HomeMy WebLinkAboutDAQ-2024-004974LINATEX'
Rubber Products
3459 South 700 West
Salt Lake City, UT 84119
Excellent
Minerals
Solutions
IITEIRn$mil
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
|anuary 26,2024
Division of Air Quality
Compliance Section
PO Box L44820
Salt Lake City, UT B4Lt4-4820
UTAH DEPARTMEI.IT OF
ENVIRONMENTAL OUALITY
\^,AFIMANO
Centrifugal Slurry Purnps
CliEHclO
PD Slurry Pumps
LINATEXO
Rubber Products
VULCO@
Wear Resistant Linings
CAVEXO
Hydrocyclones
FLOWAYO
PUMPS
Vertical Turbine Pumps
IgiCTGATEO
Slurry Valves
MULTIFLcl6
Mine Dewatering Solutions
HAZLETc,NO
Specialty Slurry Pumps
LEWISo PUMPS
Vertical Chemical Pumps
\^,EIFI
MINEtrALSi
SEFIVICES*
DIVISION OF AIR OUALITV
Re: Semi-Annual Monitoring Report, Title V Permit No. 3500210005
To Whom It May Concern:
The Semi-Annual Monitoring report required by section I.S.2.a of the Title
V Operating Permit # 350021005 for the reporting period October 'J.,2023
through December 3t,2023 is hereby submitted.
Please contact me if you have any questions concerning these reports.
Sincerely,
Cc: EPA Region VIII
Director of Operations
REVIEWED
Initials JBR Date 2/27/2024
Comp Status Meets
File # 10555 Blue 2
5D boilers no dev. rpt has 7-1 to 12/31/23
cover page is incorrect. Company
confirmed
PERIODIC MONITORING REPORT
Executive Secretary, Utah Air Quality Board
Weir Minerals.
January 26,2024
TO:
FROM:
DATE:
I[Ctf,IfiIITfi[Til
WAFlMANO
Centrifugal Slurry Punrps
Excellent
Minerals
Solutions
GEHOO
PD Slurry Pumps
LINATEX€,
Rubber Products
VULGOO
Wear Resistant Linings
CAVEXO
Hydrocyclones
FLclWAYE
PUMPS
Vertical Turbine Pumps
ISi(fGiATE@
Slurry Valves
MULTIFLCI6
Mine Dewatering Solutions
HAZLETc)NO
Specialty Slurry Pumps
LE\,vISi@ PUMPS
Vertical Chemical Pumps
WEIFl
MINEFIALS
SEFIVICES'"
)x):, i
I
- ------l
ln accordance with Operating Permit provision l.S.2.a and Utah Administrative
Code (UAC) R307-415-6a(3)(c) (i), the following periodic monitoring report is
submitted.
The report covers the period from 101112023 through 1213112023.
For the indicated reporting period:
For the indicated reporting period:
x There were no deviations from any permit requirements.
c Attached is a list of permit requirements for which there were
deviations. The list includes the information required by Operating
Permit provision LS.2.a and UAC R307-415-6a(3)(c)(ii).
tr ln lieu of attaching the above list, deviation reports submitted in
accordance with permit provision l.S.2.c and UAC R307-415-
6a(3)(c)(ii) are referenced below.
ln accordance with Operating Permit provision l.K and UAC R307-415-5d and
based on information and belief formed after reasonable inquiry, I certify that
the statements and information in this document are true accurate and
complete.
, .iEFPA@'l:lfir;-
RO-N!1rL-IJI'-Y " :- ::','
i
i
I
I
I
I
I
I
I
rl-.1f f rl
January 29,2024
Utah Division of Air Quality
Compliance Section
PO Box 144820
Salt Lake City, UT 84114-4820
Re: Subpart DDDDD Boiler Compliance Report, Permit No.350021000s
Title V Operating Permit No. 3500210005
Phone 801.574.2189
Email Al.Haley@mail.weir
SEMI-ANNUAL COMPLIANCE REPORT
The Serni-Annual Compliance Report, required by section 63.7550(c) of 40 CFR Part 63,
Subpart DDDDD - National Emission Standards for Hazardous Air Pollutants for Major
Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters is hereby
submitted.
