HomeMy WebLinkAboutDAQ-2024-004639]D
]TIcWANE
DUCTILE
McWane Ductile - Utah
PO Box 1219
2550 South Industrial Parkway
Provo, Utah 84601
801.373.6910
www.mcwaneductile.com
TO:
FROM:
RE:
DATE:
IRON STRONG
McWane Ductile - Utah
Semi-Annual Monitoring Report for Title V Permit #49OOOL7OO4
January LOt 2023
In accordance with Title V Operating Permit provision I.S.2.a, and Utah Administrative Code (UAC)
R307-4 1 5-6a(3) (c) (i), the following mon itori ng report is su bmitted.
This report covers the period from 07/OU2O23 to L2l3Ll2O23.
For the indicated reporting period:
g There were no deviations from any permit requirements.
Attached is a list of permit requirements for which there were deviations. The list includes
tr the information required by Operating Permit provision I.S.2.a, and UAC R3O7-415-
6a(3)(c)(i).
n In lieu of attaching the above list, deviation reports submitted in accordance with permit
provision I.S.2.c, and UAC R307-415-6a(3)(c)(ii) are referenced below.
There were no excursions or exceedances during the monitoring period (CO CAM Plan).
There was at least one excursion or exceedance and required information from condition
II.8.2.a.3(a)(1) are provided below.
Date T-Ype Cause CorrectiveAction
In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information
and belief formed after reasonable inquiry, I certify that the statements and information in this
document are true, accurate, and complete.
t/ ro /r+
EI
tr
nt, General Manager
McWane Ductile - Utah
- WNU DEPARI MEN:I OF
E NV I RC I'r l'"4 F- NTA l. QIUIIIYi:--' -*=*lii:ll
IlrL__.-- ---J
B-2-10794