WATER LATERALS OVER SANITARY SEWER 3. DEPTH OF WATER TO BE 4’ MIN. BELOW FINISHED GRADE. DEMOLITION NOTES: 1. COORDINATE WITH POWER COMPANY ON REMOVAL OF ALL ON SITE POWER POLES. 2. REMOVE/ABANDON EXISTING UTILITIES ON SITE THAT ARE NOT CURRENTLY IN USE. 3. ALL EXISTING SEWER MANHOLES WITH IN PROPOSED LOTS MUST BE REMOVED. \ 56II1 IRRMH#6 4’0IRRMH 4576.00 RIM 4571.63 INV (4571.63) INV 4571.50 INV i 70 \ EX.GASEX.GASEX.GAS EX.GAS EX.GAS EX.GAS 4570.11 INV- 8” PVC SS --------. \ V \ X\ X S=0.34% 20 SSMH#15 4’0SSMH 4575.51 4570.04 4569.84 RIM , INV IN 1 INV OU/T Se e Sh e e t 16 Xs-AjXo. ;;0-2 CL OLO E E E E CO o § ° w aor Ld Q CO l O 15” HDPE SD— 8=0.40% 69 L.F. 4568.64 INV 4577.80 GRATE 4573.48 INV NE 4573.48 INV SW 15” HDPE SD S=0.64% 61 L.F. _SSMH#1 1 5’0SSMH I ____________________| 8” PVC SS S=0.34% 274 L.F. IN S5MH#9" 4’0SSMH 4577.45 4p70.37 4577.94 RIM 4568.52 INV IN 4568.32 INV OUTRIN/ INV INVj i Cr o s s i n g ha s e 1 MI L L A R D CO U N T Y , UT A H li t y Pl a n It a PI CI T Y , De l DE L T A < Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On 8” PVC SS S=0.34% 48 L.F. SSMH#12 5’0SSMH 4576.80 RIM 4567.63 INV IN 4567.63 INV IN 4567.43 INV OUT 8” PV C SS sA o . 3 4 % 18 1 8” PVC SS S=0.34% 48 SSMH#13 ’4’0SSMH 4575.91 RIM 4566.82 INV IN 4566.82 INV IN 4566.62 INV OUT |W 8” PVC SS S=0.34% 224 L.F. 15” RCP SD S=1.31% 21 SD#61 4574.97 4571.78 4571.78 GRATE INV NE INV SW SD#60 4574.96 GRATE 4571.96 INV SW NOTES FOR UTILITY IN HWY 6: 1. CONTRACTOR MUST FIELD VERIFY LOCATION OF EXISTING WATER LINE PRIOR TO CONSTRUCTION 2. ALL CONNECTIONS FOR UTILITIES THROUGH HIGHWAY 6 MUST BE BORED PER UDOT STANDARDS. 1375328 J. NATE REEVE Ri 0150% EX.GAS EX. GAS EX.GAS Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 CON NECT TO EXISTING (FIELD VERIFY DEPTH & LOCATION) BORE PIT £XEXEXEXEX-EX EX.SS EX.36”CMP (4571.69) INV SSMH#51 ______ 5’0SSMH ------4574 39 RIM- - 4565.42 INV SW 4565.86 INV NW 4565.42 INV NE EX.SS --------------------------- EX.SS ----------------- 0 Number: 8059—01 Scale: 1” = 0’ 17 22 Total SheetsTHESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY UABIUIY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, Inc. - Solutions You Can Build On Re e v e nc . d O n uild On d On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S & As s o c i a t e s , In c . 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S r OF COVER ABOVE CULVERT BEFORE ASPHALT ASPHALT, SEE STREET CROSS SECTION ON SHEET 2 CD CONCRETE WALL 8’X6’ BOX CULVERT (BOTTOM OF BOX CULVERT TO MATCH EX.CONCRETE CANAL ELEVATION) 8.00’ 20.00’ (MIN) 20.00’ DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s 6.0’ EX.CONCRETE CANAL 8.00’ RE V I S I O N S N0 I 1 I S N ’ 6 CURB WALL WITH 6 CHAIN LINK FENCE 2. 3 0 L 4 . 0 0 ’ Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On De l t a Cr o s s i n g Ph a s e 1 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On PROPOSED ROAD 25 . |0 0 ’ Ca n a l Cr o s s i n g De t a i l s PROPOSED ROAD DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H 6” CURB WALL WITH 6’ CHAIN LINK FENCEPROPOSED PRRECAST 8’ X 6’ BOX CULVERT TR A N S I T I NOTE: PROVIDE WATER STOP AT ALL CONNECTIONS 6.00’ BOTTOM 20.00’ TOP EX.CONCRETE CANAL Proposed Precast 8 F x6 F Box Culvert NTS ' I3V5328 J. NATE REEVE m 6 SPACES MINIMUM m ld|oo ID co 5/16”1 /16” 6” Waterstop NOT TO SCALE Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 Number: 8059—01 18 22 Total SheetsTHESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, Inc. - Solutions You Can Build e , I n c . d O n d On d On d O n RARA 〱⼱㜯㈰㈴ Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S ♦ LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S ♦ ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S I E I I 1 ft I I i I I I I I I I I I B I 1 B B B I B B 1 i S 1 1 i & 1 & & 1 1 i 1 II I CONSTRUCT FLOW THROUGHS TROUGHS \-i -1/ \ '1 I Sanitary sewer manhole 1. GENERAL A. The drawing shows typical pipe connections. Refer to construction drawings for connection locations or refer to field location of existing piping when engineering pipe connection to the manhole. B. Manhole size. 1) Diameter is 4 feet: For sewers under 12" diameter. 2) Diameter is 5 feet: For sewers 12" and larger, or when 3 or more pipes intersect the manhole. 