Loading...
HomeMy WebLinkAboutDSHW-2024-006231CORRECTIVE ACTION SECTION – SITE VISIT REPORT SITE NAME: Sandy Mall/One Hour Cleaners DATE: __05__/__09__/_2024_______ EPA ID #: UTD056094774 _________________________ UTCA ID#:_N/A _________________ LOCATION: 9467 South 700 East, Sandy, Utah __________________________________ PROJECT MANAGER: _Ethan Upton ______________________________________________________ SITE STATUS ___ Active Investigation ___Ongoing Cleanup Activities ___Confirmation Sampling _X_ Long-term Institutional Controls in-place [Site Management Plan (SMP), Environmental Covenant (EC), and/or Post Closure Plan (PCP)] ___ Long-term Groundwater Monitoring OTHER (describe): PURPOSE OF SITE VISIT _X_Drive-by (windshield survey) ___Sample Observation &/or Collection ___Site Investigation ___Cleanup Activities Inspection _X_Confirm Current Land Usage ___ Confirm Cleanup Completed ___ Confirm Integrity of Engineering Controls _X_ Confirm Compliance with SMP/EC D2# for SMP/EC: DSHW-2020-006461, DSHW-2020- 006461 ___ Post-Closure Permit Verification ___ Document Change in Land Usage OTHER (describe) FIELD OBSERVATIONS: Site continues to be used for commercial purposes. Site currently appears to be occupied by Bliss Nails and Spa. SAMPLE COLLECTION Were Environmental Samples Collected per the approved Sampling & Analysis Plan? YES ___ NO ___ N/A _X_ COMMENTS: Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)? YES ___ NO ___ N/A _ X_ Unknown (Drive-By Inspection Only) ___ COMMENTS: CURRENT LAND USAGE ___ Residential _X_ Commercial ___ Industrial ___ Mixed Commercial w/ Residential ___ Under Construction &/or Development ___ Other: __________________________________ COMMENTS: FUTURE LAND USAGE ___ Residential ___ Mixed Commercial w/ Residential _X_ Commercial ___ Other: (describe below) ___Industrial ___ Unknown at this time COMMENTS: POST-CLEANUP SITE VISITS Is the Completed Cleanup Remedy Still Protective Based on Current Land Use? YES ___ NO ___ Unknown (Drive-By Inspection Only) _X_ COMMENTS: LONG-TERM INSTITUTION CONTROL(S) VERIFICATION Are Components or Restrictions of the SMP, EC &/or PCP Currently Being Complied with? YES _X_ NO ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: SITE VISIT CONCLUSIONS Property appears to be in compliance with the Site Management Plan and Environmental Covenant. RECOMMENDATIONS N/A ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES _X_ NO ___ SIGNATURE: