Loading...
HomeMy WebLinkAboutDAQ-2024-004974LINATEX' Rubber Products 3459 South 700 West Salt Lake City, UT 84119 Excellent Minerals Solutions IITEIRn$mil CERTIFIED MAIL RETURN RECEIPT REQUESTED |anuary 26,2024 Division of Air Quality Compliance Section PO Box L44820 Salt Lake City, UT B4Lt4-4820 UTAH DEPARTMEI.IT OF ENVIRONMENTAL OUALITY \^,AFIMANO Centrifugal Slurry Purnps CliEHclO PD Slurry Pumps LINATEXO Rubber Products VULCO@ Wear Resistant Linings CAVEXO Hydrocyclones FLOWAYO PUMPS Vertical Turbine Pumps IgiCTGATEO Slurry Valves MULTIFLcl6 Mine Dewatering Solutions HAZLETc,NO Specialty Slurry Pumps LEWISo PUMPS Vertical Chemical Pumps \^,EIFI MINEtrALSi SEFIVICES* DIVISION OF AIR OUALITV Re: Semi-Annual Monitoring Report, Title V Permit No. 3500210005 To Whom It May Concern: The Semi-Annual Monitoring report required by section I.S.2.a of the Title V Operating Permit # 350021005 for the reporting period October 'J.,2023 through December 3t,2023 is hereby submitted. Please contact me if you have any questions concerning these reports. Sincerely, Cc: EPA Region VIII Director of Operations REVIEWED Initials JBR Date 2/27/2024 Comp Status Meets File # 10555 Blue 2 5D boilers no dev. rpt has 7-1 to 12/31/23 cover page is incorrect. Company confirmed PERIODIC MONITORING REPORT Executive Secretary, Utah Air Quality Board Weir Minerals. January 26,2024 TO: FROM: DATE: I[Ctf,IfiIITfi[Til WAFlMANO Centrifugal Slurry Punrps Excellent Minerals Solutions GEHOO PD Slurry Pumps LINATEX€, Rubber Products VULGOO Wear Resistant Linings CAVEXO Hydrocyclones FLclWAYE PUMPS Vertical Turbine Pumps ISi(fGiATE@ Slurry Valves MULTIFLCI6 Mine Dewatering Solutions HAZLETc)NO Specialty Slurry Pumps LE\,vISi@ PUMPS Vertical Chemical Pumps WEIFl MINEFIALS SEFIVICES'" )x):, i I - ------l ln accordance with Operating Permit provision l.S.2.a and Utah Administrative Code (UAC) R307-415-6a(3)(c) (i), the following periodic monitoring report is submitted. The report covers the period from 101112023 through 1213112023. For the indicated reporting period: For the indicated reporting period: x There were no deviations from any permit requirements. c Attached is a list of permit requirements for which there were deviations. The list includes the information required by Operating Permit provision LS.2.a and UAC R307-415-6a(3)(c)(ii). tr ln lieu of attaching the above list, deviation reports submitted in accordance with permit provision l.S.2.c and UAC R307-415- 6a(3)(c)(ii) are referenced below. ln accordance with Operating Permit provision l.K and UAC R307-415-5d and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true accurate and complete. , .iEFPA@'l:lfir;- RO-N!1rL-IJI'-Y " :- ::',' i i I I I I I I I rl-.1f f rl January 29,2024 Utah Division of Air Quality Compliance Section PO Box 144820 Salt Lake City, UT 84114-4820 Re: Subpart DDDDD Boiler Compliance Report, Permit No.350021000s Title V Operating Permit No. 3500210005 Phone 801.574.2189 Email Al.Haley@mail.weir SEMI-ANNUAL COMPLIANCE REPORT The Serni-Annual Compliance Report, required by section 63.7550(c) of 40 CFR Part 63, Subpart DDDDD - National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters is hereby submitted. Please contact me if you have any questions conceming this submittal. l. Weir Minerals, Inc. Al Haley 3459 South 700 West Salt Lake city, uT 84119 2. Report Date: January 29,2024 3. Reporting Period: I July 2023 - 31 December}123 4. Weir Minerals, [nc. certifies that the North Steam Boiler (Title V Permit II.B.7) and the South Steam Boiler (Title V Permit II.B.8) were operated with no deviations. There were no deviations from the emission limitations and work practice standards during the reporting period. This report has been generated to comply with 40 CFR 63.7550 c(1), which specifies that for boilers that are: "subject to the requirements of a tune up you must submit a compliance report with the information in paragraphs (cXsXi) through (iii) of this section, (xiv) and (xvii) of this section, and paragraph (c)(s)(iv) of this section for limited-use boiler or process heaters." DIVISION OF AIR OUAI-ITY January 29,2024 Page2 of 3 Compliance Report, Title V Permit No. 3500210005 NORTH STEAM BOILER 4a) Permit Condition II.B.7.a 1: Emissions of NO* shall be no greater than 2.18 lbsftrour and no greater than 1,25 ppmdv (7o/o oxygen, Dry). S-year Stack Tests have certified that the North Boiler was operated within these limits. 4b) Permit Condition II.B.7.b1: Visible emissions shall be no greater than 10 percent opacity. II.B.7.b.l Monitoring: In lieu of monitoring via visible emission observations, fuel usage shall be monitored to demonstrate that only natural gas is used as fuel. No fuel other than natural gas has been consumed by the North Steam Boiler. 4c) The date of the most recent boiler tune up was 7 /2112023. 4d) The total operating time of the unit was 8.760 hours. 4e) Since the boiler cannot accept fuel other than natural gas, and no deviations to operating conditions were noted, the following sections of 40 CFR 63.7550, as described in the standard, were met: (c)(5)(i) through (iii), (vi), (vii), (viii), (ix), (xi), (xiii), (xv), (xvii), (xviii) and paragraph (d). SOUTH STEAM BOILER 4a) Permit Condition II.B.8.a 1: Emissions of NO* shall be no greater than 1.87 lbs/trour and no greater than 124 ppmdv (7oh oxygen, Dry). S-year Stack Tests have certified that the South Boiler was operated within these limits. 4b) Permit Condition II.B.8.b1: Visible emissions shall be no greater than 10 percent opacity. II.B.8.b.1 Monitoring: In lieu of monitoring via visible emission observations, fuel usage shall be monitored to demonstrate that only natural gas is used as fuel. No fuel other than natural gas has been consumed by the South Steam Boiler. 4c) The date of the most recent boiler tune up was 51612023. 4d) The total operating time of the unit was 8.760 hours. 4e) Since the boiler cannot accept fuel other than natural gas, and no deviations to operating conditions were noted, the following sections of 40 CFR 63.7550, as described in the standard, were met: (c)(SXi) through (iii), (vi), (vii), (viii), (ix), (xi), (xiii), (xv), (xvii), (xviii) and paragraph (d). GENERAL - Access limited to Weir Personnel or by NDA January 29,2024 Compliance Report, Title V Permit No. 3500210005 Page 3 of3 Certffication In accordance with Title V Permit 3500210005 and as specified in 40 CFR 63.7550(c)(5)(xvii) and based on information and belief formed after reasonable inquiry, I certiS that the statements and information in this document are true, accurate, and complete. Official for the Source GENERAL - Access limited to Weir Personnel or by NDA