Please contact me if you have any questions conceming this submittal.
l. Weir Minerals, Inc.
Al Haley
3459 South 700 West
Salt Lake city, uT 84119
2. Report Date: January 29,2024
3. Reporting Period: I July 2023 - 31 December}123
4. Weir Minerals, [nc. certifies that the North Steam Boiler (Title V Permit II.B.7) and
the South Steam Boiler (Title V Permit II.B.8) were operated with no deviations. There
were no deviations from the emission limitations and work practice standards during the
reporting period.
This report has been generated to comply with 40 CFR 63.7550 c(1), which specifies that
for boilers that are:
"subject to the requirements of a tune up you must submit a compliance report
with the information in paragraphs (cXsXi) through (iii) of this section, (xiv) and
(xvii) of this section, and paragraph (c)(s)(iv) of this section for limited-use boiler
or process heaters."
DIVISION OF AIR OUAI-ITY
January 29,2024 Page2 of 3
Compliance Report, Title V Permit No. 3500210005
NORTH STEAM BOILER
4a) Permit Condition II.B.7.a 1: Emissions of NO* shall be no greater than 2.18
lbsftrour and no greater than 1,25 ppmdv (7o/o oxygen, Dry).
S-year Stack Tests have certified that the North Boiler was operated within these
limits.
4b) Permit Condition II.B.7.b1: Visible emissions shall be no greater than 10 percent
opacity. II.B.7.b.l Monitoring: In lieu of monitoring via visible emission observations,
fuel usage shall be monitored to demonstrate that only natural gas is used as fuel.
No fuel other than natural gas has been consumed by the North Steam Boiler.
4c) The date of the most recent boiler tune up was 7 /2112023.
4d) The total operating time of the unit was 8.760 hours.
4e) Since the boiler cannot accept fuel other than natural gas, and no deviations to
operating conditions were noted, the following sections of 40 CFR 63.7550, as described
in the standard, were met: (c)(5)(i) through (iii), (vi), (vii), (viii), (ix), (xi), (xiii), (xv),
(xvii), (xviii) and paragraph (d).
SOUTH STEAM BOILER
4a) Permit Condition II.B.8.a 1: Emissions of NO* shall be no greater than 1.87
lbs/trour and no greater than 124 ppmdv (7oh oxygen, Dry).
S-year Stack Tests have certified that the South Boiler was operated within these
limits.
4b) Permit Condition II.B.8.b1: Visible emissions shall be no greater than 10 percent
opacity. II.B.8.b.1 Monitoring: In lieu of monitoring via visible emission observations,
fuel usage shall be monitored to demonstrate that only natural gas is used as fuel.
No fuel other than natural gas has been consumed by the South Steam Boiler.
4c) The date of the most recent boiler tune up was 51612023.
4d) The total operating time of the unit was 8.760 hours.
4e) Since the boiler cannot accept fuel other than natural gas, and no deviations to
operating conditions were noted, the following sections of 40 CFR 63.7550, as described
in the standard, were met: (c)(SXi) through (iii), (vi), (vii), (viii), (ix), (xi), (xiii), (xv),
(xvii), (xviii) and paragraph (d).
GENERAL - Access limited to Weir Personnel or by NDA
January 29,2024
Compliance Report, Title V Permit No. 3500210005
Page 3 of3
Certffication
In accordance with Title V Permit 3500210005 and as specified in 40 CFR
63.7550(c)(5)(xvii) and based on information and belief formed after reasonable inquiry,
I certiS that the statements and information in this document are true, accurate, and
complete.
Official for the Source
GENERAL - Access limited to Weir Personnel or by NDA