2. PRODUCTS A. Base Course: Untreated base course, APWA Section 32 1 1 23. Do not use gravel as a base course without ENGINEER’S permission. B. Backfill: Common fill, APWA Section 31 05 13. Maximum particle size 2-inches. C. Concrete: Class 4000, APWA Section 03 30 04. D. Riser and Reducing Riser: ASTM C 478. E. Reinforcement: Deformed, 60 ksi yield grade steel, ASTM A 615. F. Grout: 2 parts sand to 1 part cement mortar, ASTM C 1329. G. Stabilization-Separation Geotextile: Moderate or high at CONTRACTOR’S choice, APWA Section 31 05 19. 3. EXECUTION A. Foundation Stabilization: Get ENGINEER’S permission to use a sewer rock or a granular backfill borrow in a geotextile wrap to stabilize an unstable foundation. B. Base Course Placement: APWA Section 32 1 1 23. Maximum lift thickness is 8- inches before compaction. Compaction is 95 percent or greater relative to a modified proctor density, APWA Section 31 23 26. C. Invert Cover. During construction, place invert covers over the top of pipe in manholes that currently convey sewerage. See Plan 412. D. Pipe Connections: Grout around all pipe openings. E. Pipe Seal: Install rubber-based pipe seals on all plastic pipes when connecting plastic pipes to manholes. Hold water-stop in place with stainless steel bands. F. Joints: Place flexible gasket-type sealant in all riser joints. Finish with grout. G. Adjustment: If the required manhole adjustment is more than T-0”, remove the cone and grade rings and adjust the manhole elevation with the appropriate manhole section, the cone section, and the grade rings or plastic form to make frame and lid match finish grade. H Finish: Provide smooth and neat finishes on interior of cones, shafts, and rings. Imperfect moldings or honeycombs will not be accepted. I. Backfill: Provide backfill against the manhole shaft. Pea gravel and recycled RAP aggregate is NOT ALLOWED. Water jetting is NOT allowed. Maximum lift thickness is 8-inches before compaction. Compaction is 95 percent or greater relative to a standard proctor density, APWA Section 31 23 26. Trench backfill 1. GENERAL A. The drawing applies to backfilling the trench above the pipe zone. 2. PRODUCTS A. Backfill: Common fill, APWA Section 31 05 13. Maximum particle size 3-inches. B. Flowable Fill: Target is 60 psi in 28 days with 90 psi maximum in 28 days, APWA Section 31 05 15. It must flow easily requiring no vibration for consolidation. 3. EXECUTION A. Trench Backfill: 1) DO NOT USE sewer rock, pea gravel, or recycled RAP aggregate as trench backfill. 2) Maximum lift thickness is 8-inches before compaction. Compaction is 95 percent or greater relative to a standard proctor density, APWA Section 31 23 26. 3) Water jetting is NOT allowed. 4) Submission of quality control compaction test result data developed for haunching areas may be requested by ENGINEER at any time. Provide results of tests immediately upon request. B. Flowable Fill: When required, place controlled low strength material in the trench, APWA Section 31 05 15. Cure the fill before placing surface restorations. C. Surface Restoration: 1) Landscaped Surface: Rake to match existing grade. Replace vegetation to match pre-construction conditions. Follow APWA Section 32 92 00 (turf or grass) or APWA Section 32 93 13 (ground cover) requirements. 2) Paved Surface: Do not install asphalt or concrete surfacing until trench compaction is acceptable to ENGINEER. Follow APWA Section 33 05 25 (asphalt surfacing), or APWA Section 33 05 25 (concrete surfacing). a> 3Ld (v °o q<3 is 3V)Iq e Ld < b 55 o co z W.,i° z 8?8 $PAVEMENT RESTORATION (PLAN 255 OR 256) 1: 0 . 5 63 ’ 2 6 ' 1: 1 45 - 1: 1 . 5 hn si 26 * 3 4 ’ (TYP) /spoil' z EXISTING PAVEMENt 7 // // // / . PLANPLAN (ECCENTRIC RISER)(CONCENTRIC RISER) LANDSCAPE RESTORATION MAGNETIC MARKING TAPE MAX. DEPTH = 18" BELOW FINAL SURFACE ENCH CKFI (NO TRENCH BACKFILL (NOTE 3A) IF DEPTH OF TRENCH IS GREATER THAN 4 FEET AND SHORES OR TRENCH SUPPORTS ARE NOT USED, SLOPES ARE REQUIRED. SEE OSHA REGULATIONS FLOWABLE FILL ALLOWED ONLY TO THE TOP OF THE EXISTING SUBGRADE Oo$raO Hi PIPE ZONE (SEE DRAWINGS OR PLAN 382) FRAME AND COVER (PLAN 402)CONCRETE COLLAR (PLAN 413) FINISH GRADEY///////77> SHOWNGRADE RINGS ARE PLASTIC FORM IS ACCEPTABLE (PLAN 360) ALL AROUND THICKNESS 3/4" MINIMUM CONE AND RISERS ASTM C 478 REMOVE UPPER 1/3 OF PIPE AFTER MANHOLE IS COMPLETED.4 OR 5 FEET DIAMETER PROVIDE MORTAR SHELF WITH SLOPE OF 1.5’ IN 12" 2/3 D D base COURSE 6 DETERMINED BY FENGINEER 8 FINISH GRADE DETAIL UNIMPROVED AREAS RE V I S I O N S DA T E DE S C R I P T I O N 11 - 0 8 - 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s 1=-T 7T: SECTION A-A Plan 411 Plan 381 Sanitary sewer manholeTrench backfill 203 212202 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On 213April 2011January 2011 Direct bearing thrust block 1 1/2" PENTAGON OPERATING NUT (OPENS LEFT) PAINT BONNET PER AWWA C502 GREEN - CLASS 1 (1000 GPM OR GREATER) ORANGE - CLASS B (500 TO 1000 GPM) RED - CLASS C (LESS THAN 500 GPM) 1.5 FT MIN. fej B GRADE CONCRETE COLLAR (PLAN 574) iim imii PAINT SPOOLS SUP SLEEVE FASTEN GEOTEXTILE TO SPOOL WITH TAPE WRAP SEWER ROCK IN GEOTEXTILE THRUST BLOCK (PLAN 561)DRAIN HOLES (LOCATIONS VARY)D SEWER ROCK GREASE AND WRAP SPOOL GREASE AND WRAP WHEN SPOOL LENGTH IS GREATER THAN 16 FEET, VERIFY WITH AGENCY IF AN ADDITIONAL VALVE IS REQUIRED AT THE HYDRANT THRUST BLOCK (PLAN 561) Fire hydrant with valve 1. GENERAL A. Thrust design for pipe sizes or configurations not shown require special design. B. Bearing areas, volumes, and special thrust blocking details shown on Drawings take precedence over this plan. C. Restraint sizing is based upon a maximum operating pressure of 150 psi and a test pressure of 200 psi, and a minimum soil bearing strength of 2,000 psf. Operating pressures in excess of 150 psi or soils with less than 2,000 pound bearing strength will require special design. D. Before backfilling around thrust block, secure inspection of installation by ENGINEER. 2. PRODUCTS A. Base Course: Untreated base course, APWA Section 32 1 1 23. Do not use gravel as a base course without ENGINEER’S permission. B. Backfill: Common fill, APWA Section 31 05 13. Maximum particle size 2-inches. C. Thrust Bocks: Concrete Class 4000, APWA Section 03 30 04. D. Grease: Non-oxide poly-FM. 3. EXECUTION A. Pour concrete against undisturbed soil. B. Pipe Joints: Do not cover with concrete. Leave completely accessible. C. Grease: Apply grease to all buried metal surfaces. Wrap with polyethylene sheet and tape wrap. D. Locking restraint devices may be used in conjunction with concrete thrust blocking (at discretion of ENGINEER). E. Base Course and Backfill Placement: Maximum lift thickness is 8-inches before compaction. Compaction is 95 percent or greater relative to a modified proctor density, APWA Section 31 23 26. 1. GENERAL A. Before backfilling, secure inspection of installation by ENGINEER. B. Additional requirements are specified in APWA Section 33 11 00. De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H AP W A De t a i l s (TYP)BEARING AREA 2. PRODUCTS A. Hydrant: Dry barrel, AWWA C502. B. Thrust Bocks: Concrete Class 4000, APWA Section 03 30 04. C. Reinforcement: Deformed, 60 ksi yield grade steel, ASTM A 615. D. Backfill: APWA Section 31 05 13. Maximum particle size 2-inches. 1) Sewer Rock: ASTM Size No. 3 (2” to 1”) or larger. 2) Other Type of Common Fill: CONTRACTOR’S choice,. E. Geotextile: Stabilization-separation fabric, APWA Section 31 05 19. THE AREA OF BEARING PER THRUST BLOCK TO EQUAL 1/2 THE AREA SPECIFIED FOR THE LARGEST PIPE OR FITTING SIZE 3. EXECUTION A. Installation: 1 ) Provide at least 1 cubic yard of sewer rock around drain hole at base of hydrant spool. Wrap geotextile around sewer rock and tape geotextile to hydrant spool to prevent silting of sewer rock. 2) Paint fire hydrant to agency's fire hydrant paint code. 3) Apply non-oxide grease to all buried metal surfaces. Wrap with polyethylene sheet and tape wrap. 4) Notify fire department as soon as hydrant is placed in service. B. Thrust Blocks: 1) Before pouring concrete, wrap pipe system with polyethylene sheet to prevent bonding of concrete to pipe system. 2) Not required for flange or welded pipe systems. C. Backfill: Maximum lift thickness is 8-inches before compaction. Compaction is 95 percent or greater relative to a modified proctor density, APWA Section 31 23 26. MINIMUM BEARING AREA IN SQ. FT. SI Z E OF PI P E TE E S , VA L V E S DE A D EN D S 90 - BE N D S 45 * BE N D S 22 1/ 2 - BE N D S 11 1/ 4 - BE N D S 4"2 3 2 2 2 6"4 5.5 3 1.5 1 8"6.5 9.5 5 2.75 1.5 12’14 20 11 5.5 3 14"19 26.5 14.5 7.5 4 16"24 34 18.5 9.5 6 20’27 52 28.5 14.5 16 24"53 74 41 21 53 30"81 114 62 32 16 LEGEND No.»ITEM DESCRIPTION ®FIRE HYDRANT AWWA C502 VALVE BOX WITH UD 2-PIECE CAST IRON ©GATE VALVE WITH 2" X 2" NUT AWWA C509 ©TEE WITH 125 # FLANGE AWWA C110 isg// Wp328 1 gl J. NATE REEVE j S' Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 Number: ___8059—01 ___ 19 22 Total Sheets * FURNISHED BY UTILITY AGENCY SECTION Plan 561 Plan 511 Direct bearing thrust block 267 Fire hydrant with valve 237 236 August 2010February 201 1 THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT.Reeve & Associates, Inc. - Solutions You Can Build On Re e v e nc . d O n d On d On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S & As s o c i a t e s , In c . 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S 3/4" and 1" meter GENERAL A. In street surfaces or other vehicular traffic areas (like driveway approaches), Install the same type of meter box as required for 1 1/2" and 2” service meters. See Plan 522. B. Before backfilling, secure inspection of installation by ENGINEER. PRODUCTS A. Base Course: Untreated base course, APWA Section 32 1 1 23. Do not use gravel as a base course without ENGINEER’S permission. B. Backfill: Common fill, APWA Section 31 05 13. Maximum particle size 2-inches. C. Castings: Grey iron class 35 minimum per ASTM A 48, coated with asphalt based paint or better. EXECUTION A. Meter Placement: 1 ) All meters are to be installed in the park strip or within 7 feet of the property line (street side). 2) Do not install meters under driveway approaches, sidewalks, or curb and gutter. B. Meter Box: Set box so grade of the frame and cover matches the grade of the surrounding surface. C. Pipe Outside of Right-of-Way: Coordinate with utility agency or adjacent property owner for type of pipe to be used outside of right-of-way. D. Inspection: Before backfilling around meter box, secure inspection of installation by ENGINEER. E. Base Course and Backfill Placement: Compaction is 95 percent or greater relative to a modified proctor density, APWA Section 31 23 26. Maximum lift thickness before compaction is 8-inches. FRAME AND COVER WATER METERMETER BOX (B FR O S T LI N E + 12 ' OR 48 “ MI N I M U M BACKFILL ALL AROUND DO NOT PLACE ANY BACKFILL IN METER BOX CROSS-BAR REQUIRED E FLARED JOINTS DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s PIPE (NOTE 3) RE V I S I O N S SECTION LEGEND No.*ITEM DESCRIPTION ®FRAME AND COVER CAST IRON COVER (grass) DUCTILE IRON COVER (driveway) ®< 18 ’ T0 21 “ diameter)METER BOX ( 30 » T0 36* DEEP)CORRUGATED PE, PVC, CMP OR MATERIAL ACCEPTABLE TO AGENCY ©3/4" METER YOKE OPTIONAL BACKFLOW PROTECTION PER AGENCY REQUIREMENTS ©1* METER YOKE OPTIONAL BACKFLOW PROTECTION PER AGENCY REQUIREMENTS©COPPER PIPE TYPE K (SOFT) * FURNISHED BY UTILITY AGENCY Plan 521 Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On De l t a Cr o s s i n g Ph a s e 1 3/4” and T meter 239 00coc\ j August 2001 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H AP W A De t a i l s Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 Number: 8059—01 19.1 Total SheetsTHESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & /SSDOffiS, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, Inc. - Solutions You Can Build On Re e v e & A oc i a es , I n c . Re e v e ci c a ld O n ld On d On Re e v e & A s s o c i a t e s , I n c . - S o l u t i o n s Y o u C a n B u i l d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On £ <&* ua E Ixl !§ i! i LU *—CNCO §E oo S -J axnVI o/co s 750 N PROJECT SITE Vicinity Map NOT TO SCALE MCPHERS JOSEPH T MCPh HDPE SERIAL -/MOUNTAIN FUEL — SUPPLY CO SERIAL D— 3888— 5 SWPPP Legend PORTABLE TOILET INLET PROTECTION TYP SILT FENCE DETAIL)DELTA ESTATES 50’x20’ CONSTRUCTION ENTRANCE W/8” CLEAN GRAVEL TvWFf. CONCRETE WASH AREA (SEE DETAIL) OR AS SELECTED BY CONTRACTOR DELTA CROSSINGS Phase 1Storm Water Pollution Prevention Plan Exhibit DELTA CITY, MILLARD COUNTY, UTAH SEPTEMBER, 2023 cO 3 m §ug > t SL—• 5 I ' c<r Io III s CO(/} —< <0 0) >«VZ« w; I Hl A .HVLKtJ\' I3Y&328 J. NATE REEVE SWPPP NOTES: 1. ALL VEHICLES EXITING SITE TO PROCEED THROUGH CONSTRUCTION ENTRANCE TO REDUCE AMOUNTS OF SEDIMENT TRACKED ONTO ROADWAYS. 