HomeMy WebLinkAboutDDW-2024-006012Contacts
Type: Administrative Contact
Name: SPENCER BATEMAN
Office: 801-888-6711
Emergency:
Email:
bmffarmsap@gmail.com
Site Information
Legal Contact: BATEMANS MOSIDA
FARMS
Address: PO Box 119 , ELBERTA, UT
84626
Phone: 801-420-2819
County: UTAH COUNTY
System Type: Community
Certification Required: SS
Total Population: 90
Site Updates
Last Inventory Update: 09/06/2022
Last Surveyor Update: 08/08/2023
Surveyor: CHRIS MARTIN
Operating Period: 1/1 - 12/31
Last IPS Update: 10/26/2023 14:10:00
Political Districts
Representative: 0
Senate: 0
Water Usage Information per ERC
Total Ips Points: 1940
Public Water System IPS ReportDEQ | Drinking Water
Batemans Mosida Farms PWS ID: UTAH25184 Rating: Corrective Action 04/24/2020 Status: Active
IPS SUMMARY Total IPS Points: 1940
Admin & Physical Facilities Quality & Monitoring Significant Deficiency Violations
1190 150 600
PHYSICAL FACILITY POINTS Total Pts: 1190
Facility Facility Name Status Points Effective Details
DS001 UTAH25184 DISTRIBUTION SYSTEM A 115 Hide Details ( 5 )
Code Description Severity Comments Determined
Date Pending Assessed
C001
SYSTEM DIRECT
RESPONSIBLE
CHARGE OPERATORS
NOT CERTIFIED AT
THE REQUIRED LEVEL
SIG Small System Direct Responsible Charge (DRC) operator
required.03/24/2023 0 50
M007
CCC-LACKS ON-
GOING
ENFORCEMENT
IMPLEMENTATION
MIN DUE 6/23/2020 12/23/2019 0 15
G001 UNAPPROVED
FACILITY IN SERVICE SIG DUE FOR ALL FACILITIES 12/23/2020 12/23/2019 0 50
D003
DIST SYSTEM UNABLE
TO PROVIDE 20 PSI
MIN PRESSURE FOR
WATER LINES
CONSTRUCTED
BEFORE JAN 1, 2007
SIG
Unknown, however, likely not since two homes have a
booster pump. These pumps are considered under control
of the water system; therefore, they would need to be
inventoried.
08/08/2023 50 0
M008
SERVICE
CONNECTIONS IN
DISTRIBUTION
SYSTEM RELY ON
INDIVIDUAL HOME
BOOSTER PUMP DUE
TO INADEQUATE
PRESSURE
SIG SYSTEM HAS AT LEAST 2 HOME BOOSTER PUMPS 08/08/2023 50 0
PHYSICAL FACILITY POINTS Total Pts: 1190
Facility Facility Name Status Points Effective Details
ST002 STORAGE TANK #2 A 15 Hide Details ( 1 )
Code Description Severity Comments Determined
Date Pending Assessed
V008
TANK ACCESS
HEIGHT LESS THAN
4 INCHES ABOVE
TANK ROOF OR
LESS THAN 18
INCHES ABOVE
EARTHEN COVER
MIN
System needs to apply for an exception if this tank is utilized
within the drinking system. It is a circular bolted opening
located about 2-ft above ground.
08/08/2023 0 15
WS001 WELL #1 - CW4 A 310 Hide Details ( 8 )
Code Description Severity Comments Determined
Date Pending Assessed
SL01
WELL THAT PUMPS
DIRECTLY TO
DISTRIBUTION
LACKS A MEANS TO
RELEASE TRAPPED
AIR
MIN Didn't notice existence of an air release valve 03/04/2020 0 5
S001 UNAPPROVED
SOURCE IN SERVICE SIG ALL SOURCES DUE 12/23/2020 12/23/2019 0 200
S013
WELL LACKS THE
REQUIRED WELL
SEAL
SIG Well seal does not meet rule to the best knowledge of
engineer 03/04/2020 0 50
S020
WELL HEAD OR
WELL HOUSE NOT
PROTECTED FROM
FLOODING
SIG System intends to build a pad and well house to protect it
from flooding 03/04/2020 0 25
SP06
NEW WATER SOURCE
LACKS APPROVED
PER
SIG SOURCE LACKS AN APPROVED PRELIMINARY
EVALUATION REPORT.10/23/2023 50 0
S003
WELL CASING
TERMINATES LESS
THAN 12 INCHES
ABOVE FLOOR OR
LESS THAN 18
INCHES ABOVE
GROUND SURFACE
SIG
Has only a few inches clearance. System intends to grade
the area, install a concrete pad with a well house around it
that will meet the requirements.
