Loading...
HomeMy WebLinkAboutDDW-2024-006049 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF DRINKING WATER Nathan Lunstad, P.E. Director January 23, 2024 Bonner Hardgree Fruitland Water SSD H.C. 63 Box 270130 Fruitland, Utah 84027 Subject: Notice of Increased Monitoring for Fruitland Water SSD; UTAH07058 Dear Bonner Hardgree: On January 16, 2024, the Division of Drinking Water (the Division) spoke with Fruitland Water SSD about their source monitoring requirements. In that discussion, it was disclosed that the Little Red Spring (identified as WS003 in the Division’s database) serves several connections prior to mixing with the Mill Hollow Lower Spring (WS002) and Mill Hollow Upper Spring (WS001) in the distribution system. Given this, the Little Red Spring (WS001) no longer qualifies to be sampled at the group sample station (SS968) comprised of both the Upper and Lower Mill Hollow Springs. The Little Red Spring is now required to be sampled as a stand-alone source prior to the first connection served. Considering that many of these parameters have not been evaluated at the Little Red Spring since 2005, the routine monitoring frequencies for these parameters will be determined once the initial results have been received and reviewed. The following tests are due by July 31, 2024. Facility with new requirements Analyte Required # Of samples Sampling Frequency Next Due Date Rule Reference WS003 Little Red Spring Inorganics and Metals 1 A 07/31/2024 R309-205-5(3)(a) Nitrate 1 A 07/31/2024 R309-205-5(4)(a) Radionuclides 1 A 07/31/2024 R309-205-7(1)(b) Sulfate, Sodium, TDS 1 A 07/31/2024 R309-205-5(3)(a) Volatile Organics 1 A 07/31/2024 R309-205-6(2) A-Routine Frequency to be determined following initial sample results. Bonner Hardgree Page 2 of 2 January 23, 2024 You will find a current copy of your complete monitoring schedule at waterlink.utah.gov by selecting your system and then selecting Water Monitoring under Water System Reports. Thank you for your efforts in maintaining a safe drinking water system. If you have questions concerning your sampling requirements, please contact David Kruse at 385-566-7789 (dbkruse@utah.gov). Sincerely, Mark Berger Monitoring and Standards Implementation Manager cc: Bonner Hardgree, Fruitland Water SSD, fssd@ubtanet.com Cindy Austreng, Tri-County Health Department, caustreng@tricountyhealth.com Nathan Hall P.E., District Engineer, nhall@utah.gov Mark Berger, Division of Drinking Water, mberger@utah.gov David Kruse, Division of Drinking Water, dbkruse@utah.gov