2. STREETS TO BE SWEPT WITHIN 1000 FEET OF CONSTRUCTION ENTRANCE DAILY IF NECESSARY Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 1608080 Scale: 1”80’ Construction Activity Schedule PROJECT LOCATION DELTA CITY, MILLARD COUNTY, (UT) PROJECT BEGINNING DATE SEPTEMBER 2023 BMP’S DEPLOYMENT DATE SEPTEMBER 2023 STORM WATER MANAGEMENT CONTACT / INSPECTOR MICHAEL ZURN (801) 808-1667 SPECIFIC CONSTRUCTION SCHEDULE INCLUDING BMP CONSTRUCTION SCHEDULE TO BE INCLUDED WITH SWPPP BY OWNER/DEVELOPER > Number: 8059—01 20 22 | Total SheetsTHESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build Or Re e v e nc . d O n uild On d On d O n RARA 01/17/2024 Reeve & Associates, Inc. - Solutions You Can Build On TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S * LA N D S C A P E AR C H I T E C T S & As s o c i a t e s , In c . 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S * CM L EN G I N E E R S * LA N D SU R V E Y O R S Notes Describe all BMP’s to protect storm water inlets: All storm water inlets to be protected by straw wattle barriers, or gravel bags (see detail). Describe BMP’s to eliminate/reduce contamination of storm water from: a. Equipment / building / concrete wash areas: ANCHOR THROUGH NETTING STORM DRAIN INLET GRAVEL BAGS GEOTEXTILE ATTACHED TO POST WOOD POST OR STAKE EXISTING GRADE SHEET FLOW ANCHOR THROUGH NETTINGLINE THE SIDE AND BOTTOM OF THE TRENCH WITH THE BOTTOM END OF THE FILTER FABRIC AND BACKFILL WITH To be performed in designated areas only and surrounded with silt fence barriers. b.Soil contaminated by soil amendments: If any contaminates are found or generated, contact environmental engineer and contacts listed c.Areas of contaminated soil: If any contaminates are found or generated, contact environmental engineer and contacts listed d. e. f. g- h. j- Fueling area: To be performed in designated Vehicle maintenance areas: To be performed in designated Vehicle parking areas: To be performed in designated Equipment storage areas: To be performed in designated Materials storage areas: To be performed in designated Waste containment areas: To be performed in designated Service areas: To be performed in designated areas only and surrounded with silt areas only and surrounded with silt areas only and surrounded with silt areas only and surrounded with silt areas only and surrounded with silt areas only and surrounded with silt areas only and surrounded with silt fence. fence. fence. fence. fence. fence. fence. EXCAVATED SOIL. SectionBMP’s for wind erosion: Stockpiles and site as needed to be watered regularly to eliminate / control wind erosion Construction Vehicles and Equipment: a. Maintenance — Maintain all construction equipment to prevent oil or other fluid leaks. — Keep vehicles and equipment clean, prevent excessive build-up of oil and grease. — Regularly inspect on— site vehicles and equipment for leaks, and repair immediately. — Check incoming vehicles and equipment (including delivery trucks, and employee and subcontractor vehicles) for leaking oil and fluids. Do not allow leaking vehicles or equipment on— site. — Segregate and recycle wastes, such as greases, used oil or oil filters, antifreeze, cleaning solutions, automotive batteries, hydraulic, and transmission fluids. b. Fueling — If fueling must occur on— site, use designated areas away from drainage. — Locate on— site fuel storage tanks within a bermed area designed to hold the tank volume. — Cover retention area with an impervious material and install in in a manner to ensure that any spills will be contained in the retention area. To catch spills or leaks when removing or changing fluids. — Use drip pans for any oil or fluid changes. c. Washing — Use as little water as possible to avoid installing erosion and sediment controls for the wash area. — If washing must occur on— site, use designated, bermed wash areas to prevent waste water discharge into storm water, creeks, rivers, and other water bodies. — Use phosphate— free, biodegradable soaps. — Do not permit steam cleaning on— site. Spill Prevention and Control a. Minor Spills: Minor spills are those which are likely to be controlled by on— site personnel. After contacting local emergency response agencies, the following actions should occur upon discovery of a minor spill: — Contain the spread of the spill. — If the spill occurs on paved