03/04/2020 0 25
SP07
ACTIVE SOURCE
LACKS AN
APPROVED DWSP
PLAN
SIG SOURCE LACKS AN APPROVED DRINKING WATER
SOURCE PROTECTION PLAN.10/23/2023 25 0
S015
WELL LACKS A
MEANS TO MEASURE
WATER LEVELS
PERIODICALLY
MIN Needs a way to measure water level 03/04/2020 0 5
WS002 WELL #2 - CW11 A 255 Hide Details ( 6 )
PHYSICAL FACILITY POINTS Total Pts: 1190
Facility Facility Name Status Points Effective Details
Code Description Severity Comments Determined
Date Pending Assessed
S015
WELL LACKS A
MEANS TO MEASURE
WATER LEVELS
PERIODICALLY
MIN Need to measure water levels 03/04/2020 0 5
SP06
NEW WATER SOURCE
LACKS APPROVED
PER
SIG SOURCE LACKS AN APPROVED PRELIMINARY
EVALUATION REPORT.10/23/2023 50 0
SP07
ACTIVE SOURCE
LACKS AN
APPROVED DWSP
PLAN
SIG SOURCE LACKS AN APPROVED DRINKING WATER
SOURCE PROTECTION PLAN.10/23/2023 25 0
S013
WELL LACKS THE
REQUIRED WELL
SEAL
SIG Well seal does not meet rule to the best knowledge of
engineer 03/04/2020 0 50
S001 UNAPPROVED
SOURCE IN SERVICE SIG ALL SOURCES DUE 12/23/2020 12/23/2019 0 200
S020
WELL HEAD OR
WELL HOUSE NOT
PROTECTED FROM
FLOODING
SIG
System intended to build a pad and well house to protect it
from flooding but this may be unnecessary with new well
meant for drinking water.
08/08/2023 25 0
WS003 WELL #3 - CW3 A 285 Hide Details ( 7 )
Code Description Severity Comments Determined
Date Pending Assessed
SL01
WELL THAT PUMPS
DIRECTLY TO
DISTRIBUTION
LACKS A MEANS TO
RELEASE TRAPPED
AIR
MIN no relief valves or PRVs for part of system that goes
straight to distribution 03/04/2020 0 5
S013
WELL LACKS THE
REQUIRED WELL
SEAL
SIG Well seal does not meet rule to the best knowledge of
engineer 03/04/2020 0 50
SP07
ACTIVE SOURCE
LACKS AN
APPROVED DWSP
PLAN
SIG SOURCE LACKS AN APPROVED DRINKING WATER
SOURCE PROTECTION PLAN.10/23/2023 25 0
S015
WELL LACKS A
MEANS TO MEASURE
WATER LEVELS
PERIODICALLY
MIN Needs a way to measure water level 03/04/2020 0 5
SP06
NEW WATER SOURCE
LACKS APPROVED
PER
SIG SOURCE LACKS AN APPROVED PRELIMINARY
EVALUATION REPORT.10/23/2023 50 0
S002
WELL HOUSE NOT
PROTECTED
AGAINST
VANDALISM
SIG The entire property is fenced, but this well should be
individually fenced 03/04/2020 0 25
S001 UNAPPROVED
SOURCE IN SERVICE SIG ALL SOURCES DUE 12/23/2020 12/23/2019 0 200
WS004 WELL #4 - IW7 A 210 Hide Details ( 3 )
PHYSICAL FACILITY POINTS Total Pts: 1190
Facility Facility Name Status Points Effective Details
Code Description Severity Comments Determined
Date Pending Assessed
S015
WELL LACKS A
MEANS TO MEASURE
WATER LEVELS
PERIODICALLY
MIN This needs to be added to this well.08/08/2023 0 5
S001 UNAPPROVED
SOURCE IN SERVICE SIG ALL SOURCES DUE 12/23/2020 12/23/2019 0 200
SL01
WELL THAT PUMPS
DIRECTLY TO
DISTRIBUTION
LACKS A MEANS TO
RELEASE TRAPPED
AIR
MIN Needs to be added if used for drinking water.08/08/2023 0 5
SIGNIFICANT DEFICIENCY VIOLATIONS Total Pts: 600
ID Violation Code Deficiency Determined
Points
Effective
DS001
45 FAILURE ADDRESS
DEFICIENCY (GWR)
C001
SYSTEM DIRECT RESPONSIBLE CHARGE OPERATORS NOT
CERTIFIED AT THE REQUIRED LEVEL
10/23/2023 50
WS001
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S013 WELL LACKS THE REQUIRED WELL SEAL 10/23/2023 50
WS001
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S001 UNAPPROVED SOURCE IN SERVICE 10/23/2023 50
WS001
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S003
WELL CASING TERMINATES LESS THAN 12 INCHES ABOVE
FLOOR OR LESS THAN 18 INCHES ABOVE GROUND SURFACE
10/23/2023 50
WS001
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S020
WELL HEAD OR WELL HOUSE NOT PROTECTED FROM
FLOODING
10/23/2023 50
WS002
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S001 UNAPPROVED SOURCE IN SERVICE 10/23/2023 50
WS002
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S013 WELL LACKS THE REQUIRED WELL SEAL 10/23/2023 50
