Loading...
HomeMy WebLinkAboutDERR-2024-0065034/26/24, 12:18 AM State of Utah Mail - QAPP for Lelis Property, VCP Site C128 https://mail.google.com/mail/u/0/?ik=5be3741f93&view=pt&search=all&permthid=thread-f:1795957807755243648&simpl=msg-f:17959578077552436…1/2 Leigh Anderson <kanderson@utah.gov> QAPP for Lelis Property, VCP Site C128 2 messages King, Andy R <Andy.King@terracon.com>Wed, Apr 10, 2024 at 8:19 AM To: Leigh Anderson <kanderson@utah.gov> Cc: Brian <speedsafe@msn.com>, Craig Lelis <craig.lelis@gmail.com>, "Austin, Amy B" <Amy.Austin@terracon.com> Hello Leigh – attached for review please find our draft QAPP for the Lelis property. Also attached is a separate diagram showing the locations of the existing groundwater monitoring wells (Exhibit 7 from the November 2022 Phase II ESA report). Please be advised that we plan to conduct a round of groundwater monitoring from these wells, to be conducted in accordance with the procedures detailed in the QAPP. The monitoring event will include measurement of groundwater elevations and collection of samples for analysis from the five existing monitoring wells (MW-1, MW-4, MW-5, MW-6, and MW- 7). The groundwater elevation measurements will be used to assess the current groundwater flow direction. The groundwater samples (including one field duplicate) will be analyzed for TPH-GRO, VOCs, TPH-DRO(SGT), and Oil & Grease/TRPH. The groundwater sample with the highest contaminant concentration(s) will be further analyzed for TPH fractionation. Please let us know of any questions and/or approval of the QAPP, and with your concurrence we will schedule the groundwater monitoring event. Thanks, 4/26/24, 12:18 AM State of Utah Mail - QAPP for Lelis Property, VCP Site C128 https://mail.google.com/mail/u/0/?ik=5be3741f93&view=pt&search=all&permthid=thread-f:1795957807755243648&simpl=msg-f:17959578077552436…2/2 Andy R. King, P.G. Senior Project Manager I Environmental 6952 S. High Tech Drive Suite B I Midvale, Utah 84047 D (801) 746-5462 I F (801) 545-8600 I M (801) 638-7402 andy.king@terracon.com I Terracon.com Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability. Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access the hyperlink, please e-mail sender. 2 attachments 61237299 Lelis QAPP draft 040924_Optimized.pdf 3842K Exhibit 7 Monitoring Well Installation Map.pdf 1528K Leigh Anderson <kanderson@utah.gov>Wed, Apr 17, 2024 at 6:13 PM To: "King, Andy R" <Andy.King@terracon.com> Hey Andy, thanks for this, I am looking over it. We're still looking to try to get our EA comments to you, Bill is looking over them. [Quoted text hidden]