Loading...
HomeMy WebLinkAboutDERR-2024-0065644/25/24, 11:09 PM State of Utah Mail - Fwd: NWOD - Second Annual Inspection Report https://mail.google.com/mail/u/0/?ik=5be3741f93&view=pt&search=all&permthid=thread-f:1785752438725464684&simpl=msg-f:17857524387254646…1/3 Leigh Anderson <kanderson@utah.gov> Fwd: NWOD - Second Annual Inspection Report 2 messages Bill Rees <brees@utah.gov>Tue, Dec 19, 2023 at 3:49 PM To: Leigh Anderson <kanderson@utah.gov> Please review. Bill Bill Rees Section Manager VCP/Brownfields Section P: (385) 391-8120 environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. ---------- Forwarded message --------- From: Paul Fuglevand <pfuglevand@dofnw.com> Date: Tue, Dec 19, 2023 at 3:42 PM Subject: NWOD - Second Annual Inspection Report To: Bill Rees <brees@utah.gov>, Ken Wangerud (wangerud.ken@epa.gov) <wangerud.ken@epa.gov> Cc: Armstrong, Alice E <AliceArmstrong@chevron.com>, Heywood, Mandy <mandy.heywood@slcgov.com>, John Amato <John.Amato@chevron.com>, Johnson, Paul <Paul.Johnson4@bp.com>, Stewart, Jesse <Jesse.Stewart@slcgov.com>, Wandor, David <David.Wandor@parsons.com>, Dave Cooper <dcooper@dofnw.com> Bill Rees, UDEQ, and Ken Wangerud (EPA) 4/25/24, 11:09 PM State of Utah Mail - Fwd: NWOD - Second Annual Inspection Report https://mail.google.com/mail/u/0/?ik=5be3741f93&view=pt&search=all&permthid=thread-f:1785752438725464684&simpl=msg-f:17857524387254646…2/3 Attached is the second annual inspection report for the Northwest Oil Drain (NWOD) Site, completed per the Post Removal Site Control Plan (PRSCP) (DOF 9/17/2021). The visual inspection occurred on July 6, 2023, and the measurement of cover thickness at SPA 1 occurred on November 14, 2023. The report is based on the template included in the Post Removal Site Control Plan (PRSCP). The primary findings of the report are summarized below. Sheen Monitoring Report. There was no sheen monitoring per the PRSCP, as no sheen was detected during the 2022 inspection. No corrective action or specific follow-up is required. SPA 1 and SPA 1A Monitoring. * Fences and gates in generally good condition with no damage or breaches. * The warning sign at the south gate of SPA 1 was replaced as it was partially obscured by graffiti as noted in the 2022 annual inspection report. * Canal water adjacent to the SPAs was free of sheen. * Pictures include SPA 1 and SPA 1A and of the canal adjacent to SPAs. * SPA 1A appeared to be generally undisturbed and in good condition. * SPA 1 * Was in good condition with no significant ruts or gouges. * The thickness of gravel over orange geotextile marker bed was measured by surveying by Diamond Land Surveying. * Cover thickness ranged from 0.62’ (location T5) to 1.58’ (location T1). Corrective Actions * SPA 1A ‐ No corrective action or specific follow up is required. * SPA 1 ‐ No corrective action required for gravel cover thickness as the trigger criteria is 0.5’. Feel free to contact me with any questions or concerns. Paul Fuglevand Dalton, Olmsted & Fuglevand, Inc. Cell 206 660-3079 This electronic message transmission contains information that may be confidential and/or privileged work product prepared in anticipation of litigation. The information is intended for the use of the individual or entity named above. If you are not the intended recipient, please be aware that any disclosure, copying distribution or use of the contents of this information is prohibited. If you have received this electronic transmission in error, please notify me by telephone at (425) 827-4588, or by electronic mail, pfuglevand@dofnw.com<mailto:pfuglevand@dofnw.com> 4/25/24, 11:09 PM State of Utah Mail - Fwd: NWOD - Second Annual Inspection Report https://mail.google.com/mail/u/0/?ik=5be3741f93&view=pt&search=all&permthid=thread-f:1785752438725464684&simpl=msg-f:17857524387254646…3/3 2 attachments noname 6021K NWOD SPA 2023 Monitoring Report_Final_121923.pdf 5989K Bill Rees <brees@utah.gov>Tue, Jan 30, 2024 at 2:11 PM To: Leigh Anderson <kanderson@utah.gov> [Quoted text hidden] 2 attachments noname 6021K NWOD SPA 2023 Monitoring Report_Final_121923.pdf 5989K