Loading...
HomeMy WebLinkAboutDDW-2024-005998Contacts Type: Administrative Contact Name: RYAN KEITH BELL Office: 435-259-9991 Emergency: Email: rkbservicesllc@gmail.com rbell@moabcity.org Site Information Legal Contact: THOMPSON SPECIAL SER DIST Address: HC11 BOX 400010 , THOMPSON, UT 84540 Phone: 435-285-9919 County: GRAND COUNTY System Type: Community Certification Required: SS Total Population: 76 Site Updates Last Inventory Update: 10/24/2022 Last Surveyor Update: 10/12/2022 Surveyor: MATTHEW DON HINCKLEY Operating Period: 1/1 - 12/31 Last IPS Update: 09/27/2023 20:21:12 Political Districts Representative: 69 Senate: 27 Water Usage Information per ERC Total Ips Points: 245 Public Water System IPS ReportDEQ | Drinking Water Thompson Special Services District PWS ID: UTAH10004 Rating: Approved 05/18/2015 Status: Active IPS SUMMARY Total IPS Points: 245 Admin & Physical Facilities Quality & Monitoring Significant Deficiency Violations 130 15 100 PHYSICAL FACILITY POINTS Total Pts: 130 Facility Facility Name Status Points Effective Details DS001 UTAH10004 DISTRIBUTION SYSTEM A 100 Hide Details ( 2 ) Code Description Severity Comments Determined Date Pending Assessed D016 DIST SYS LINE CONNECTED TO OR SUBJECT TO CONTAMINATION SIG DROP #5 WAS RECENTLY A CONTRIBUTOR OF A CROSS CONNECTION IN A HEAVY RAINSTORM DUE TO ITS DISCHARGE LEVEL IN A STREAM. IN YEARS PAST IT SEEMED TO BE ABOVE THE FLOOD LEVEL BUT RECENTLY HAS SHOWN OTHERWISE AND SHOULD BE ELEVATED ABOVE THE RECENT FLOOD LEVEL. 10/12/2022 0 50 M020 CROSS CONNECTION EXISTS IN WATER SYSTEM SIG THERE IS A CONNECTION MADE BY A HOMEOWNER DIRECTLY TO THE MAIN TRANSMISSION LINE WHICH DIVERTS A SIZABLE AMOUNT OF WATER FLOW FROM THAT LINE TO A PERSONAL HYDRO GENERATOR WHICH THEN HAS A RETURN FLOW TO THOMPSON SSD THROUGH AN UNKNOWN PIPELINE BELOW THE HOUSE. CROSS CONNECTION CONTROL OF THIS IS UNKNOWN BY THE SYSTEM. 10/12/2022 0 50 TP001 SPRING 1 CHLORINATOR A 30 Hide Details ( 2 ) Code Description Severity Comments Determined Date Pending Assessed TD09 CHLORINE ROOM EXHAUST FAN SUCTION NOT LOCATED NEAR FLOOR MIN no exhaust fan, no power onsite 10/07/2019 0 15 TD10 CHLORINE ROOM AIR INLET NOT LOCATED NEAR CEILING THROUGH WALL LOUVERS MIN 10/13/2011 0 15 SIGNIFICANT DEFICIENCY VIOLATIONS Total Pts: 100 ID Violation Code Deficiency Determined Points Effective DS001 45 FAILURE ADDRESS DEFICIENCY (GWR) D016 DIST SYS LINE CONNECTED TO OR SUBJECT TO CONTAMINATION 09/27/2023 50 DS001 45 FAILURE ADDRESS DEFICIENCY (GWR) M020 CROSS CONNECTION EXISTS IN WATER SYSTEM 09/27/2023 50 LEAD COPPER MONITORING AND QUALITY VIOLATIONS Total Pts: 0 Violation No.Period Code Description/Name Points Effective CHEMICAL MONITORING RULE VIOLATIONS Total Pts: 0 Facility Violation No Period Code Violation Type Analyte Group Determined Seasonality Points Effective TREATMENT VIOLATIONS Total Pts: 0 Facility Violation No Period Code Violation Type Analyte Group Determined Points Effective MICROBIAL RULE VIOLATIONS Date Range Start: 07/01/2022 Total Pts: 0 Determine Date Compliance Period Code Violation Type Return To Compliance Points Effective 03/01/2021 12/01/2020 - 12/31/2020 36 Failure to monitor and report distribution system chlorine residuals Y 0 03/01/2021 10/01/2020 - 10/31/2020 36 Failure to monitor and report distribution system chlorine residuals Y 0 03/01/2021 11/01/2020 - 11/30/2020 36 Failure to monitor and report distribution system chlorine residuals Y 0 OPERATOR CERTIFICATION Type Level Required Highest Certificate Distribution Small System Dist 3 Treatment CONSUMER CONFIDENCE REPORT Total Effective Points: 15 Violation No.Period Code Description/Name Points Effective 2023-7004791 07/01/2023 -71 CCR REPORT 15 PUBLIC NOTIFICATION VIOLATIONS Total Pts: 0 Violation No.Date Code Description/Name Points Effective IPS COMPLIANCE SCHEDULES Type Required Activities Severity Created Due CCR SCHEDULES Submit Consumer Confidence Report 01/01/2023 07/01/2023 CCR SCHEDULES Submit CCR Certification Letter 01/01/2023 10/01/2023 CORRECTIVE ACTION PLAN DIST SYS LINE CONNECTED TO OR SUBJECT TO CONTAMINATION SIG 10/23/2022 08/01/2023 CORRECTIVE ACTION PLAN CROSS CONNECTION EXISTS IN WATER SYSTEM SIG 10/23/2022 08/01/2023 Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024 Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024