HomeMy WebLinkAboutDAQ-2024-0049991
DAQC-142-24
Site ID 10617 (B4)
MEMORANDUM
TO: STACK TEST FILE – HOLLIDAY CONSTRUCTION INCORPORATED –
Bluff Pit
THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager
FROM: Paul Bushman, Environmental Scientist
DATE: February 14, 2024
SUBJECT: Sources: One (1) 400 kW Diesel Generator (II.A.7)
Contact: Jason Holliday: (435) 979-5351
Location: 4 miles west of Bluff at the intersection of U.S. Routes 163 and
191
Test Contractor: Alliance Technical Group, LLC
Permit/AO#: DAQE-AN106170002-15 dated November 5, 2015
Action Code: TR
Subject: Review of stack test report received February 8, 2024
On February 8, 2024, Utah Division of Air Quality (DAQ) received a test report for one (1) 400 kW
diesel generator engine at Holliday Construction Incorporated’s Bluff Pit, San Juan County, UT. Testing
was performed October 11, 2023, to demonstrate compliance with the emission limits found in condition
40 CFR 63, Subpart ZZZZ. The calculated test results are:
Source Test Date Pollutant Method Tester Results Limits
400 kW
Generator
Engine
October 11,
2024 CO 10 29.91 ppmvd @ 15%
O2
23 ppmvd @ 15%
O2
DEVIATIONS: The stack test was canceled after the first run when it was noted that the
emissions were beyond the emission limit found in subpart ZZZZ.
CONCLUSION: The stack test report appears to be incomplete.
RECOMMENDATION: The emissions from the 400 kW diesel generator engine should be
considered to have been out of compliance with the emission limits of 40
CFR 63, Subpart ZZZZ during testing. An Early Settlement Agreement
(DAQC-038-24) was sent on January 17, 2024, for the failed stack test,
which was originally reported on January 12, 2024. A response is
expected by February 20, 2024.
ATTACHMENTS: Holliday Construction Incorporated stack test report.
2