or impermeable surfaces, clean up using ’’dry” methods (i.e. absorbent materials, cat litter, and / or rags). — If the spill occurs in dirt areas, immediately contain the spill by constructing an earth dike. Dig up and properly dispose of contaminated soil. — If the spill occurs during rain, cover the impacted area to avoid runoff. — Record all steps taken to report and contain spill. b. Major Spills: On— site personnel should not attempt to control major spills until the appropriate and qualified emergency response staff have arrived at the site. For spills of federal reportable quantities, also notify the National Response Center at (800) 424—8802. A written report should be sent to all notified authorities. Failure to report major spills can result in significant fines and penalties. Post Roadway / Utility Construction a. Maintain good housekeeping practices. b. Enclose or cover building material storage areas. c. Properly store materials such as paints and solvents. d. Store dry and wet materials under cover, away from drainage areas. e. Avoid mixing excess amounts of fresh concrete or cement on— site. f. Perform washout of concrete trucks offsite or in designated areas only. g. Do not wash out concrete trucks into storm drains, open ditches, streets or streams. h. Do not place material or debris into streams, gutters or catch basins that stop or reduce the flow of runoff water. i. All public streets and storm drain facilities shall be maintained free of building materials, mud and debris caused by grading or construction operations. Roads will be swept within 1000’ of construction entrance daily, if necessary. j. Install straw wattle around all inlets contained within the development and all others that receive runoff from the development. Erosion Control Plan Notes a. The contractor will designate an emergency contact that can be reached 24 hours a day 7 days a week. b. A stand-by crew for emergency work shall be available at all times during potential rain or snow runoff events. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of emergency devices when rain or runoff is eminent. c. Erosion control devices shown on the plans and approved for the project may not be removed without approval of the engineer of record. If devices are removed, no work may continue that have the potential of erosion without consulting the engineer of record. If deemed necessary erosion control should be reestablished before this work begins. d. Graded areas adjacent to fill slopes located at the site perimeter must drain away from the top of the slope at the conclusion of each working day. this should be confirmed by survey or other means acceptable to the engineer of record. e. All silt and debris shall be removed from all devices within 24 hours after each rain or runoff event. f. Except as otherwise approved by the inspector, all removable protective devices shown shall be in place at the end of each working day and through weekends until removal of the system is approved. g. All loose soil and debris, which may create a potential hazard to offsite property, shall be removed from the site as directed by the engineer of record of the governing agency. h. The placement of additional devices to reduce erosion damage within the site is left to the discretion of the engineer of record. i. Desilting basins may not be removed or made inoperable without the approval of the engineer of record and the governing agency. j. Erosion control devices will be modified as need as the project progresses and plans of these changes submitted for approval by the engineer of record and the governing agency. Perspective View Figure 2 Inlet Box Protection DA T E DE S C R I P T I O N 11 — 0 8 — 2 3 NF Ci t y Co m m e n t s 01 - 1 7 - 2 4 NF Ci t y Co m m e n t s should generally be less than three (3) times the height of the fence. ♦If a steel or plastic mesh is required to rein- force the geotextile, it shall have a minimum mesh opening of 15.2cm (6”). *Fasten the mesh to the upslope side of the posts using heavy duty wire staples, tie wires or hog strings. Extend the mesh into the bottom of the trench. *The geotextile shall then be stapled or wired to the posts. An extra 20-50cm (8-20”) of geotextile shall extend into the trench. INSPECTION ♦Inspect