WS003
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S013 WELL LACKS THE REQUIRED WELL SEAL 10/23/2023 50
WS003
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S002 WELL HOUSE NOT PROTECTED AGAINST VANDALISM 10/23/2023 50
WS003
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S001 UNAPPROVED SOURCE IN SERVICE 10/23/2023 50
WS004
45 FAILURE ADDRESS
DEFICIENCY (GWR)
S001 UNAPPROVED SOURCE IN SERVICE 10/23/2023 50
45 FAILURE ADDRESS
DEFICIENCY (GWR)
G001 UNAPPROVED FACILITY IN SERVICE 10/23/2023 50
LEAD COPPER MONITORING AND QUALITY VIOLATIONS Total Pts: 0
Violation No.Period Code Description/Name Points Effective
CHEMICAL MONITORING RULE VIOLATIONS Total Pts: 150
Facility
Violation
No
Period Code Violation Type
Analyte
Group
Determined Seasonality
Points
Effective
WS002 2021-13
12/01/2020 -
01/01/2021
02
MCL,
AVERAGE
CIOC 12/01/2020 P 50
WS003 2021-12
12/01/2020 -
01/01/2021
02
MCL,
AVERAGE
CIOC 12/01/2020 P 50
WS001 2021-11
12/01/2020 -
01/01/2021
02
MCL,
AVERAGE
CIOC 12/01/2020 P 50
TREATMENT VIOLATIONS Total Pts: 0
Facility Violation No Period Code Violation Type Analyte Group Determined Points Effective
MICROBIAL RULE VIOLATIONS
Date Range Start: 10/01/2022
Total Pts: 0
Determine Date Compliance Period Code Violation Type Return To Compliance Points Effective
OPERATOR CERTIFICATION
Type Level Required Highest Certificate
Distribution Small System Dist 1
Treatment
CONSUMER CONFIDENCE REPORT Total Effective Points: 0
Violation No.Period Code Description/Name Points Effective
PUBLIC NOTIFICATION VIOLATIONS Total Pts: 0
Violation No.Date Code Description/Name Points Effective
IPS COMPLIANCE SCHEDULES
Type Required Activities Severity Created Due
ERROR:SP GWR CORRECT DEFICIENCY 90 DAYS SIG 10/23/2023 01/21/2024
ERROR:SP GWR CORRECT DEFICIENCY 90 DAYS SIG 10/23/2023 01/21/2024
ERROR:SP GWR CORRECT DEFICIENCY 90 DAYS SIG 10/23/2023 01/21/2024
ERROR:SP GWR CORRECT DEFICIENCY 90 DAYS SIG 10/23/2023 01/21/2024
ERROR:SP GWR CORRECT DEFICIENCY 90 DAYS SIG 10/23/2023 01/21/2024
ERROR:SP GWR CORRECT DEFICIENCY 90 DAYS SIG 10/23/2023 01/21/2024
Physical deficiency
schedule
WELL HEAD OR WELL HOUSE NOT PROTECTED FROM FLOODING SIG 08/17/2023 12/15/2023
Physical deficiency
schedule
SERVICE CONNECTIONS IN DISTRIBUTION SYSTEM RELY ON INDIVIDUAL
HOME BOOSTER PUMP DUE TO INADEQUATE PRESSURE
SIG 08/17/2023 12/15/2023
Physical deficiency
schedule
DIST SYSTEM UNABLE TO PROVIDE 20 PSI MIN PRESSURE FOR WATER LINES
CONSTRUCTED BEFORE JAN 1, 2007
SIG 08/17/2023 12/15/2023
OPERATOR
CERTIFICATION
SYSTEM DIRECT RESPONSIBLE CHARGE OPERATORS NOT CERTIFIED AT THE
REQUIRED LEVEL
SIG 03/24/2023 06/30/2023
Lead Copper Rule
Revisions
COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024
Lead Copper Rule
Revisions
SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024
Lead Consumer Notice SUBMIT LCN CERTIFICATE 07/01/2020 03/31/2021
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
CROSS CONNECTION PROGRAM IN PLACE MIN 03/26/2020 06/30/2021
BCA COMPLIANCE
SCHEDULES
COLLECT AND SUBMIT CHEM RESULTS 03/26/2020 06/23/2022
IPS COMPLIANCE SCHEDULES
Type Required Activities Severity Created Due
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
GWR CORRECT DEFICIENCY 120 DAYS SIG 03/26/2020 09/01/2023
BCA COMPLIANCE
SCHEDULES
SOURCE FACILITY DEFICIENCY- CORRECT 03/26/2020 06/12/2022
BCA COMPLIANCE
SCHEDULES
SOURCE FACILITY DEFICIENCY- CORRECT 03/26/2020 06/14/2022
BCA COMPLIANCE
SCHEDULES
SOURCE FACILITY DEFICIENCY- CORRECT 03/26/2020 06/15/2022
BCA COMPLIANCE
SCHEDULES
SOURCE FACILITY DEFICIENCY- CORRECT 03/26/2020 06/17/2022
BCA COMPLIANCE
SCHEDULES
DELIVER AND PROOF OF PN 03/26/2020 07/06/2021
BCA COMPLIANCE
SCHEDULES
SOURCE FACILITY DEFICIENCY- CORRECT 03/26/2020 06/20/2022
Lead Consumer Notice SUBMIT LCN CERTIFICATE 01/01/2020 09/28/2020