the silt fence daily during periods of rainfall, immediately after significant rainfall event and weekly during periods of no rainfall. Make any repairs immediately. ♦When sediment deposits behind the silt fence are one-third of the fence height, remove and properly dispose of the silt accumulations. Avoid damage to the fabric during cleanout. REMOVAL ♦Silt fence should not be removed until con- struction ceases and the upslope area has been properly stabilized and/or revegetated. INSTALLATION The silt fence should be installed prior to major soil disturbances in the drainage area. The fence should be placed across the slope along a line of uniform elevation wherever flow of sediment is anticipated. Table 1 shows generally-recommended maximum slope lengths (slope spacing between fences) at various site grades for most silt fence applications. RE V I S I O N S SEE STAKE DETAIL //// J||iFSTRAW WATTLE- SEE STAKE DE'’AIL STORM DRAIN DROP INLET TABLE 1: Recommended Maximum Slope Lengths for Silt Fence (Richardson & Middlebrooks, 1991) Slope Steepness (%) Max. Slope Length m (ft) <2%30.5m (100ft) 2-5%22.9m (75ft) 5-10%15.2m (50ft) 10-20%7.6m (25ft) >20%4.5m (15ft) Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On De l t a Cr o s s i n g Ph a s e 1 PREFABRICATED SILT FENCE ROLLS *Excavate a minimum 15.2cm x 15.2cm (6”x6”) trench at the desired location. ♦Unroll the silt fence, positioning the post against the downstream wall of the trench. *Adjacent rolls of silt fence should be joined be nesting the end post of one fence into the other. Before nesting the end posts, rotate each post until the geotextile is wrapped completely around the post, then abut the end posts to create a tight seal as shown in Figure 1. *Drive posts into the ground until the required fence height and/or anchorage depth is obtained. ♦Bury the loose geotextile at the bottom of the fence in the upstream trench and backfill with natural soil, tamping the backfill to provide good compaction and anchorage. Figure 2 illustrates a typical silt fence installation and anchor trench placement. Pr e v e n t i o n Pl a n De t a i l s St o r m Wa t e r Po l l u t i o n Posts Section A DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H Plan View Figure 1: Top View of Roll— to— Roll Connection STORM DRAIN DROP INLET STRAW WATTLE- FIELD ASSEMBLY: ♦Excavate a minimum 15.2cm x 15.2cm (6”x6”) trench at the desired location. ♦Drive wooden posts, or steel posts with fasten- ing projections, against the downstream wall of the trench. Maximum post spacing should be 2.4-3.0m (8- 10ft). Post spacing Silt Fence Detail SCALE: NONE Drop Inlet Protection 10 MIL PLASTIC LINER 2 TO 1 SLOPE3HIGH BERM 14’ WOOD STAKE STRAW WATTLE- FLOW WOOD STAKE STRAW WATTLE- r I3V5328 J. NATE REEVE Conduct a minimum of one inspection of the erosion and sediment controls every two weeks. Maintain documentation on site. a. Part III.D.4 of general permit UTRC00000 identifies the minimum inspection requirements. b. Part II.D.4.C identifies the minimum inspection report requirements. c. Failure to complete and/or document storm water inspections is a violation of part III.D.4 of Utah General Permit UTR 300000. Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. FICKLIN Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 50’x20’ CONSTRUCTION ENTRANCE Stake Detail W/ 8” CLEAN 2”— 4” 0 GRAVEL BASE OVER WOVEN GEOTECH FABRIC Concrete Washout Area w/ 10 mil Plastic Liner SCALE: NONE Number: 8059—01 Cross Section 50’ x 2O r Construction Entrance 21 22 Total SheetsOR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY LIABILITY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, Inc. - Solutions You Can Build THESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, e , I n c . d O n ld On ld On d O n RARA 01/17/2024 Reeve & Associates, Tnc. - Solutions You Can Build On 1 10 EX-tOHP _EXXiHP EX. OHP EX.OHP EX.OHP IRR/30'30IRR/30—>0 IRR/30 IRR/30-• IRR/30 r - —IRR/jQ ------IRR/30-———1R r /30IRR/30- Avoid Planting over existing irrigation pipe OPEN SPACE/RETENTI Re e v e & As s o c i a t e s , I 51 6 0 SO U T H 15 0 0 WE S T , RI V E R D A L E , UT A H 84 4 0 5 TE L : (8 0 1 ) 62 1 - 3 1 0 0 ww w . r e e v e . c o LA N D PL A N N E R S ♦ CI V I L EN G I N E E R S * LA N D SU R V E Y O R S TR A F F I C EN G I N E E R S * ST R U C T U R A L EN G I N E E R S ♦ LA N D S C A P E AR C H I T E C T S PLANT TABLE TREES Quantity Symbol Scientific Name Common Name Size 8 Celtis occidentalis Common Hackberry 2” cal. 5 Gleditsia triacanthos ’Imperial’Imperial Honey Locust 2” cal. 8 Pinus nigra Austrian Pine 6’ Ht OTHER Symbol Description Type Turf Grass - Sod Kentucky Bluegrass Mix — 3 Species Minimum Sod Avoid Planting under power line RE V I S I O N S DA T E DE S C R I P T I O N Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On Re e v e & As s o c i a t e s , In c . - So l u t i o n s Yo u Ca n Bu i l d On 20 40 20Scale: 1 Re t e n t i o n Ba s i n La n d s c a p e De l t a Cr o s s i n g Ph a s e 1 DE L T A CI T Y , MI L L A R D CO U N T Y , UT A H 20 0 60 PLANTING NOTES 1. This planting plan is diagrammatic and plant locations are approximate. Contractor to verify all quantities and do their own takeoffs. 2. Field survey, stake, and string the layout and locations of site construction features for approval before actual construction. The layout shall conform to the exact location and grades of the intended work to be done. 3. Coordinate all aspects of the planting plans with the irrigation system and call the attention of the owners representative to any conflict in placement of plants in relation to sprinkler heads, lines and valves at the time the landscape installation phase takes place. 4. Finish grade of soil in lawn areas shall be 2” below pads, walks, paving, headers and curbs to accommodate sod. Grades in areas when seeded shall be 1” lower than adjacent edge. 5. Native topsoil shall be stockpiled and stored on site whenever possible for use in landscape areas. 6. All sod areas shall receive a minimum 4” depth of native topsoil and shrub beds shall receive a minimum of 8” of native topsoil. 7. Imported topsoil, when required, shall come from a reputable source, have a loam consistency and be free of weeds and debris. 8. Face each shrub to give the most pleasing look as seen from a line perpendicular to the wall or walk to/from which it is viewed. 9. Edging or Curbing shall be installed as shown on the plan to separate grass from shrub beds. 10. Shrub beds shall drain properly to prevent standing water from occurring. Call improperly draining planters or planting beds to the attention of the owners representative before planting. Provide positive drainage away from all structures and walls. Slope landscape areas 2% minimum. 11. Place mulch in all shrub beds and perennial areas. See schedule for depth and type. Do not crowd out small perennial plants with excessive mulch. 12. Provide a 3’ minimum diameter circle ’’tree ring” around trees that are placed within lawn areas. Place a 3” min. depth of mulch. Use shredded bark mulch or match mulch being used for shrub beds. 13. The contractor shall maintain all work until work is complete and accepted by the Owner. The contractor shall maintain and guarantee all work for a period of THIRTY DAYS from the date of final acceptance by the Owner. Maintenance shall include mowing, weeding, fertilizing and irrigating. PRUNE ALL DEAD AND INJURED WOOD. DO NOT CUT LEADER. 2 METAL T-POSTS, 2 PER TREE. REMOVE POSTS & TIES AFTER ONE YEAR. CONSTRUCT 4” EARTH BERM SAUCER. FILL WITH BARK/ROCK MULCH. AWAY FROM TRUNK. SAUCER AFTER ONE 3” BRUSH REMOVE YEAR. REMOVE BURLAP/PACKAGING MAT. PLANT TREES 2”-3” HIGHER THAN GRADE. BACKFILL WITH NATIVE SOIL UNDISTURBED SOIL LOOSELY TIE TO ALLOW FOR TREE MOVEMENT, BUT SECURED FOR HIGH WIND CONDITIONS. 66 PETERSON Project Info. Engineer: J. NATE REEVE, P.E. Drafter: N. PETERSON Begin Date: SEPTEMBER, 2023 Name: DELTA CROSSING PHASE 1 NOTE:DIG HOLE THREE TIMES THE WIDTH AND AS DEEP AS ROOTBALL, EXCEPT WHERE NOTED. Number: 8059—01DECDDOOyS =TREE FLAMTM NTS 22 22 Total SheetsTHESE PLANS AND SPECIFICATIONS ARE THE PROPERTY OF REEVE & ASSOCIATES, INC., 5160 SOUTH 1500 WEST, RIVERDALE, UTAH 84405, AND SHALL NOT BE PHOTOCOPIED, RE-DRAWN, OR USED ON ANY PROJECT OTHER THAN THE PROJECT SPECIFICALLY DESIGNED FOR, WITHOUT THEIR WRITTEN PERMISSION. THE OWNERS AND ENGINEERS OF REEVE & ASSOCIATES, INC. DISCLAIM ANY UABIUIY FOR ANY CHANGES OR MODIFICATIONS MADE TO THESE PLANS OR THE DESIGN THEREON WITHOUT THEIR CONSENT. Reeve & Associates, - Solutions You Can Build Or